Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H6231999-10-18018 October 1999 Discusses Completion of Licensing Action for GL 98-01 & Suppl 1, Yr 2000 Readiness of Computer Sys at Npps, to All Holders of Operating Licenses for NPPs ML20217J4331999-10-15015 October 1999 Forwards Insp Rept 50-461/99-19 on 990913-17.One Violation Re Individual Failure to Follow Radiation Protection Procedures When Accessing High Radiation Area Noted & Being Treated as Noncited Violation U-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station ML20217A9881999-10-0101 October 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A7361999-10-0101 October 1999 Forwards Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Identified,One Re Failure to Place Control Switch in Proper Position to Identify Piece of out-of-svc Equipment & Being Treated as NCVs ML20217J1251999-09-30030 September 1999 Refers to Investigation 3-1997-040 Conducted from 971028- 980921 & Forwards Nov.Investigations Determined That During Jan 1997,supervisor Qv Dept Discriminated Against Qv Inspector in Retaliation for Inspector Contacts with NRC ML20217J1421999-09-30030 September 1999 Refers to Investigation 3-97-040 Conducted from 971028- 980921 & Forwards Nov.Investigation Concluded That Recipient Engaged in Deliberate Misconduct in That Recipient Discriminated Againt Qv Inspector for Having Contacted NRC ML20212G6751999-09-22022 September 1999 Forwards Comment Submitted to NRC by Environ Law & Policy Ctr Re Proposed License Transfer for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability ML20217H3421999-09-17017 September 1999 Forwards Request for Addl Info Re Licensee 990723 Application for License Transfer & Conforming Administrative License Amend.Response Requested within 20 Days of Receipt of Ltr 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed ML20211Q2671999-09-0808 September 1999 Informs That NRC Tentatively re-scheduled Initial Licensing Exams for License Operator License Applicants During Weeks of June 5 & 12,2000.Validation of Exams Will Occur at Station During Weeks of May 15,2000 U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 ML20211D2201999-08-23023 August 1999 Confirms 990817 Telcon with J Neuschwanger & D Mcneil Re Arrangements Made for NRC to Inspect Licensed Operator Requalification Program at Plant U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired ML20211A8931999-08-19019 August 1999 Forwards Insp Rept 50-461/99-13 on 990611-0728.Two Violations Noted & Being Treated as Ncvs.Violation Re Three Examples Where Licensee Procedural Requirements for Minor Maint Work Were Not Followed U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 ML20210U3771999-08-12012 August 1999 Forwards Notice of Consideration of Approval of Transfer of FOL & Issuance of Conforming Amend & Opportunity for Hearing Re Amend Request for Approval of Clinton Power Station License NPF-62 Transfer to Amergen U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 ML20210A4401999-07-16016 July 1999 Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations ML20209G7671999-07-12012 July 1999 Ack Receipt of Encl FEMA Correspondence ,which Transmitted FEMA Evaluation Rept for 981118 Biennial EP Exercise at Clinton Power Station.No Deficiencies Were Observed ML20209D5691999-07-0707 July 1999 Forwards Insp Rept 50-461/99-12 on 990607-11.No Violations Noted.Insp Consisted of Selective Exam of Procedures & Representative Records,Observations of Work in Progress & Interviews with Personnel U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events ML20196J9651999-07-0202 July 1999 Confirms Discussion Between Members of Staffs to Conduct Meeting on 990714 at Clinton Power Station to Discuss Results of Restart Insp & Licensee Progress in Addressing Remaining Long Term C/A Actions to Sustain Improvements ML20196J7131999-06-30030 June 1999 Informs of Closure of Response to Requests for Addl Info to GL 92-01,Rev 1,Supplement 1, Reactor Vessel Structural Integrity, for Clinton Power Station Unit 1 U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology ML20196A3471999-06-16016 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-461/99-11 Issued on 990430.Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARU-603280, Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p)1999-10-12012 October 1999 Forwards Rev 27 to Clinton Power Station Physical Security Plan,Iaw 10CFR50.54(p).Encl Withheld from Public Disclosure, Per 10CFR50.54(p) ML20217C0871999-10-11011 October 1999 Forwards Proprietary Attachment Inadvertently Omitted from Encl 2 to Submitting Responses to NRC RAI Re License Transfer Application for Plant.Proprietary Encl Withheld U-603276, Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included1999-10-0808 October 1999 Forwards Rev 8 to CPS USAR, Which Includes Changes from 970701 Through 990630 & Available Changes Approved After 990630 That Reduce Overall Burden of Submittal Changes for Forthcoming Reporting period.10CFR50.59 Rept Included U-603279, Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld1999-10-0707 October 1999 Forwards non-proprietary & Proprietary Responses to NRC RAI Re License Transfer Application for Plant.Attached Responses Also Respond to Comments of Environ Law & Policy Center Dtd 990920.Proprietary Encl Withheld U-603275, Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station1999-10-0707 October 1999 Provides Updated Illinois Power Rept on Status of Decommissioning Funding for Clinton Power Station U-603272, Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl1999-09-22022 September 1999 Provides Update to Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. 