MONTHYEARML24179A0642024-08-13013 August 2024 Memo - Summary of May 16, 2024, Partially Closed Pre-Application Public Meeting with Westinghouse Columbia Fuel Fabrication Facility ML24179A0662024-08-13013 August 2024 Enclosure 2 - Open Session Meeting Summary - Public ML24109A0002024-04-19019 April 2024 Public Meeting Summary - Licensee Performance Review for Westinghouse Columbia Fuel Fabrication Facility, Docket Number 70-1151 ML22041A2022022-03-14014 March 2022 Westinghouse Trip Summary January 19-20, 2022 ML22161A9412021-10-18018 October 2021 Westinghouse, September 2021 Virtual Meeting Summary & Proposed Actions ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML20094L4682020-04-0303 April 2020 Summary of Meeting with Westinghouse to Discuss Nrc'S Evaluation of Performance in Four Major Areas of Safety Operations, Radiological Controls, Facility Support and Safeguards During Calendar Year 2019 ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2232019-08-16016 August 2019 Summary of June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18443-P/NP, Qualification of the Two-Dimensional Transport Code Paragon2 ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18130A7332018-05-10010 May 2018 Westinghouse Public Meeting Summary May 2018 ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML18039A0012018-02-0707 February 2018 Westinghouse Public Meeting Summary February 2018 ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17332A4452018-01-17017 January 2018 Summary of the December 12, 2017, Meeting with Westinghouse Regarding the AC160 Controller Watchdog Timer Issue Causal Analysis 2024-08-13
[Table view] Category:Memoranda
MONTHYEARML24179A0642024-08-13013 August 2024 Memo - Summary of May 16, 2024, Partially Closed Pre-Application Public Meeting with Westinghouse Columbia Fuel Fabrication Facility ML22103A2422022-04-29029 April 2022 Westinghouse Trip Report March 24, 2022 ML22054A0462022-03-0404 March 2022 Westinghouse Electric Co. LLC - Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility (Enterprise Project Identifier L-2021-LLA-0204) ML21202A1112021-10-0404 October 2021 Westinghouse Electric Company, LLC Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML21053A3372021-03-0303 March 2021 Safety Evaluation Report Related to Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Specific Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facil ML21033A6722021-02-19019 February 2021 Memorandum to J.Quintero, NRC, Re Environmental Impact Statement Scoping Summary Report for Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20329A3532020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19283A8112019-10-16016 October 2019 Summary of May 2019 Site Visit and Information Needs Related to the U.S. Nuclear Regulatory Commission'S Review of the Environmental Program in the License Renewal Application for the Westinghouse Columbia Fuel Fabrication Facility ML19231A0212019-08-30030 August 2019 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0, and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2122019-08-16016 August 2019 07/23-25/2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Fuel Performance ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18213A0702018-08-16016 August 2018 Summary of Westinghouse Electric Company 2018 Fuel Performance Update Meeting ML18213A1402018-08-16016 August 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp) ML18177A2702018-07-0909 July 2018 Summary of the Closed Audit June 11-12, 2018, of the Westinghouse Electric Company Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D. ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17356A0842018-01-24024 January 2018 12/13/2017 NMFS Call Summary Regarding Westinghouse Cfff License Renewal Sturgeon Consultation ML17352A6402018-01-10010 January 2018 Summary of Closed Audit for the Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0 and Wcap-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio. 2024-08-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 1, 2019 MEMORANDUM TO: Jacob I. Zimmerman, Chief Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards FROM: Matthew Bartlett, Project Manager /RA/
Fuel Facility Licensing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards
SUBJECT:
SUMMARY
FOR PUBLIC TELECONFERENCE HELD MARCH 27, 2019, TO DISCUSS THE RESPONSES TO THE REQUEST FOR ADDITIONAL INFORMATION REGARDING THE WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY LICENSE RENEWAL (DOCKET NUMBER: 07001151)
On March 27, 2019, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public teleconference with Westinghouse Electric Company, LLC (WEC), Columbia Fuel Fabrication Facility. The purpose of the meeting was to allow the WEC staff an opportunity to describe their proposed responses to the request for additional information (RAI) submitted January 18, 2019, (Agencywide Documents Access and Management System Accession Number ML18308A008). The RAI response package will include an updated submittal of the license renewal application and environmental report.
The WEC staff provided an overview of their proposed responses to the RAIs. They plan to submit the formal package to the NRC staff on March 28th. It will include the RAI responses, an updated environmental report, and updated license renewal application. A more in depth summary of the call is provided in Enclosure 1 and the meeting participants in Enclosure 2.
CONTACT: Matthew Bartlett, NMSS/FCSE 301-415-7154 Docket Number: 07001151 License Number: SNM-1107
Enclosures:
- 1) Meeting Summary
- 2) Participant List cc: N. Parr, WEC
J. Zimmerman 2
SUBJECT:
SUMMARY
FOR PUBLIC TELECONFERENCE HELD MARCH 27, 2019, TO DISCUSS THE RESPONSES TO THE REQUEST FOR ADDITIONAL INFORMATION REGARDING THE WESTINGHOUSE COLUMBIA FUEL FABRICATION FACILITY LICENSE RENEWAL (DOCKET NUMBER: 07001151)
DATED: May 1, 2019 DISTRIBUTION:
FCSE r/f MDiaz, FFLB TVukovinsky, RII ADAMS Accession Number: ML19092A308 OFFICE FCSE/FFLB FCSE/FFLB FCSE/FFLB FCSE/FFLB NAME MBartlett JQuintero TBrockington JZimmerman DATE 04/10/2019 04/12/2019 04/26/2019 05/01/2019 OFFICIAL RECORD COPY
SUMMARY
OF PUBLIC MEETING TO DISCUSS WESTINGHOUSE PROPOSED RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION DATE AND TIME: March 27, 2019 LOCATION: Teleconference PURPOSE:
Westinghouse Electric Company, LLC (WEC) presented their proposed responses to the U.S.
