Forwards Deficiency Repts Inadvertently Sent to Region 3 Instead of IE Headquarters
ML19320C302
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 07/08/1980
From: Wuller G
ILLINOIS POWER CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19320C303 List:
References
L14-80(07-08)-0, U-0153, U-153, NUDOCS 8007160626
Download: ML19320C302 (2)


Text

....- o U-0153

/LLIN0/S POWER COMPANY  ;?l:)l L14-80(07-08)-0

.f _ " ; 500 SOUTH 27TH STREET, DECATUR, ILUNOIS 62525 July 8, 1980 Mr. Victor Stello, Jr., Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Stello:

Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Cons truction Permits No. CPPR-137 & CPPR-138 Mr. H. M. Wescott, Inspector NRC Region III, requested that we review'our records on 10CFR50.55(e), Deficiency Reporting, issues relative to the distribut!on of information copies to your office.

Enclosed are copies of the below listed Illinois Power Company letters sent to NRC Region III regarding 10CFR50.55(e) matters which were inadvertently not sent to NRC Headquarters.

1. Letter 2/26/80 (U-0124), subject matter: defective plug welding on swinging dividers for control room termination cabinets (interim report).
2. Letter 3/31/80 (U-0136), subject matter: use of incorrect soil characteristic value by architect /

engineer as design input for developing building response spectra (interim report) .

3. Letter 4/30/80 (U-0137), subject matter: breakdown in General Electric Co. C&ID quality system; improper QA documentation provided for some local panels (final report).

-4. Letter 6/13/80 (U-0148), subject matter: concrete embeds which provide lateral support for residual heat rencval (RHR) heat exchangers not to design 4 epecification (interim report).

5. Letter 6/24/80 (U-0150), subj ect matter: deficiency in control rod drive (CRD) penetration through drywell '

l wall-(interim report).

Spo/7 i s l hl

  • *
  • 718 0(r%

U-0153 Ll4-80(07-08)-0

-1k.' Victor Stello, Jr. July 8, 1980 We apologize for any inconvenience this oversight en our

. part may have-caused.,' Rest assured that in the future, copies of all-correspondence sent to the NRC Region III on deficiency reporting will.be forwarded to your office, per 10CFR50.55(e)(3) .

Sincerely, G. E. Wuller Supervisor - Licensing Generation Engineering Dept.

GEW/em-Enclosure cc: J. G. Keppler, NRC Region III (w/o attachment)

H. M. Wescott, NRC Region III H. H. Livermore, NRC Resident Inspector c

,. . _ . _ - 'a . _ - - ._ . . . . . _ _ _ _ . . . _ .

U-0124 ILLINOIS POWER COMPANY .

4[,}.,-.T, L14 .80(02-26)-9 .

e~" .,

500 SOUTH 27TH STREET DECATUR ILUNolS 62525

~

February 26, 1980

- :. : .. . . . 4. : .

c '.. .. ~r ... --.. .

.. .1;V:..'~ ?*b7;%:;: ^.79 ; 55$; 5jR.%

'~*

*:-:L= *qQfj:; _

' ' " ' " ' ~ ~ ' ~

Mr. ' James G. Keppler Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Comission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Clinton Power Station Units 1 & 2

  • Docket Nos. 50-461 and 50-462 .

Construction Permit Nos. CPPR-137 and CPPR-138

'The potential reportable condition of which you were verbally notified on 1/28/80 has been reviewed and determined to be covered by the intent of 10CFR50.55(e) . The tentative classification has been determined to be in accordance with Paragraph (i), "A break-down in any portion of. the quality assurance pro accordance with the requirements of Appendix B." gram conducted in

. Our investigations to date indicate that some CPS control room termination cabinets appear to have defective plug welding on the swinging dividers. We do not however, have sufficient information at this time to determine the full extent of the problem, the appropriate corrective action, or a program for prevention of re-currence.

'ecause of the ' insufficient information described above, you B

are advised that this is to be considered an interim report in accordance with th: irovisions of Subparagraph (3) of 10CFR50.55(e) .

We expect to file s complete report in approximately ninety days.

Sincerely,

~

/ d

/ J. Koch Vice President ,

( GEW/jh W /