3-D Monicore & Station Security Sys remediated.Y2K Readiness Disclosure for Cps,Encl U-603225, Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl1999-09-20020 September 1999 Provides Closure of Util Commitments Re Ci Cv Noted in Previous Ltr to Nrc.Basis for Expecting Valves to Remain in leak-tight Condition Throughout Operating Cycle & Basis That Justifies Not Performing mid-cycle Leak Testing,Encl ML20212G6981999-09-20020 September 1999 Requests That NRC Reject Proposed License Transfer for Clinton Power Station & That NRC State That Public Interest in Safe Nuclear Power Industry Will Not Be Subordinated to Interest in Maximizing Profit by Limiting Liability 05000461/LER-1996-010, Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events1999-09-13013 September 1999 Forwards LER 96-010-01, Plant Shutdown Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit. Revised Rept Includes Cause of Event,Corrective Actions & Discussion of Similar Events U-603269, Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed1999-09-10010 September 1999 Certifies That DB Livingston,License OP-31136,successfully Completed Facility Licensees Requirements to Be Licensed as Ro,Per 10CFR55 & Has Need for RO License to Perform Assigned Duties.Five Significant Control Manipulations,Listed 05000461/LER-1999-011, Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments1999-09-10010 September 1999 Forwards LER 99-011-00 Re Improper Restoration of a APRM Which Caused Monitor to Not Meet Seismic Qualification Requirements.Rept Contains Listed Commitments U-603229, Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl1999-08-25025 August 1999 Provides Response to NRC RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Dtd 990528.Rev 0 to Calculation IP-M-0556 & Rev 0 to Calculation IP-M-0570,encl U-603243, Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.71999-08-23023 August 1999 Forwards Response to NRC GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Util Performing Testing of ESF Ventilation Sys Charcoal Samples Using ASTM D3803- 1989 Methodology as Required by TS 5.5.7 U-603258, Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage1999-08-23023 August 1999 Forwards ISI Summary Rept, IAW ASME Section Xi,Article IWA-6000.Summary Rept Addresses ISI Activities Performed at Plant from 950429-990527,including Extended Sixth Refueling Outage ML20211B0871999-08-20020 August 1999 Responds to J Hopkins Inquiry Re Application for Order Consenting to License Transfer & Approving Conforming Administrative License Amend Filed by Ilpr & Amergen Energy Co on 990723 U-603259, Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired1999-08-19019 August 1999 Provides Notification That Cl Kreidler Has Resigned Position with Util,Effective 990818.License Status Should Be Changed to Expired U-603253, Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 9908131999-08-16016 August 1999 Notifies NRC That Je Smith,License SOP-30819-1,has Resigned from Position with Ilpr Effective 990813.Status of License Should Be Changed to Expired,Effective 990813 U-603250, Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 9907291999-08-10010 August 1999 Notifies NRC That Ma Freihofer (License SOP-31296-1) Has Resigned from Position with Illinois Power Effective 990729 & License Status Should Be Changed to Expired Effective 990729 U-603249, Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 9908091999-08-10010 August 1999 Notifies NRC That He Bouska (License SOP-3055-1) Has Resigned from Position with Illnois Power Effective 990809. & License Status Should Be Changed to Expired Effective 990809 ML20210N2961999-08-0909 August 1999 Forwards Form of Nuclear Decommissioning Master Trust Agreement,Per CPS Application for License Transfer & Conforming Administrative License Amend U-603248, Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR551999-08-0606 August 1999 Requests Unrestricted License for Kc Scott,License SOP-31532.Scott Has Successfully Completed Facility Licensee Requirements to Be Licensed as Operator/Senior Operator Per 10CFR55 U-603236, Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS1999-08-0202 August 1999 Forwards Revised Data Point Ref File Sheets for Clinton Power Station Computer Points That Input to ERDS ML20210J0541999-07-30030 July 1999 Forwards Three Original Signature Pages of Gr Rainey for Application for License Transfer & Conforming Administrative License Amend, for NRC Files U-603178, Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS1999-07-29029 July 1999 Forwards Four ASME Section XI Relief Requests Re Performance of non-destructive Exams for First 120-month Inservice Insp for CPS U-603237, Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 0001311999-07-28028 July 1999 Informs That Util Will Provide Response to fire-related Questions One & Two of NRC RAI Re CPS Ipeee,By 000131 U-603240, Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.711999-07-27027 July 1999 Forwards Clinton Power Station semi-annual Fitness for Duty Rept for Period Ending 990630,IAW 10CFR26.71 U-603235, Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.7901999-07-23023 July 1999 Forwards Application for License Transfer & Conforming Administrative License Amend for OL NPF-62.Proprietary & Nonproprietary Asset Purchase Agreement Encl.Proprietary Info Withheld,Per 10CFR2.790 U-603231, Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date1999-07-0707 July 1999 Forwards Summary of Status of Plan for Excellence (Pee) Initiatives & Clinton Power Station (CPS) 1999 Business Plan.Encl Documents Provide Status & Disposition for Actions Not Completed to Date U-603214, Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events1999-07-0606 July 1999 Forwards Results of Analysis Performed on Recently Completed Vendor Contracts,Per GL 83-28, Required Actions Based on Generic Implications of Salem ATWS Events U-603218, Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant1999-06-28028 June 1999 Provides Final Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Attachment Provides Y2K Readiness Disclosure for Plant U-603212, Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys1999-06-24024 June 1999 Forwards Response to NRC 990315 Telcon Re Proposed Amend of License NPF-62,implementing Feedwater Leakage Control Sys Mode of RHR Sys U-603227, Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology1999-06-24024 June 1999 Provides Updated Rept on Status of Decommissioning Funding for Plant.Updated Rept Provides Min Decommissioning Fund Estimate,Per 10CFR50.75(b) & (C) Utilizing NUREG-1307,Rev 8 Methodology 05000461/LER-1999-007, Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed1999-06-12012 June 1999 Forwards LER 99-007-00,re Design Error Causing Main Steam Isolation Valve Leakage Control Sys to Be Outside Design Basis.Commitment Made by Util,Listed 05000461/LER-1999-008, Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed1999-06-12012 June 1999 Forwards LER 99-008-00,re Failure of Motor Driven Reactor FW Pump Regulating Valve.Commitment Made by Util,Listed U-603213, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/99-01.Corrective Actions:Calculation 19-AK-05, Calculation for DG Load Monitoring, Was Revised Using Correct Horsepower for Hydrogen Mixing Compressors1999-05-28028 May 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-461/99-01.Corrective Actions:Calculation 19-AK-05, Calculation for DG Load Monitoring, Was Revised Using Correct Horsepower for Hydrogen Mixing Compressors ML20209G7731999-05-27027 May 1999 Forwards Copy of Final Rept for 981118,Biennial Radiological Emergency Preparedness Exercise for Clinton Nuclear