(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20151R5611986-01-30030 January 1986 Summarizes 851216 Mgt Meeting at Oak Ridge Operations Ofc to Review & Inspect Redress & Reclamation of Crbr Site.Drawings Reviewed,Discussions Held & Tour of Site Performed.Site Restoration Concluded to Be as Described in Plans & Specs ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C7371985-06-14014 June 1985 Further Response to FOIA Request for Documents Re Site Redress Where Plant Const Begun,Including Clinch River Facility & NRC Legal Analysis Re Redress.Forwards App B Documents.App C Document Withheld (Ref FOIA Exemption 5) ML20128R0001985-06-0606 June 1985 Partial Response to FOIA Request for Records Re Desirability of Voluntary or Required Redress of Nuclear Plant Sites Where Work Undertaken But Const No Longer Contemplated. Forwards Documents Listed in App a ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20140C6121984-06-18018 June 1984 Advises That Time for Commission to Review ALAB-761 Expired. Commission Declined Review.Decision Became Final Agency Action on 840611.Served on 840618 ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20128R0161984-02-29029 February 1984 Expresses Thanks for 840222 Review of Site Redress Planning. Concurs W/Conceptual Approach & 1-yr Period for Development of Final Site Redress Plan & Investigation of Potential Use of Site.Ml Lacy Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 1986-03-13
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20128B2801985-06-27027 June 1985 Updates DOE .Bids for Redress of Crbr Site Opened on 850604.Contract Awarded to Beaver Excavating Co,Canton, Oh,On 850613.Contractor Scheduled to Complete Site Redress on or Before 851216 ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20107M8141984-11-0707 November 1984 Clarifies & Reaffirms Util Commitments Re Redress of Site in Accordance W/Util 840305 Final Site Redress Plan & NRC 840606 Approval of Plan ML20107H8031984-11-0606 November 1984 Reaffirms Commitments to Redress Site in Accordance W/ 840305 Final Site Redress Plan & NRC 840606 Approval Ltr. Related Correspondence ML20087B4361984-03-0808 March 1984 Confirms That ASLB Intends to Vacate Notice of 840314 Conference & Reschedule Later Date Due to Delay in Funding for Review of Redress Plan & Possible Lack of Availability of One ASLB Member.Certificate of Svc Encl ML20086T4631984-03-0505 March 1984 Forwards Site Redress Plan. Minor Clarifications & Corrections to Draft Plan Submitted 840227 Made in Response to NRC Comments ML20087A4141984-03-0202 March 1984 Forwards Page 15 Inadvertently Omitted from 840227 Transmittal of Draft Crbr Plant Redress Plan.Related Correspondence ML20080T9331984-03-0101 March 1984 Forwards Page 15 of Crbr Program Redress Plan,Inadvertently Omitted from 840227 Transmittal.Certificate of Svc Encl ML20080S6661984-02-27027 February 1984 Forwards Draft Site Redress Plan,In Response to N Grace 831208 Request.Plan Will Be Finalized for Submission on 840302,following Receipt of Comments ML20079F9411984-01-13013 January 1984 Informs of Receipt & Storage,Through S&W Engineering,Of Spent Fuel Transfer Port Assembly Large Shield Plug.Due to Failure of Congress to Appropriate Addl Funding,Doe No Longer Seeking CP & Is Closing All Licensing Activities ML20083G3551984-01-10010 January 1984 Advises That Svc of DOE & Project Mgt Corp 831227 Notification Re Project Termination Affected Again on All Parties on Attached Svc List ML20083H2331983-11-15015 November 1983 Summarizes Current Status of SER Open Items Re Structural Response During Faulted Conditions & Beyond Dbas.Program Lacks Planned Analytical Support.Models to Support Experimental Efforts Should Be Developed ML20081B9721983-10-24024 October 1983 Summarizes 831004 Meeting W/Nrc,Acrs & Lnr Assoc Re Mgt of Crbr PRA Program.Viewgraphs & List of Meeting Attendees Encl ML20078A7571983-09-0707 September 1983 Forwards Evaluation Repts of Faults 1,2 & 3 Discovered on Site During Foundation Excavation.Faults Not Capable within Meaning of App a to 10CFR100.W/seven Photographs ML20076A8171983-08-17017 August 1983 Confirms