EPID:L-2018-TOP-0012, Summary of the Pre-Submittal Closed Meeting for the Westinghouse Electric Company Future Submittal of WNG-2 Topical Report (Open) |
|
MONTHYEARML18102A9112018-04-0303 April 2018, 15 June 2018 Summary of the Pre-Submittal Closed Meeting for the Westinghouse Electric Company Future Submittal of WNG-2 Topical Report Project stage: Request ML18177A1682018-05-24024 May 2018, 2 July 2018 Summary of Closed Meeting with Westinghouse Electric to Discuss Restart of WCAP-15942-P-A/WCAP-15942-Np-A, Supplement 1, Revision 1, Material Changes for Svea-96 Optima2 Fuel Assemblies, Topical Report Project stage: Request ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report Project stage: Meeting ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report Project stage: Meeting ML19085A0062019-05-0101 May 2019 Cover Letter Revised Draft Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 OPTIMA2 Fuel Assemblies, Project stage: Draft Approval 2018-06-15
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML22041A2022022-03-14014 March 2022 Westinghouse Trip Summary January 19-20, 2022 ML22161A9412021-10-18018 October 2021 Westinghouse, September 2021 Virtual Meeting Summary & Proposed Actions ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20121A2592020-04-30030 April 2020 Westinghouse License Renewal - ISA Review- Conference Call Summary Dec 2017 ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML20094L4682020-04-0303 April 2020 Summary of Meeting with Westinghouse to Discuss Nrc'S Evaluation of Performance in Four Major Areas of Safety Operations, Radiological Controls, Facility Support and Safeguards During Calendar Year 2019 ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2232019-08-16016 August 2019 Summary of June 27, 2019, Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18443-P/NP, Qualification of the Two-Dimensional Transport Code Paragon2 ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18130A7332018-05-10010 May 2018 Westinghouse Public Meeting Summary May 2018 ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML18039A0012018-02-0707 February 2018 Westinghouse Public Meeting Summary February 2018 ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17332A4452018-01-17017 January 2018 Summary of the December 12, 2017, Meeting with Westinghouse Regarding the AC160 Controller Watchdog Timer Issue Causal Analysis 2022-03-14
[Table view] Category:Memoranda
MONTHYEARML22103A2422022-04-29029 April 2022 Westinghouse Trip Report March 24, 2022 ML22054A0462022-03-0404 March 2022 Westinghouse Electric Co. LLC - Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility (Enterprise Project Identifier L-2021-LLA-0204) ML21202A1112021-10-0404 October 2021 Westinghouse Electric Company, LLC Request for Alternate Disposal and Exemptions for Columbia Fuel Fabrication Facility Waste Disposal at the Us Ecology Idaho Facility ML21054A0922021-03-0404 March 2021 Summary of Public Meeting to Discuss the Status of the Westinghouse Columbia Fuel Fabrication Facility License Renewal ML21053A3372021-03-0303 March 2021 Safety Evaluation Report Related to Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Specific Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facil ML21033A6722021-02-19019 February 2021 Memorandum to J.Quintero, NRC, Re Environmental Impact Statement Scoping Summary Report for Westinghouse Columbia Fuel Fabrication Facility License Renewal Application ML20329A3532020-11-30030 November 2020 Safety Evaluation Report Related to a Request for 10 CFR 20.2002 Alternate Disposal Approval and Exemptions from 10 CFR Part 30 and 10 CFR Part 70 for Disposal of Columbia Fuel Fabrication Facility Waste at the Us Ecology Idaho Facility ML20254A1622020-09-11011 September 2020 Summary of the September 1, 2020 Closed Meeting with Westinghouse to Discuss Staff'S Draft RAIs on Alternate Disposal Approval of Specified Low Activity Radioactive Materials ML20115E3972020-04-29029 April 2020 Summary of April 23, 2020, Pre-Submittal Meeting with Westinghouse Electric Company (WEC) Regarding WEC Quality Management System(Qms) Changes Due to COVID-19 ML20100H1432020-04-16016 April 2020 Summary of Closed Pre-Submittal Meeting for the Future Submittal of Westinghouse Electric Company (Westinghouse) WCAP-18482-P, Westinghouse Advanced Doped Pellet Technology(Adopt Tm) Fuel ML20083H9552020-04-10010 April 2020 Summary of September 18-19, 2019, Partially Closed Meeting to Discuss Westinghouse Electric Company Encore Accident Tolerant Fuel: Chromium Coated Cladding ML19304A0932020-02-0505 February 2020 Summary of Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss the Topical Report Related to Removing the Technical Specification Requirements for the Common Qualification System ML19283A8112019-10-16016 October 2019 Summary of May 2019 Site Visit and Information Needs Related to the U.S. Nuclear Regulatory Commission'S Review of the Environmental Program in the License Renewal Application for the Westinghouse