Power Station.No Deficiencies Were Noted U-603207, Provides Util Rept Confirming Completion of Actions Required by NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs1999-05-13013 May 1999 Provides Util Rept Confirming Completion of Actions Required by NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs U-603201, Forwards 4-yr Updated Certification Rept for Plant Training Simulator.Nrc Form 474, Simulation Facility Certification Also Encl Which Was Developed in Accordance with Reg Guide 1.149 & Ansi/Ans Std Ansi/Ans 3.51999-05-0505 May 1999 Forwards 4-yr Updated Certification Rept for Plant Training Simulator.Nrc Form 474, Simulation Facility Certification Also Encl Which Was Developed in Accordance with Reg Guide 1.149 & Ansi/Ans Std Ansi/Ans 3.5 U-603196, Provides Notification That Util Has Completed Thermo-Lag 330-1 Fire Barrier Corrective Actions as Described in 970619 & s in Addition to Repair of Butt Joint Described in1999-04-27027 April 1999 Provides Notification That Util Has Completed Thermo-Lag 330-1 Fire Barrier Corrective Actions as Described in 970619 & s in Addition to Repair of Butt Joint Described in U-603205, Forwards Annual Radioactive Effluent Release Rept for Clinton Power Station for Period Jan-Dec 1998. Rev 17 to ODCM for Clinton Power Station, Also Encl1999-04-27027 April 1999 Forwards Annual Radioactive Effluent Release Rept for Clinton Power Station for Period Jan-Dec 1998. Rev 17 to ODCM for Clinton Power Station, Also Encl U-603197, Provides Details of Other Activities Being Taken as Part of CPS Plan for Excellence Re Ensureing That CPS Physical Plant & Functional Characteristics Are Consistent with & Are Being Maintained IAW CPS Design Bases1999-04-24024 April 1999 Provides Details of Other Activities Being Taken as Part of CPS Plan for Excellence Re Ensureing That CPS Physical Plant & Functional Characteristics Are Consistent with & Are Being Maintained IAW CPS Design Bases U-603194, Provides Notification That Ta Staber,License SOP-31298,has Resigned Position,Effective 990401.License Status Should Be Changed to Expired1999-04-15015 April 1999 Provides Notification That Ta Staber,License SOP-31298,has Resigned Position,Effective 990401.License Status Should Be Changed to Expired U-603189, Requests That Status of License SOP-31187-1,for Le Anderson, Be Changed to Expired,Per 10CFR50.74.Util Determined That Individual No Longer Has Need for SRO License1999-04-0505 April 1999 Requests That Status of License SOP-31187-1,for Le Anderson, Be Changed to Expired,Per 10CFR50.74.Util Determined That Individual No Longer Has Need for SRO License U-603190, Provides Update for Certain 10CFR50.74(f) Info Addressed in Licensee 980619 Submittal,But Not Included in Final Response1999-04-0202 April 1999 Provides Update for Certain 10CFR50.74(f) Info Addressed in Licensee 980619 Submittal,But Not Included in Final Response U-603185, Forwards Response to NRC RAI Re CPS GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs, Program1999-03-30030 March 1999 Forwards Response to NRC RAI Re CPS GL 96-05, Periodic Verification of Design-Basis Capability of SR Movs, Program U-603186, Forwards Rept on Status of Clinton Power Station Decommissioning Funding,Iaw 10CFR50.75(f)1999-03-29029 March 1999 Forwards Rept on Status of Clinton Power Station Decommissioning Funding,Iaw 10CFR50.75(f) U-603184, Submits Info Re Current Levels of Property Insurance & Sources of Insurance for CPS as Listed,Per 10CFR50.54(w)(3)1999-03-26026 March 1999 Submits Info Re Current Levels of Property Insurance & Sources of Insurance for CPS as Listed,Per 10CFR50.54(w)(3) 05000461/LER-1999-005, Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed1999-03-15015 March 1999 Forwards LER 99-005-00,re Inoperability of Standby Gas Treatment Sys Train a Caused by Inadequate Design of Control Circuit.Commitments Listed U-603165, Forwards Revised Data Point Ref File Sheet for Clinton Power Station Computer Point That Inputs to Erds.Change Necessary to Support Plant Mods to Drywell Floor Drain Instrumentation1999-03-12012 March 1999 Forwards Revised Data Point Ref File Sheet for Clinton Power Station Computer Point That Inputs to Erds.Change Necessary to Support Plant Mods to Drywell Floor Drain Instrumentation U-603179, Provides Notification That RG Giuliani & R Zacholski,No Longer Have Need for Operating License.License Status Is Therefore Requested to Be Changed to Expired1999-03-10010 March 1999 Provides Notification That RG Giuliani & R Zacholski,No Longer Have Need for Operating License.License Status Is Therefore Requested to Be Changed to Expired 1999-09-22
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L6571990-09-19019 September 1990 Advises That Dp Hall No Longer Associated W/Facility Since Dec 1989.Mail Should Be Addressed to Js Perry JSP-739-90, Requests Expedited Review & Approval of Proposed Change to Emergency Tech Specs Re Div III Nuclear Sys Protection Sys Inverter Concerning Inoperability of Emergency Shutdown Svc Water Sys Pump1990-09-12012 September 1990 Requests Expedited Review & Approval of Proposed Change to Emergency Tech Specs Re Div III Nuclear Sys Protection Sys Inverter Concerning Inoperability of Emergency Shutdown Svc Water Sys Pump U-601729, Notifies That Bn Chambers Permanently Reassigned to Position Not Requiring Operator License.Certification of Chambers Need to Hold License Previously Provided by Dp Hall Withdrawn1990-08-27027 August 1990 Notifies That Bn Chambers Permanently Reassigned to Position Not Requiring Operator License.Certification of Chambers Need to Hold License Previously Provided by Dp Hall Withdrawn JSP-676-90, Responds to 900725 Notice of Violation & Proposed Imposition of Civil Penalty Documented in Insp Rept 50-461/90-09. Corrective Action:Critique Initiated to Identify Precise Causes & Contributing Factors Leading to Event1990-08-23023 August 1990 Responds to 900725 Notice of Violation & Proposed Imposition of Civil Penalty Documented in Insp Rept 50-461/90-09. Corrective Action:Critique Initiated to Identify Precise Causes & Contributing Factors Leading to Event U-601723, Forwards Results of fitness-for-duty Program for 900103-0630,per 10CFR26.711990-08-16016 August 1990 Forwards Results of fitness-for-duty Program for 900103-0630,per 10CFR26.71 U-601722, Forwards Reissued NPDES Permit IL00369191990-08-10010 August 1990 Forwards Reissued NPDES Permit IL0036919 U-601721, Provides Response to Re Process for Requalification Exam Security Agreements.Security Agreement Forms Revised to Direct Individuals Not to Participate in Any Instruction Involving Operators or Senior Operators1990-08-0808 August 1990 