Redirection for Shipping Applicant Voluminous Exhibits.Certificate of Svc Encl ML20076A7761983-08-17017 August 1983 Advises That Author Will Present Oral Argument on Behalf of Applicants & Forwards Motion Requesting Argument Be Rescheduled for 830928 ML20081A5601983-08-11011 August 1983 Summarizes 830808 Informal Meeting on Contract Re PRA Review of Crbr (Task 4) & NRC Concerns Associated W/Technology for Energy Corp Deliverables Schedule ML20077J0781983-08-11011 August 1983 Forwards Pages from Transcript of Crbr CP 830810 Hearings Per ASLB Direction.Certificate of Svc Encl ML20076H8811983-08-0909 August 1983 Expresses Appreciation for NRC Presentation on 10CFR21 & 10CFR50.55(e) Requirements.Info Should Be Most Useful to Personnel Involved in Project in Following Requirements ML20024E0391983-08-0505 August 1983 Forwards Errata Sheets for Applicant Prepared Testimony. Certificate of Svc Encl.Related Correspondence ML20077D1321983-07-25025 July 1983 Advises of Omission in Applicant 830722 Response Re CP Evidentiary Hearings.Hearings Did Not Commence on 830718 But Were Postponed Per 830713 Order.Order of 830719 Rescheduled Hearings for 830808-12.Certificate of Svc Encl ML20024D0291983-07-22022 July 1983 Forwards Clinch River Breeder Reactor Plant Sys Design Description - Nuclear Island HVAC Sys, as Example of Procedure Outlines Available for Performance of PRA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20024D5121983-07-19019 July 1983 Requests Specs for Electrical Power Cable Insulation to Be Used at Facility ML20077H1911983-07-19019 July 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-537/83-05.Corrective actions:Westinghouse-Oak Ridge Audit Program Revised to Be Computerized Sys.Implementation Throughout Yr Will Be Measured by Planned Surveillances ML20077A5331983-07-19019 July 1983 Advises of Incorrectly Cited Ref on Page 1 of Attachment B & on Page 2 of Attachment C to .Certificate of Svc Encl ML20072P1101983-07-15015 July 1983 Forwards Applicant Proposed Exhibit List for CP Hearings,For Review.Stipulation as to Authenticity & Admissibility Requested.Certificate of Svc Encl ML20024C1621983-07-0808 July 1983 Informs That Auxiliary Feedwater Sys Evaluation,Per PSAR App C,Section C.6.4 & App H,Section II.E.1.1,scheduled for Completion by mid-1985 ML20085A7291983-07-0606 July 1983 Forwards Rev 6 to Vol 2 to CRBRP-3, Assessment of Thermal Margin Beyond Design Base (Tmbdb) ML20105B9551983-07-0606 July 1983 Forwards Addl Info Per Request at 830610 Meeting on Programmatic Objectives Re Fuel Burnup.Fftf Operates W/Peak Burnup of Over 61,000 Megawatt Day/Mt.Burnup Occurred Under Temp & Power Conditions Similar to Crbr Conditions ML20079R7401983-06-23023 June 1983 Summarizes 830606 Meeting W/Crbr Project Personnel Re Schedule for Resolution of Confirmatory Items.All Identified Items & Preliminary Schedule Info Discussed.List of Attendees Encl ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20024A6781983-06-20020 June 1983 Informs of Planned Optional Use of Mechanical Couplers for Reinforcing Bar Splice Sys in Nuclear Island Mat.Qa Program Will Be Established.Exception to ASME Code,Section III & Reg Guide 1.136 Requirements Encl ML20076J0951983-06-17017 June 1983 Summarizes Programmatic Objectives 830610 Meeting Re Fallbacks Identified in Chapter 4 of SER & Impact on Crbr Project.Viewgraphs & Supporting Documentation Encl ML20076J0511983-06-16016 June 1983 Advises That DOE Addressees Include Tj Garrish,L Silverstrom & Wd Luck.Rt Johnson & WE Bergholz Should Be Deleted from Svc List.Certificate of Svc Encl ML20023D9611983-05-27027 May 1983 Submits Agreements Reached at 830524 Meeting W/Crbr Project Re Pra.Description of Addl Tasks Needed to Integrate Plan I & II Efforts Encl ML20072B3431983-05-27027 May 1983 Forwards Crbr Erosion & Sediment Control Plan Rept, Providing Implementation Status of Control Plan Measures Currently Utilized ML20023D4031983-05-20020 May 1983 Forwards Amend 77 to PSAR ML20076D3151983-05-19019 May 1983 Forwards Rev 1 to Crbr Project Heat Transport Sys In-Containment Piping Reserve Seismic Margins & Rept Re Consequences of