February 6, 1990 f.
L U. S. Nuclear Regulatory Commission l
Attn Document Control Desk Washington, DC 20555
Reference:
' Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Inspection of the Emergency Operating Procedures Gentlemen:
The purpose of this letter is to document. transmittal of reference material in support of a
planned inspection of the.
Beaver Valley Unit 2
Emergency Operating Procedures (EOPs) as requested-by the
'R.
M.
Gallo to J.
D.
Sieber letter dated
~ January 11, 1990.
Attachment 1
provides a list of reference material which is being sent directly to Mr. Larry Briggs at Region 1.
If you.have any questions concerning this natter, please contact my office.
Very truly yours, WO= WAF4 K.
D. Grada Manager, Nuclear Safety
~
h cc:
.Mr. J. Beall, Sr. Resident inspector Mr. R. M. Gallo, Chief, Operations Branch Mr. P. Tam, Sr. Project Manager Mr. L. Briggs, EOP Inspection Team Leader 9002220655 900206 PDR ADOCK 05000412 O
PNV y
///
j
- ~
ATTACHMENT 1 Reference Material for EOP Insoection i
1.
BV-2 Operations Procedure Index 2.
BV-2 Abnormal Operating Procedures 3.
Westinghouse Owners Group Emergency Response Guidelines 4.
Procedure Generation Package 5.
BV-2 EOP Issue 1A Rev. O Deviation Sheets 6.
BV-1 Simulator Malfunction Book (only some et these malfunctions are used in BV-2 operator tra:ining due to f
plant equipment differences)
I 7.
EOP Lesson Plans (3 Books) l 8.
BV-2 EOP Users Guide e
'l t
1 I
l
?
l l
>