Provides Response to Re Process for Requalification Exam Security Agreements.Security Agreement Forms Revised to Direct Individuals Not to Participate in Any Instruction Involving Operators or Senior Operators U-601716, Forwards Response to Violations Noted in Insp Rept 50-461/90-10.Response Withheld (Ref 10CFR73.21(c)(2))1990-08-0303 August 1990 Forwards Response to Violations Noted in Insp Rept 50-461/90-10.Response Withheld (Ref 10CFR73.21(c)(2)) U-601715, Provides Addl Info Re Proposed Amend to Plant Tech Spec 3/4.8.1.1, AC Sources - Operating, Per .Amend Will Allow Testing Frequency of Diesel Generator to Be Returned to Monthly1990-08-0202 August 1990 Provides Addl Info Re Proposed Amend to Plant Tech Spec 3/4.8.1.1, AC Sources - Operating, Per .Amend Will Allow Testing Frequency of Diesel Generator to Be Returned to Monthly U-601708, Forwards Revised Pages to Semiannual Radioactive Effluent Release Repts for Jul-Dec 1988,Jan-June 1989 & Jul-Dec 19891990-07-19019 July 1990 Forwards Revised Pages to Semiannual Radioactive Effluent Release Repts for Jul-Dec 1988,Jan-June 1989 & Jul-Dec 1989 U-601702, Forwards Rev 9D to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 9D to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) ML20044A3001990-06-22022 June 1990 Forwards Update to 890817 Response to Bulletin 88-008,Suppl 3, Thermal Stresses in Piping Connected to Rcs. Unisolable Piping Connected to RCS Identified & Evaluated to Determine Which Piping Could Be Subj to Stratified Flow Phenomena ML20044A4601990-06-22022 June 1990 Provides Followup to 900622 Request for Waiver of Compliance Re Tech Spec Limiting Condition for Operation Concerning Standby Emergency Diesel Generator 1B.Rev to Attachment 1 of Original Request for Waiver Encl ML20043H5021990-06-19019 June 1990 Requests Changes to License NPF-62,correcting Typos, Refs to Fsar,Testing to Be Done During Initial Plant Startup & Incorporating Revised Operating Power/Flow Map for Two Reactor Recirculation Loop Operation ML20043G8221990-06-0707 June 1990 Provides Update to Util Response to Item 1 of Generic Ltr 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping. ML20043F0591990-06-0606 June 1990 Forwards Endorsements 44-50 to Nelia Policy NF-261 & 25-31 to Maelu Policy MF-121 & 10 & 11 to Maelu Policy N-85 & M-85,respectively ML20043D0531990-05-31031 May 1990 Forwards 1989 Annual Rept for Illinois Power Co & Soyland Power Cooperative,Inc ML20043C7501990-05-25025 May 1990 Forwards Rev 20 to Illinois Power Nuclear Program QA Manual. Rev Evaluated by Util as Not Reducing Quality Program Commitments ML20043B4891990-05-21021 May 1990 Informs NRC of Plant Initiatives for 1990 to Improve Corrective Action Program Effectiveness,In Response to SALP Rept & Violations Noted in Insp Rept 50-461/89-32. Centralized Commitment Tracking Sys Upgraded ML20043B1141990-05-17017 May 1990 Suppls 900330 Response to Station Blackout Rule.Calculation of Heatup of Main Control Room Due to Loss of Ventilation Following Station Blackout Revised to Properly Account for Heat Sinks & Credit Existing Masonry Walls ML20043D9901990-05-14014 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Rept 50-461/90-02.Corrective Actions:Safety Evaluation Prepared & Reviewed for Level Instrumentation & Annunciators Identified in Updated SAR ML20043A9811990-05-14014 May 1990 Notifies That Wc Metzner Resigned from Position of Licensed Operator W/Util,Effective 900430 ML20042E6181990-04-13013 April 1990 Updates 890406 Response to Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. Condition Rept Initiated to Address Issue to Drain Instrument Air Filter Regulators ML20012E8991990-03-27027 March 1990 Forwards Rev 9C to Physical Security Plan.Rev Does Not Decrease Effectiveness of Plan.Rev Withheld (Ref 10CFR73.21) ML20012D9451990-03-20020 March 1990 Informs of Current Activities Re Restoration of Shutdown Svc Water (SX) Sys to Operability Following Cleaning of Div I HX Per Generic Ltr 89-13.SX Sys to Be Restored by Returning Sys Flows to Design Values ML20012D9641990-03-19019 March 1990 Lists Present Levels of Property Insurance Coverage & Sources of Insurance,Per 10CFR50.54(w)(2) ML20012D9901990-03-19019 March 1990 Responds to NRC 900216 Ltr Re Violations Noted in Insp Rept 50-461/89-38.Corrective Actions:Maint Supervision Added Critical Points to Existing Maint Work Requests & Preventive Maint Activities & Training Program Updated ML20012D4321990-03-16016 March 1990 Responds to Bulletin 88-008,Suppl 3, Thermal Stresses in Piping Connected to Rcs. Detailed Analytical Review & Proposed Schedule for Implementing Required Actions Scheduled to Be Completed by 900625 ML20012A2771990-02-28028 February 1990 Forwards Final Response to NRC Bulletin 88-010,Suppl 1, Nonconforming Molded Case Circuit Breakers. Actions Taken by Util Have Established That All safety-related Circuits Remaining in Stock Can Be Verifiably Traced to Mfg ML20012C2511990-02-23023 February 1990 Responds to Ninth SALP Rept 50-461/89-01 for Sept 1988 - Oct 1989.Rept Concluded That Overall Performance Satisfactory & Identified Strengths in Areas of Emergency Preparedness U-601611, Notifies That Gd Setser Resigned Position W/Util,Effective 9002131990-02-20020 February 1990 Notifies That Gd Setser Resigned Position W/Util,Effective 900213 ML20011F6501990-02-12012 February 1990 Responds to NRC 900112 Ltr Re Violations Noted in Insp Rept 50-461/89-37.Corrective Actions:Radiation Protection Technicians Provided W/Method for Identifying Radiation Work Permits Which Change Radiological Conditions ML20006C6721990-02-0505 February 1990 Responds to NRC 891207 Ltr Re Violations Noted in Insp Rept 50-461/89-35.Corrective Actions:Emergency Planning Bulletin Issued to All Emergency Response Organization Members Emphasizing Importance of Attending Required Training ML20006D1951990-01-30030 January 1990 Responds to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. Util Intends to Discontinue Sending Ack Upon Receipt of Vendor Manual Matls ML20006A8291990-01-23023 January 1990 Forwards Rev 3 to Inservice Exam Plan. Changes to Text Described.Approval of Changes by 900601 to Allow Time to Plan Refueling Outage Activities Re Inservice Exam Program Requested ML20005H2711990-01-12012 January 1990 Advises That Licensee Will Remove Terminal Blocks for Control Circuits within 100% Relative Humidity Harsh Environ at Plant by End of Second Refueling Outage Currently Scheduled to Begin in Sept 1990 ML20006A7121990-01-10010 January 1990 Forwards Revised Pages to 1987 Radiological Environ Monitoring Rept ML20005F0001990-01-0505 January 1990 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Util