Columbia Fuel Fabrication Facility ML19231A0212019-08-30030 August 2019 Verification Letter of the Approval Version of Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0, and WCAP-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio ML19218A1682019-08-16016 August 2019 Memo: Summary of June 27, 2019, Closed Meeting with the Westinghouse Electric Company to Discuss Future Submittal of WCAP-18446-P, Incremental Extension of Burnup Limit for Westinghouse Fuel with Zirlo Cladding and Optimized Zirlo Cladding ML19218A2122019-08-16016 August 2019 07/23-25/2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Fuel Performance ML19175A1602019-07-0909 July 2019 04/01-04/15/2019 Summary of Closed Audit of the Westinghouse Electric Company Topical Report WCAP-18240-P/WCAP-18240-NP, Revision 0, Westinghouse Thermal Design Procedure (Wtdp) ML19150A5572019-06-24024 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Common Qualified Platform Topic Report (WCAP-16097) Watchdog Timer Changes ML19143A1362019-06-12012 June 2019 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-10965-P-A, Addendum 3, Updated Nexus Cross-Section Methodology (EPID-L-2019-TOP-0009) ML19092A3082019-05-0101 May 2019 03/27/19 Summary for Public Meeting to Discuss the Responses to the RAIs Regarding the WEC License Renewal with Enclosures ML19028A1242019-02-14014 February 2019 Summary of January 17, 2019 Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Technology ML19022A0722019-01-28028 January 2019 Summary of Meeting with Westinghouse Electric Company to Discuss RAI Response Related to NRC Review of WCAP-16260-P/WCAP-16260-NP, Revision 2, the Spatially Corrected Inverse Count Rate (Scicr) Method for Subcritical Reactivity Measurement. ML18361A6652019-01-25025 January 2019 Summary of December 4-5, 2018, Closed Audit of the Westinghouse Electric Company Topical Report WCAP-17794-P, Revision 0, and WCAP-17794-NP, Revision 0, 10x10 Svea Fuel Critical Power Experiments and New CPR Correlation: D5 for SVEA-96 Opti ML18330A2552018-12-18018 December 2018 Summary for Public Meeting and Enclosures 1-3: Held November 8, 2018, to Discuss the License Renewal, Environmental Analysis and Leaks at the Westinghouse Columbia Fuel Fabrication Facility ML18278A0262018-10-16016 October 2018 Summary of Closed Meeting to Discuss Westinghouse Electric Company Accident Tolerant Fuel Licensing Plan ML18213A0702018-08-16016 August 2018 Summary of Westinghouse Electric Company 2018 Fuel Performance Update Meeting ML18213A1402018-08-16016 August 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Future Submittal of WCAP-18240-P, Westinghouse Thermal Design Procedure (Wtdp) ML18177A2702018-07-0909 July 2018 Summary of the Closed Audit June 11-12, 2018, of the Westinghouse Electric Company Topical Report WCAP-16747-P/WCAP-16747-NP, Appendices C and D, POLCA-T: System Analysis Code with Three-Dimensional Core Model, Appendices C and D. ML18177A2392018-07-0202 July 2018 Summary of Closed Meeting with Westinghouse Electric Company to Discuss Restart of WCAP-15942-P-A/WCAP-15942-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies, Topical Report ML18156A2282018-06-15015 June 2018 Summary of April 13-18, 2018, Closed Pre-Submittal Meeting with Westinghouse Electric Company to Discuss Future Submittal of WNG-2 Topical Report ML18057A0382018-03-19019 March 2018 Summary of Closed Meeting to Discuss Implementation Plan for the Westinghouse Electric Company Topical Report WCAP-17642-P-A/WCAP-17642-NP-A, Revision 1 ML18036A4672018-02-0808 February 2018 Meeting Summary on Westinghouse Sale and License Transfer Application ML17353A0802018-01-24024 January 2018 December 13, 2017 Summary of Teleconference with South Carolina Department of Health and Environmental Control Related to the Rc Review of Westinghouse'S Columbia Fuel Fabrication Facility License Renewal Application ML17356A0842018-01-24024 January 2018 12/13/2017 NMFS Call Summary Regarding Westinghouse Cfff License Renewal Sturgeon Consultation ML17352A6402018-01-10010 January 2018 Summary of Closed Audit for the Westinghouse Electric Company Topical Report WCAP-18032-P, Revision 0 and Wcap-18032-NP, Revision 0, Calculation of Mixed Core Safety Limit Minimum Critical Power Ratio. 2022-04-29
[Table view] |
Text
June 15, 2018 MEMORANDUM TO: Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation FROM: Ekaterina Lenning, Project Manager R/A Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF APRIL 13-18, 2018, CLOSED PRE-SUBMITTAL MEETING WITH WESTINGHOUSE ELECTRIC COMPANY TO DISCUSS FUTURE SUBMITTAL OF WNG-2 TOPICAL REPORT (EPID: L-2018-TOP-0012)
On April 13-18, 2018, a closed pre-submittal meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and Westinghouse Electric Company (Westinghouse) representatives. The purpose of the meeting was for Westinghouse to present information on the future submittal of Westinghouse WNG-2 Topical Report and the NRC staff to observe testing. The summary of the meeting is enclosed.
