Documents Transmittal of Ref Matl in Support of Planned Insp of Unit 2 Emergency Operating Procedures.List of Ref Matls Sent to Region I Encl
ML20011E878
Person / Time
Site: Beaver Valley
Issue date: 02/06/1990
From: Grada K
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-62934, NUDOCS 9002220655
Download: ML20011E878 (2)


Text

F. - ,

9 [p , ,

)' .

h( .

Teleph it) 393-6330 '

O kt a 4

$Nppmpport PA 16077-0304 h February 6, 1990 f.

L U. S. Nuclear Regulatory Commission l Attn Document Control Desk Washington, DC 20555

Reference:

' Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Inspection of the Emergency Operating Procedures Gentlemen:

The purpose of this letter is to document. transmittal of reference material in support of a planned inspection of the.

Beaver Valley Unit 2 Emergency Operating Procedures (EOPs) as requested- by the 'R. M. Gallo to J. D. Sieber letter dated

~ January 11, 1990. Attachment 1 provides a list of reference material which is being sent directly to Mr. Larry Briggs at Region 1. .

If you .have any questions concerning this natter, please contact my office.

Very truly yours, WO= WAF4 K. D. Grada Manager, Nuclear Safety cc:

~

h .Mr. J. Beall, Sr. Resident inspector Mr. R. M. Gallo, Chief, Operations Branch Mr. .

P. Tam, Sr. Project Manager Mr. L. Briggs, EOP Inspection Team Leader 9002220655 900206 *'

PDR ADOCK 05000412 '

O PNV y

/// j

    • *~

ATTACHMENT 1 Reference Material for EOP Insoection i

1. BV-2 Operations Procedure Index  ;
2. BV-2 Abnormal Operating Procedures l
3. Westinghouse Owners Group Emergency Response Guidelines
4. Procedure Generation Package
5. BV-2 EOP Issue 1A Rev. O Deviation Sheets  :
6. BV-1 Simulator Malfunction Book (only some et these malfunctions are used in BV-2 operator tra:ining due to .

f plant equipment differences) I

7. EOP Lesson Plans (3 Books) l
8. BV-2 EOP Users Guide e

'l t