ML20004C281

From kanterella
Revision as of 18:30, 17 February 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Info in Response to Atty General 731030 Request Re Antitrust Review.Introduction & Responses to Questions 4,5, 6,7,11,14,16,17,18 & 19,dtd 730917,remain Unchanged
ML20004C281
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/09/1974
From: Heidel C
DETROIT EDISON CO.
To: Braitman A
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20004C270 List:
References
NUDOCS 8106020485
Download: ML20004C281 (3)


Text

. . . _ _ _ - - .

l 6 Chorus M. H oxe

' e st v4e Ns etet E.4rce .r; cno Osrs:r.cr.cn  :

Attachm:nt 3 Cil . ,

  • w.wv4 e

r rw W:Wanns I v ,me:s January 9, 1974 Mr. A. Braitman, Chief Office of Anti-Trust and Indemnity Directorate of Licensing i U. S. Atomic Energy Commission Washington, D.C. 20545 i Re: Anti-Trust Filina for Enrico Fermi Unit No. 3 i

Dear Mr. Braitman:

o l

Enclosed are five copies of Information Request'eu by l

l the Attorney General for Anti-Trust Review of Facility License Applications as prepared for the Enrico' Fermi Unit No. 3. Preparation of this Anti-Trust Filing was initiated in response to a telephone call from your office to W. J. McCarthy, Jr. on October 30, 1973 requesting an early, informal, five-copy filing to assist in reducing the anticipated spring peak in the Department of Justice review process. During prepara-tion of this filing, on December lo, 1973, a letter was sent from J. F. O' Leary, Director of Licensing, to W.

l

)

G. Meese, President, The Detroit Edison Company, requesting that Anti-Trust Filings be made nine menths prior to Obviously, since application for the Construction Permit.

we intend to submit application for the. Unit 3 Construction Permit during April, 1974, it will not be possible to ful-fill that request for this particular filing. However, we will comply with this request on any future nuclear units.

The last submittal of this Anti-Trust Information by The Detroit Edison Ccmpany was for the Greenwood Energy Center, Units 2 and 3 (Construction Permit Application submitted June 4, 1973, and docketed September 17, 1973, under Docket Nus. 50-452 and 50-453). There A have been few summary of changes changes since the Greenwood filing. filing.

appears below to facilitate review of the current The introduction and responses to Questions 4, 5, 6, 7, 11, 14, 16, 17, 18 and 19 remain unchanged.

l l ,

l 8106020 %

e- -

. a.' .

Attactinent 3 d

e I

4 Mr. A. Braitman

  • January 9, .1974 Page Two An actual peak load replaces the forecasted peak load for the summer of 1973. Although the forecasted peak loads for Detroit Edison for the period 1974 through 1983 are still the same, the effect of the higher than anticipated 1973 peak load was to drop the average annual projected growth rate from 7.2% to 6.4% (Table 2). A similar effect shows up in Table 3 which is a projecticn for the combined Detroit Edison and Consumers Power systems.

Table 1-2 shows a reduction in " Total owned Capability" of apprcximately 250 MW and a reduction in accredited rating of existing units of an additional 250 MW. Also the addition of Belle River Units 1 and 2 in 1979 and 1980, respectively, allowed for* the slippage of Greenwood 2, Fermi 3, and Greenwood 3, as shown in Tables 1-2 and 1-3.

The answer to question 8 contains three changes. The Consumers Power - Detroit Edison - Indiana and Michigan Electric Company agreement now incorporates Amendment No. 1973, 5, filed with the Federal Power Commission on December 4, Docket E8538, Notice of Amendment to Agreement dated December 13, 1973. The Consumers Power - Detroit Edison -

Hydro-Electric Power of Ontario Agreement was amended with an August 13, 1973 filing date and was accepted for filing 16, 1973. The third change under Docket E8364 on November is the mention of a letter of termination to the 1973 Fordwhereby Motor Company from Detroit Edison dated December December 19, Detroit 31, agreement with Ford will terminate on midnight, 1974.

l Answers to questions 9, 10 and 13 were changed to reflect l

the new interconnection with the Village ofThe Sebewaing answer to which went into service on November 15, 1973.

question 13 was also expanded to include the new inter-connection with Thumb Electric at their Urban Station.

Answers to questions 15 and 20 were changed to reflect the latest Detroit Edison rates.

Attachment II, 1982 transmission map was changed to reflect the addition of Belle River Units 1 and 2.

l I

u

' Attachment 3 L .

Mr. A. Braitman .

January 9, 1974 Page Three The capacity changes described in Tables 1-2 and 1-3 reflect a change in the scheduled initial operation of Greenwood Unit 3 frem sum.mer 1981 to summer 1962.

Very truly yours, C. M. Heidel

mmt Enclosures cc: G. L. Ball E. M. Bensen R. L. DeMumbrum A. K. Falk P. A. Marquardt J. B. Nims l

{

l

, , _