Revised Plant Operating Procedures for Hpcs,Lpcs & RHR Pumps & Vibration Monitoring Program Expanded to Include ECCS Pumps at Plant ML20006A7921989-12-29029 December 1989 Responds to 891129 Ltr Which Forwarded Insp Rept 50-461/89-31,requesting Identification of Actions Underway to Ensure That Falsification of Interim Security Screening Records Would Be Detected in Timely Manner in Future U-601573, Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Detailed Procedures Controlling Actuator Adjustments,Repair,Preventive Maint & Other Activities Used & Updated Frequently1989-12-29029 December 1989 Responds to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Detailed Procedures Controlling Actuator Adjustments,Repair,Preventive Maint & Other Activities Used & Updated Frequently ML20005E0891989-12-27027 December 1989 Advises That Revised Fitness for Duty Program Will Meet 10CFR26 Requirements,Effective 900103.Util Intends to Test for Substances Listed at Indicated cut-off Levels ML20006C2961989-12-21021 December 1989 Responds to NRC 891121 Ltr Re Violations Noted in Insp Rept 50-461/89-32.Corrective Actions:Review Performed to Identify Surveillances Which Require Lifting of Leads in Main Control Room ML20005D9521989-12-15015 December 1989 Forwards Monthly Operating Rept for Nov 1989 for Clinton Power Station Unit 1 & Corrections to Oct 1989 Rept ML20005E7781989-12-12012 December 1989 Advises That False Alarm Criteria Will Be Implemented by 900131,per Insp Rept 50-461/89-31.Util Established New Criterion of 100 False Alarms for Security Sys in 24 H Period ML20011D1741989-12-0707 December 1989 Informs of Changes Made to Util Fitness for Duty Program Procedure.Change Specifies That Supervisor - Medical Programs,Assistant Director - Labor Relations or Manager - Nuclear Planning & Support Will Generate Computer List ML19332F0071989-11-30030 November 1989 Responds to Violations Noted in Insp Rept 50-461/89-29. Corrective Actions:Preventive Maint for Ph Monitor & Liquid & Gaseous Gamma Monitors Added to Appropriate Tracking Programs ML19332E9431989-11-29029 November 1989 Forwards Executed Amends 4 & 5 to Indemnity Agreement B-91, Reflecting Change in Ownership of License,Effective 890327 ML19332D5031989-11-27027 November 1989 Responds to Generic Ltr 89-21 Re Status of Implementation of USI Requirements.Results of Util Review & Reporting of Status of Implementation of USIs Encl ML19332D0291989-11-22022 November 1989 Informs That Effective 891201,JS Perry Will Assume Responsibility for Mgt of Nuclear Program at Util ML19332D0431989-11-22022 November 1989 Informs NRC of Change in Schedule for Providing Info Re Environ Qualification Testing of Terminal Blocks for Control Circuits of Conax Electrical Penetrations.Wyle Labs Test Results & Util Review of Results Will Be Sent by 900112 1990-09-19
[Table view] |
Text
_ _ ._. __.
- 7 U-601698 L4 7 -9 0 ( 06-2 2 ) -LP h h 8E.100
' CLINToN ICWEH STATION. I'.o, lloX 678. CLINToN, ILLINOIS 61727M78, TELEI' HONE (217) 935-8881 June 22, 1990 10CFR50.91(a) . (5) 10CFR50.91 PRIORITY ROUTING Docket No. 50-461 I _~5cm1
_ 4 >
{
Mr. A. B. Davis OR14+ l{ <
Du Z Regional Administrator _
Region III U.S. Nuclear Regulatory Commission h k_
rm 799 Roosevelt Road flLLhuh Glen Ellyn, Illinois 60137
SUBJECT:
Followup to Request for Waiver of Compliance '
Regarding Technical Specification Limiting Condition for Operation Related to Standby l Emergency Diesel Generator 1B- ;
Dear Mr. Davis:
1 On June 22, 1990, IP discussed with Messrs. E.- -
Greenman and R. Knopp of your staff the request'for a-waiver' of compliance submitted via IP Letter U-601696 )
dated June 22, 1990. During this conversation and-based I on the information provided in Attachment 1 to.this I letter, Mr. Greenman approved a' waiver of compliance 'l regarding the out-of-service time allowed for diesel generator (DG) 1B under the Technical Specification Limiting Condition for Operation (LCO). Under the s i
l granted waiver, the allowed-cut-of-service time'for DG18.
L must not exceed seven days from the time that DG18 wac' removed from service (entry into-the LCO Action Statement). The waiver of compliance will' therefore j expire on or before 0243 on Friday,_ June-29,t1990, unless l l otherwise approved by the NRC.
It should be noted t bat Attachment 1 to this letter-
~is -a revision to Attachtrent 1.of the original re,questL for 1 waiver dated June 22, l')90 (U-601696). as it contains I l additional information. This letter and its: attachments- l ih
~
L have been reviewed and approved by the CPS Pacility Review Group. /
/ \
- n d 9006290087 900622 JU$ g 0 M .
PDR ADOCK 05000461 P- PDC 'I o
IP appreciated your consideration and prompt response to this request.
Sincerely,
=
g J. S. Perry Vice President TBE/rgw l Attachments cc: HPC Clinton Licensing Project Manager ,
NRC Resident Office Illinois Department of Nuclear Safety l
1
. ~ . - -. -- - - . . - . - - - - . .-. --
[ / Attachmsnt-1 to U-601699 1 Page 1 of 8 l 1 .
Descriotion of Condition / Reason'for Recuest-During normal shift rounds at approximately 0200 on June 22, 1990, an operator discovered (via the site glass) that the water level in the jacket cooling water.
expansion tank on DG1B-was' overflowing. From earlier experience, IP_auspected that this may be caused by service water. leaking through the diesel generator heat '
exchanger tubes and-into the DG' jacket cooling water within the associated heat exchangers. (A heat exchanger is provided for each of the two tandem engines (one 16-cylinder and one 12-cylinder) associated with DG1B.] 4 Although the condition described above would not' prevent the.DG from performing its safety function (since the diesel can function with direct service water flow into the cooling jacket), DG1B was removed from service at 0243 hours0.00281 days <br />0.0675 hours <br />4.017857e-4 weeks <br />9.24615e-5 months <br /> for-investigation'and repair.
Microbiologically induced corrosion (MIC) was first identified in the DG heat exchangers at CPS in 1989 as IP was developing and implementing its. response to Generic Letter 89-13 and the associated supplement.* As an l
immediate corrective action, cleaning and closed loop i chemical treatment of the DG heat exchangers were performed during planned outage:3 (PO-3)L(February, 1990)'
to temporarily arrest the.MIC problem. IP is currently.
working towards a long-term solution to the MIC problem, including obtaining an: Illinois' State discharge permit for chemically treating service water on'an open-loop basis and retubing the IX) heat exchangers. (Retubing-of the heat exchanger for DG1A was completed during PO-3.)