Nuclear Regulatory Commissions (NRCs) request for additional information (RAI) regarding the environmental program for the license renewal application (LRA) and related environmental report (ER).
BACKGROUND:
In June 2018, the NRC published its Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) related to the license renewal review. In July 2018, WEC notified the NRC of a leak that released contamination into the subsurface and that they were pursuing additional investigation into a separate leak from a contaminated wastewater pipe. Since this information emerged after the NRC published its EA and FONSI, the NRC staff decided to re-open the environmental review. The NRC staff developed RAIs related to WECs environmental protection and decommissioning programs, dated January 18, 2019, (Agencywide Documents Access and Management System Accession Number ML18308A008).
In the teleconference, WEC staff provided an overview of their proposed responses to the RAIs, prior to the planned formal submittal on March 28, 2019.
DISCUSSION:
The WEC staff stated their submittal will include a letter that summarizes their response to each RAI (i.e., RAI ENV-1 and 2), an updated ER, and updated LRA. This submittal will incorporate all RAI responses since 2014 and will supersede the previous responses. The NRC staff confirmed that this approach would be acceptable. The WEC staff indicated they would provide a redline strikeout version of the documents on their SharePoint site to facilitate the NRC staffs review.
The WEC staff provided an overview of their responses to the RAIs starting with RAI ENV-1.
They updated the ER in multiple locations to address environmental impacts related to groundwater and surface water from radiological contaminants. The WEC staff stated they will only summarize preliminary results from ongoing investigations of the potential migration pathways. WEC is dividing the site into Operable Units. However, those units are not defined in the ER or LRA because WEC has not received final approval for the Operable Units from the South Carolina Department of Health and Environmental Control (State). The WEC staff stated that they will provide environmental monitoring data from 2010 to present. However, if the NRC needs data from 2007-2010, they will need more time to access that information. The WEC staff explained that the ER was updated to include information on three leaks and one flood event that occurred since 2007 including: a 2011 contaminated waste water line leak; a 2014 leak from a cylinder recertification transfer line; a 2015 flood event; and a 2018 hydrofluoric spiking station leak.
Enclosure 1
For its response to RAI ENV-2, the WEC staff explained that they updated Chapters 10, Environmental Protection, and 11, Decommissioning Planning, of the LRA. Chapter 10 was revised to include a reference to their conceptual site model (CSM). Other changes included groundwater well monitoring and sampling. The CSM will be used over time to identify any data gaps where additional sampling should be conducted. The CSM will also be used to optimize the location of future sampling sites. The WEC staff believes the CSM and the use of Operable Units will address all potential receptors.
The WEC staff indicated that its Consent Agreement with the State will address past releases.
The Consent Agreement replaces the Voluntary Cleanup Contract that was in place between WEC and the State, which only addressed volatile organic compounds in groundwater. WEC has developed a new remediation procedure, referenced in Chapter 11 of the LRA, which will be used to address future leaks and spills. The new remediation procedure will be made available for the NRC staff review but will not be included as part of the RAI responses. The WEC staff stated their environmental program, CSM, and remediation procedure will prevent offsite contamination, minimize onsite contamination, and comply with regulatory requirements. The WEC staff indicated the data in their submittal is current through 2018 and the site description is consistent with the 2019 Integrated Safety Analysis Summary update.
The WEC staff confirmed the RAI responses would be submitted to the NRCs Document Control Desk by March 29, 2019. The NRC staff will review the response and notify WEC with any follow-up issues.
RESULTS:
The NRC staff received a description of WECs proposed RAI responses and asked for clarification on a number of issues about the structure of the submittal, location of data, and WECs plans to provide supporting documentation.
Docket No. 07001151 License No. SNM-1107 2
PARTICIPANTS AT MEETING TO DISCUSS WESTINGHOUSE PROPOSED RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION ON ENVIRONMENTAL AND DECOMMISSIONING ISSUES March 27, 2019, 1:00pm - 3:30pm Name Organization/Company Nancy Parr Westinghouse Annette Pope Westinghouse Diana P. Joyner Westinghouse Doug Weaver Westinghouse Amanda Spalding Westinghouse Gerard Couture Westinghouse Valerie Calmec Westinghouse Mike King NRC/FCSE Cinthya Roman NRC/FCSE Jessie Quintero NRC/FCSE Jake Zimmerman NRC/FCSE Matt Bartlett NRC/FCSE Marilyn Diaz Maldonado NRC/FCSE John Saxton NMSS/DUWP Jin-Ping Gwo NMSS/DSFM Tom Vukovinsky NRC/RII Enclosure 2