Enclosure:
Meeting Summary CONTACT: Ekaterina Lenning 301-415-3151
ML18102A911 (Package); ML18092A065 (Notice);
ML18156A228 (Summary) NRC-001 OFFICE NRR/DLP/PLPB/PM NRR/DSS/SNPB/BC NRR/DLP/PLPB/BC NRR/DLP/PLPB/PM NAME ELenning SKrepel DMorey SSanders for ELenning DATE 06/05/18 6/14/18 6/15/18 6/15/18 U.S. NUCLEAR REGULATORY COMMISSION
SUMMARY
OF THE APRIL 13-18, 2018, CLOSED MEETING FOR THE WESTINGHOUSE ELECTRIC COMPANY FUTURE SUBMITTAL OF WNG-2 TOPICAL REPORT Four U.S. Nuclear Regulatory Commission (NRC) staff from the Nuclear Performance and Code Review Branch (SNPB) participated in a meeting with Westinghouse Electric Company at their critical heat flux experimental facility in Vsters, Sweden on April 13 through 18, 2018 (Reference 1). During the first day of the meeting, the NRC staff walked down both the ODEN and the FRIGG test loops, which are used for thermal-hydraulic testing for pressurized water reactors and boiling water reactors, respectfully. During the walk down, the NRC staff were able to examine the test equipment, instrumentation, control room, and overall experimental set-up. Because the test facility has restricted access during testing due to the high pressure high temperature water in the piping, the NRC staff arrived early on site to tour the facility before the system was fully pressurized. This represented a unique opportunity to walk down the test facility with both the staff who run the tests and those who use the test data to develop correlations.
The second day of meetings focused on the test procedures for the ODEN loop. The discussion focused on the instrumentation in the loop, the redundancy of the instrumentation, and the instrumentation uncertainties. The NRC staff questioned Westinghouse on the criteria used to ensure loop steady-state conditions, the criteria used when taking a data point, the definition of critical heat flux that is applied during testing, and typical test matrices. Other topics of discussion included history of ODEN and FRIGG loops, history of the Columbia University Heat Transfer Research Facility (the antecedent of the ODEN loop), and Quality Assurance program applied during testing and correlation development among other topics of discussions. Additionally, the NRC staff was able to witness and discuss the ODEN loop startup testing involving the heat balance. Majority of the second day discussions helped the NRC staff to better understand the facility and the testing performed there, and also gain a better understanding of the WNG-2 correlation topical report (TR) that Westinghouse plans to submit to NRC for review and approval.
The third day of meetings initially focused on the test procedures for the FRIGG loop. The NRC and Westinghouse staff discussed similar topics surrounding steady-state and transient test procedures as in the previous day, including the criteria used to ensure loop stability, the criteria used when taking a data point, and the definition of boiling transition applied during testing.
The Westinghouse and NRC staff also discussed perspectives on the dryout phenomenon and how it is similar to and different from departure from nucleate boiling and other related thermal-hydraulic concepts. In addition, Westinghouse provided the NRC staff with an update about the ongoing investigation into the fuel failure that occurred at the Leibstadt Nuclear Power Plant (KKL) in Switzerland a few years ago.
Overall, the NRC staff were able to fulfill their objectives during this trip. They were able to come to a much better understanding of the experimental setup of both the FRIGG and ODEN loops, the instrumentation that was used and its associated uncertainties, the process for capturing data and the various criteria used to determine if the data point was acceptable, and Enclosure
the process used to develop and validate critical boiling transition models from the data. The NRC staff also gained a better understanding of the FRIGG loop test procedures and critical power correlations developed from FRIGG loop data, which were in use at KKL when the failure occurred. Westinghouse also presented newest information that has emerged from hot-cell examinations. Finally, the NRC reviewer, who is new to this field, was able to participate in this information exchange, and was able to discuss with Westinghouse and other NRC staff much of the information that will be summarized in the future submittal. Historically, the ability to participate first-hand in these discussions has resulted in significantly shorter review times with the number of request for additional information questions greatly reduced.