The operability requirements (during operational conditions 1,2, and 3) for the emergency standby diesel I generators, including.the actions to be.taken if one (or more) is inoperable, are specified in CPS Technical Specification 3.8.1.1. (See' Attachment'2 of this submittal.) Action "b" requires that with1either diesel generator 1A or 1B inoperable, operability of the required AC offsite sources must be demonstrated, operability of the remaining operable _ diesel generators must be demonstrated (unless_the DG became inoperable solely due to preplanned preventive maintenance or l testing), and the inoperable DG must-be restored;to l operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.. If the inoperable DG l cannot be restored within 72-hours, the plant must be l
brought to a hot shutdown condition within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and to a cold shutdown condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
Reference:
IP Letter U-601574; dated January 29, 1990
' .'- Attachmont 1
.' to U-601698 Page 2 of 8 .
By-1300 (on June 22, 1990), IP completed.a visual j inspection of the tubes within the heat exchanger
- associated with the 12-cylinder engine. Based on the <
visual inspection performed and previous experience with . 1 MIC in the Division I diesel generator heat exchanger, i tube replacement is required for both heat exchangers ,
l (i.e., the heat exchanger associated with the 12-cylinder '
l engine and the heat exchanger associated with the 16-cylinder engine). This work will not be able to be i completed before the 72-hour time limit expires at 0243 ,
on Monday, June 24, 1990. It is currently estimated that
- an additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> will be needed to complete the retubing and to complete the testing required to reverify ,
operability of DG1B. Regardless, IP does not expect and !
will not permit the time required for retubing and testing to exceed a total of seven days _from the time DG1B was removed from service.
Descriotion/Secuence of Work to be Performed l The work plan for retubing-both heat exchangers is such ,
that both heat exchangers for DG1B will be repaired in parallel. Because of the size limitation of the DG1B room, the 16-cylinder engine. heat exchanger must be ;
removed from the skid for retubing. (The 12-cylinder:
engine heat exchanger will be retubed in place.) The 16- ,
cylinder engine heat exchanger work will thus take almost !
another day more than the repair work for the 12-cylinder- .
engine heat exchanger.. After retubing and rcinstallation of the 16-cylinder engine heat exchanger, pressure -
testing and service water flow balancing will be-l required, followed by performance of a post-maintenance '
surveillance test. IP currently estimates that all of the above will take, approximately, an' additional 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> beyond the allowed out-of-servico'normally required .-
I by the plant Technical Specifications.
Justification for ProDosed Recuest i The Illinois Power electrical system design provides a diversity of power supplies. The waiver of compliance i for the Clinton Power Station Technical Specification. i (CPS-TS) Limiting Condition for Operation (LCO)-to extend the 72-hour allowed out-of-service time approximately 72 l additional hours is justified partially on this diversity. The 138-kV offsite power system provides ,
power to the station by one three-terminal transmission l
line. This.line connects the station to.the Illinois i Power Company grid at the south Bloomington and Clinton.
Route 54 Substations. Electrical power can be fed to'the-station through the line from south Bloomington or north' Decatur (via Clinton Route 54 Substation) or both. The line terminates directly (through a circuit switcher) at the Emergency Reserve Auxiliary Transformer, which .
transforms the electrical power to 4160-volt auxiliary
- r
i e- Attachmsnt 1 to U-601698 Page 3 of 8 power bus voltage. The 345-kV Offsite Power System provides power to the station through three separate transmission lines. These lines connect the station to the Illinois Power _ Company grid at the Brokaw, Rising, i and Latham substations. All three lines. terminate at the station switchyard ring bus which feeds the Reserve Auxiliary Transformer, which in turn transforms the electrical power to the 6900-volt and 4160-volt auxiliary ;
power bus voltage. Only one 138-kV and one 345-kV i feeders are required- by CPS Technical Specifications.
In the unlikely event that the power sources described r above are unavailable, there are two remaining ooerable.
diesel generators on site. Diesel Generator 1A (DG1A) supplies power to Division I electrical equipment and .
DG1C supplies power to Division III electrical equipment.
These operable diesel' generator units are capable of.
+
sequentially starting and supplying the power .
requirements for safe shutdown of the plant.- Because of the diversity of the power supplies described above, the increase in the allowable out of service time for DG1B is justified.
With respect to the current statuslof other systems at CPS important to safety, the following are currently but-temporarily out of service. "LCO"s-were entered for these systems-strictly.due to routine maintenance and not ,
because of any discovered / determined conditionlof inoperability, a System Status */ Comments. [
)
(1) Standby Gas Treatment This LCO is expected to Subsystem B clear during the current _ a ~
swing shift. Standby ~ Gas Treatment Subsystem _A is operable.-
(2) Main Steamline Isolation This LCO is currently being i Valve Leakage Control cleared. MSIV-LCS ..
System-(MSIV-LCS) Subsystem A is operable.-
Subsystem B (3) Reactor Core Isolation This LCO is expected to '
Cooling (RCIC) System clear during the upcoming-midnight shift. The HPCS system is operable.
Imminent restoration of the above systems / subsystems-and ,
the operability of redundant systems'provides added '
assurance that the proposed request is justified.
- As of 1800, June 22, 1990.
l l l ?
l _.
- .- Attachment-1 to.U-601698 Page 4 of 8 There are tes other plant / equipment conditions of concern surrounding this event. IP is currently monitoring the degradation of the inner mechanical seal on reactor recirculation: pump B as pressure across the inner seal has been observed to be increasing. (The outer seal is-in good condition.) This condition is not considered to be a condition that warrants special consideration regarding the capability to shut down the plant and mitigate the consequences of an accident. The most likely' challenge.to the seal would be when shifting the reactor recirculation pump from slow to fast speed during a plant restart.
The second concern-is.the results of oil testing recently performed on the reserve auxiliary transformer (RAT) which provides power-from-the_ CPS switchyard to the Auxiliary Power (AP) System. The1 transformer is currently in service and is one=of-two-sources of power to the safety-related portion of the AP system. The transformer is rated to carry more than four times the total demand of the~ safety-related portion'of-the AP -
system.
Illinois Power monitors the condition of-transformer oil-in the RAT by taking periodic oil samples and sending them to an independent laboratory for analysis. The results of oil samples taken:in mid June of 1990Lare provided below. Two of the parameters were identified as:
being outside-their recommended normal ranges.
Ranae 6/15* 6/21* 6/22**
Water Content 15-34 ppm 31 ppm 66 ppm --
Dielectric Strength 24-31 kV 30 kV 14 kV 45 kV-The samples were taken during extremely wet, humid weather and are so divergent that they are questionable. Alli other parameters are normal and within.their respective limits. In particular,-the combustible gases are within their normal limits. (Combustible gases are indicative of imminent failure and/or catastrophic damage due'to-internal arcing.)
The RAT has experienced no failures since IP received its operating license in September 1986. The only outage of the off site power from the 345 kV switchyard-occurred in late 1988 due to a failure of a 345 kV switch. This outage was of short duration (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).
- 0ffsite laboratory test results
, l
l 1 Attachmant 1: t t
to U-601698 ,
Page 5 of 8 :
i IP believes the test results indicate that the RAT requires closer attention, but it is not inoperable and is still capable of performing its intended function. !
However, IP has sent samples to two different '
laboratories so that the recent test results can be further evaluated. Test results are expected next Monday (June 25, 1990). If the' test results for the RAT oil ,
samples are unsatisfactory,'IP_will take appropriate action to shut down the plant. ;
Regarding the need for maintaining the plant on line, CPS is presently generating approximately 60 percent of the total electrical IP customer load.
The current status of other Illinois Power Generating-Stations islas follows:
Expected ,
Return-to-Service !
Unit Status 'Date l Baldwin 1 (540 MW) off-line 6/25/90 Baldwin 3 (540 MW) off-line 7/23/90 Havana 6 (410 MW) off-line 6/25/90 t It is estimated that if CPS must be shut down, and all;of the available IP units are in operation, IP will=need to'
- purchase at least 500 megawatts of power and must interrupt 1 service to the interruptible' customers ono Monday (June 25). If Baldwin 1.and Havana 6 are not available, then IP'will need to purchase at least 1200 ;
megawatts (and discontinue service to1the-interruptible -
customers). Peaking Units (Gas. Turbines) are not included in this forecast.
Additional *Mitiaatina Conditions IP contacted the National Weather Service ~ (NWS) .in i Springfield, Illinois to consider the current and .i expected weather conditions for the immediate service area. The NWS reported that clear weather is: forecast for the weekend. The NWS indicated that there is only a ,
slight chance of thunderstorms on Monday (June 25) and
, that the next possibility of thunderstorms is on Wednesday or Thursday (June 27 or 28).
Comoensatory Actions The remaining. operable diesel generators are ready to-perform their intended function in the unlikely event :
that they are needed. In addition, no testing will be performed that might create a transient.to normal plant conditions (other than the normal -surveillance testing ;
1 t
Attschmsnt.1 e to U-601698 -1
'Page 6 of 8 required to satisfy Technical Specification requirements) ,
during the extended time interval. Also,.no systems or t equipment important to' safety which are associated with t
the redundant safety-related division (Div. I) will be removed from service for electric _ maintenance during the :
extended time' interval. ]
Safety Sianificance/ Basis for No Sionificant Hazards l Consideration
=f l IP does not consider this request to be safety L significant in view-of the following:
! i As noted previously, only the Division II DG is :
- 1) '
, currently inoperable. .As offsite power is also l available,-sufficient redundancy exists (assuming no l concurrent failures) to provide emergency power to l
systems designed to mitigate the consequences of an 3 accident. ,
- 2) Generally, operation under the provisions of an action statement is permitted for limited periods of '
! time as it is recognized that single-failure criteria may not be-met during such operation. IP believes that operation with only DG1B out of ,
service for a period of time; longer-than normally ;
l- allowed but within the noted limit constitutes no significant increase in risk regarding the-safe, ,
operation of the facility.
- 3) In addition, IP doesonot believe that the.present i situation should require subjecting the plant to an u unnecessary shutdown. Although there is a.certain
- risk associated with the increased allowed out-of- ,
service time, most challenges.to plant systems occur during startup and shutdown events. Eliminating'the ,
risk associated _with these events by preve.. ting an 1 unnecessary-plant shutdown due to the current action time limit is viewed to have a positive'effect on ;
plant safety.
- 4) With respect ~to executing a safe shutdown.of the plant if required, the plant design is such that-safe shutdown to a cold condition can be-achieved with DGlB inoperable, particularly in view of the operability of all redundant power sources and the operable status of systems important to safety.
According to 10CFR50.92, a proposed change to the license-(Technical Specifications) involves'no'significant hazards consideration if operation:of the facility in
- accordance with the proposed change would not: (1) involve a significant increase in the probability or _
consequences of an accident previously evaluated, or (2) -
create the. possibility of a newLor different kind of
_.m .
l i
h .
-Attachm2nt 1-to U-601698 page-7 of 8 l
accident from any accident previously evaluated, or-(3)- l involve a significant reduction in a margin of safety. 1 The proposed changes are evaluated against each of-these ;
criteria below.
- 1) As noted above, the proposed one-time request would permit DG1B (and only DGlB)- to be out-of-service for a longer period of time than normally allowed by the:
Technical Specifications. However,.in view of the operability of all other required on-site sources and all required off-site sources, IP believes that the proposed request does not constitute a sianificant increase in risk with respect.to the .
capability of safety systems to mitigate:the i consequences of an accident.- Additionally, then proposed request would permit a reasonable amount of time to restore'the DG1B heat exchangers to a.like- 3 new condition while avoiding an: unnecessary plant - i shutdown and potential challenges to safety-systems.
)
. Therefore, the proposed request does not-involve a i significant increase in probability or consequences q of any accident previously evaluated.- i
- 2) The proposed raquest does not involve any_ changes to ,
the design or operation of the: plant.- Since no new 1 failure modes are effected by the proposed; request, the proposed request does not create the possibility of a new or different kind of accident from any t
accident previously evaluated.
- 3) Under the proposed request, the allowedLout-of-service time for DG1B (although longer than normally allowed) would still be limited to a reasonable period of-time. With DG1A and DGlc operable, 'the l proposed change does not involve a'significant reduction in the margin of safety normally ensured by the Technical Specifications with-respect to the availability of' emergency onsite AC sources.
Concludina Remarks It should be noted that the current MIC problem could be resolved through a number or options. As noted previously, the diesel generator is not rendered inoperable by the MIC condition since the DG.could :
perform its intended function with flow from the service l water system through the leaks within the heat exchanger. 1 One possible (but unrealistic) option would-be to. simply I continue operation with the heat exchanger "as-is." 1 Another option would be to plug the leaking tubes in lieu of replacing them. Neither of.these options, however, '
would be effective in mitigating the MIC condition or- j preventing a potential near-term future need to again address degradation of the DGlB heat exchanger-tubes due to MIC.
t "
Attachmsnt'l to U-601698- ,
Page 8 of 8
-The third option _is to replace the heat exchanger tubes. '
This.can restore either or both heat-exchangers to a like-new condition as IP pursues its long-term solution ,
to the_MIC problem. Ip feels that this is the appropriate course of action. The proposed request would ,
support complete replacement of-the tubes:in'both-heat ;
exchangersL(for the 12-cylinder and 16-cylinder engines),
thus precluding the possibility of having to again remove. .
.the DG from service in order to plug;more tubes, '
l reassessing the impact of further plugging,'and- _
l potentially readdressing the MIC problem. Plant and grid conditions are:such that now is an appropriate time to [
request a waiver.of compliance in order to implement a i complete and thorough (short-term) fix to the MIC problem for DG1B. ,
i l
{
L :
k i
t 9
.e-, y -,,
3
, A'ttachment 2 3/4.8 ELEC?RICAL POUER SYSTEMS to U-601698 i 3/4.8.1 AC SOURCES AC S2;lRCES - OPERATING ,
LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following AC electrical power sources shall bc l OPERABLE:
- a. Two physically independent circuits between the offsite transmission network and the onsite. Class IE distribution system, and I b. Three separate and independent diesel generators, each with:
- 1. A separate day fuel tank containing a. minimum of 385 gallons of fuel for diesel generators 1A and 18 and 240 gallons of fuel for diesel generator 10.
- 2. A separate fuel storage system containing a minimum of 48,000 gal-lons of fuel for diesel generator 1A and 45 l generator 18 and 29,500 gallons of fuel for,000 gallons for diesel generator IC. diesel
- 3. A separate fuel transfer pump.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
- a. With one offsite circuit of the above required AC electrical power sources inoperable demonstrate the OPERABILITY of the remaining AC sources by performlng Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If either diesel generator-1A or 1B has not been successfull tested within the ast 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> demon-strate its OPERABILITY by perfo n Surveillance Req frements 4.8.,1.1.2.a.4 and 4.8.1.'1.2.a.5 for each such die el generator, separately, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. .
- b. With either diesel generator 1A or 18 inoperable, demonstrate the OPERABIL-ITY of the above required AC offsite sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at' least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remainin OPERABLE diesel generators, separately, by perfonning Surveillance Req f rements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />". Restore the inoperable diesel generator to OPERABLE
- This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABLE status. The provisions of Specification 3.0.2 are not applicable.
CLINTON - UNIT 1 3/4 8-1 Amendment No. 13 )
. i J J .
^
Attachment 2' to U- 601698 Page 2 of 3
'~ ~ l
.~ I w$
.r
~
l
. ELECTRICAL Pok!W SYSTEMS
. .m - * . ;
AC $00RCES - OPERAffR0 .
9 LIMITING . CONDITION FOR OPERATION (Continued) !
t 3.8.L1 ACTION (Continued): .-
y status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in 4t'least HOT SHUT 00WN within theinext 12' tours and in COLD SHUTOOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.' * ,
- c. With one offsite circuit of the above-required' AC sources and diesel i generator 1A or 18 of the above required AC electr.ical power sources inoperable, demonstrate the OPERABILITY of .the resalning AC sources by- }
perfoming Surveillance Requirement 4.8.L1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least !
j
- once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter. If.a diesel generator became inoperable from !
any cause other than preplanned preventive maintenance or testing, deson-i strate the OPERABILITY of the remaining CPERABLE diesel generators, i
separately, by perfoming Surveillance Requirements 4.8.1.L2.a.4 and. *
! Restore at least one of the inoperable AC '
4.8.L L 2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *.
i sourcas to CPERABLE status within 12. hours on be in.at least HOT SHUT 00WN i within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, 6
' Restore at least two offsite circuits and diesel generators IA and 18 to CPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of-initial loss or be in at I 1*att HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within i
the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
3 -l
- d. With diesel generator 1C of the above required AC electrical power sources
[
f feming Surveillance Requirement 4.8.L1.1.4 within 1 hout and at least i once per 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> thereafter. If the diesel generator became incperable as +
a result of any cause other than preplanned preventive saintenance or testing, demonstrate the OPERASILITY of the remaining OPERASLE diesel gener-ators, separately, by.perfort:ing Surveillance Requirements 4.8.1.L2.a.4 !
- and 4.8.1.1.2.4.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />". Restore diesel generator 1C to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare t!)e HPCS systen it.y.;cle and -
j take the ACTION required by Specifications 3.5.1 and 3.7.1.1. i o
- e. With diesel generitor 1A or 1B of the above required AC electrical power
- sources, inoperable, in addition to taking ACTION b or c, as applicable.
verify within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> that all required systems, subsystems, trains, c:=ponents and devices that de:end on the remaining OPERASLE diesel ;
generator as a sour:e of emergency power are also CPERA8LE: .otherwise, be in at least HOT SHUT 00WN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00VH within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ,
f.
= teth cf' tha at:va required of fsite circuits inoperab1'e. , demonstrate the OPERABILITY cf three diesel generators, separately, by performing Surveillance Requirements 4.8.1.1.2.a,4 and 4.8.1.L2.a.5 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> i unless the diesel generators are alreacy operating. Restare at least one is test is recukrte to be c:=pleted re;srdless of when the incperable closel ;
generator is r:st: red to CPERASILITY. The provisions of Spectf.ication 3.0.2 3 are not appit:1:le.
CLIh'iOH - UNIT 1 3/4 6 2 3 e
i i
6 Attachmept,f to U-60169P .
Page 3 of I l
ELECTRICAL POWER SYSTEMS .
AC SOURCES - OPERATING ,
t LIMITING CONDITION FOR OPERATION (Continued) !
3.8.1.'1' ACTION (Continued): -
r E of the above-required offsite circuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> i
.or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. With only one ;
offsite circuit restored to OPERABLE status, restore at least +.wo offsite i
circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.. A successful test (s) of diesel generator .
. 0PERABILITY per Surveillance Requirements 4.8.1.1.2.a.4 and 4.8.1.1.2.a.5, .
performed under this ACTION statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement,a. ,
- g. With diesel generators 1A and'1B of the above-required AC electrical power
')
sources inoperable, demonstrate the OPERA 8ILITY of the remaining AC -
sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> -!
) and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and Surveillance Require- i*
ments 4.8.1.1.2.a.4 and 4.8.1.1.2.a.S for diesel generator 10 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.* Restore at least one of the inoperablo diesel generators 1A and IB to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the 'following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. - l Restor'e both diesel generators 1A and 18 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> i j from time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
- h. With one offsite circuit of the above-required AC electrical power sources _
inoperable and diesel generator 1C inoperable, apply the requirements of .
. ACTION statements a and d specified above. -. .-.
- i. With either diesel generator 1A or 1B inoperable and diesel generator.
1C inoperable, apply the requirements cf ACTION statements b, d and e-specified above. ,
l i
- This test is required to be completed regardless of when the inoperable diesel .
generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable.
CLINTON - UNIT 1 3/4 8-3 e