Leaks from Small Diameter Primary Heat Transport Sys Piping ML20076D2281983-05-17017 May 1983 Forwards Rev 5 to Vol 2 to Thermal Margin Beyond Design Base. Rev Incorporates Isotopic Inventory for Heterogeneous Core,Current Meteorology,Addl Organ Doses & More Realistic Pu Sparging Calculations ML20023C5821983-05-16016 May 1983 Submits Supplemental Info to 830401 Ltr Re Cable Separation by Confirming That Approx 75 Ft of DHR Svc & Steam Generator Auxiliary Heat Removal Sys Cable Will Be Run in Separate Conduits or Encl Raceways ML20079Q2881983-05-10010 May 1983 Forwards Corrected 830509 Response to NRDC & Sierra Club First Set of Interrogatories & Request to Produce Directed to Applicant.Original Document Not Identified as Response ML20024D9551983-05-0909 May 1983 Submits Estimate of LMFBR Safety & Licensing Review Needs Over Next Several Yrs.Preparation of Portions of FSAR Will Begin in 1984 ML20073S2761983-05-0505 May 1983 Forwards Revised Responses to SER Item 6 Re Qa,Including Info to Complete Identification of safety-related Structures,Sys & Components Controlled by Crbr QA Program for PSAR.Marked-up Tech Specs Encl ML20073Q3491983-04-28028 April 1983 Forwards Revised Response to SER Item 6, Qa. Response Provides Addl Info Re Identification of safety-related Structures,Sys & Components Controlled by QA Program ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069L1801983-04-27027 April 1983 Informs That Evaluation of Seismic Adequacy of Primary Heat Transport Sys Branch Line & Consequences of Line Failure Being Conducted,In Response to ACRS 830419 Request.Results Will Be Forwarded by 830517 ML20073K3441983-04-18018 April 1983 Forwards Static Tests of 1/20-Scale Models of Crbr Head in Support on LMFBR Safety Program ML20071G2761983-04-18018 April 1983 Recommends That Commission Retain Technical Cadre of Experts to Review Crbr & Overall DOE Breeder Program 1986-03-13
[Table view] Category:PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
MONTHYEARML20205L1831986-03-13013 March 1986 Comments on Proposed Rule 10CFR9.Rule Opposed Due to Opinion That Broad New Class of Secret Sessions or Meetings W/O Transcripts Will Be Created ML20133C6881985-05-0808 May 1985 FOIA Request for Documents Re Redress of Sites Where Nuclear Plant Const Begun & NRC Legal Analysis of Need for Site Redress W/ or W/O Current CP & LWA ML20080A8311983-07-20020 July 1983 Opposes Plant Const Since Little Prior Experience Exists W/Breeder Reactor Design ML20079R2661983-06-21021 June 1983 Lists Typographical & Transcription Errors in 830512 Deposition.Certificate of Svc Encl ML20073R2221983-04-27027 April 1983 Requests to Make Limited Appearance Statement at 830718 CP Hearings Re Regional Socioeconomic Impacts ML20069P6131982-11-18018 November 1982 Offers No Comments on Suppl 1 to Fes for Facility ML20065T9791982-11-0101 November 1982 Forwards Author Testimony on Contentions 4 & 6(b)(4) & Cj Johnson Testimony Re NRC Analysis of Environ (Health) Impacts of Plant & Fuel Cycle ML20063P3021982-10-0808 October 1982 Confirms 821007 Discussion,Listing Addl NRC Personnel to Be Available for Deposition Re Contentions 5(a) & 7(b) on 821013 ML20063P0891982-10-0707 October 1982 Confirms 821005-06 Discussions,Listing NRC Personnel to Be Deposed on Various Contentions on 821012-13 ML20023A9971982-09-28028 September 1982 Comments on 1982 Draft Suppl to 1977 Fes for Crbr.Suppl Unacceptable.Fes Suppl Fails to Address Huge Costs of Decommissioning.Use of Alternative Energy Sources & Conservation Advocated ML20065K7201982-09-0808 September 1982 Comments on Draft Suppl to Fes Re Decommissioning of Crbr ML20205L2011982-09-0808 September 1982 Comments on Draft Supplemental Fes on Crbr.Analysis of Impact on Humans,Plants & Animals Made W/O Considering Cumulative Effects of Background Radiation.Addl Documentation Encl ML20063D6911982-09-0101 September 1982 FOIA Request for Rept to EPA, Pu & Human Tissues Re Smoking,Age,Residence Near Rocky Flats & Eastern Co ML20063E4081982-08-17017 August 1982 Comments on Draft Suppl to Fes Re Const & Operation of Facility.Nrc Should Recommend Project Be Canceled Due to Need & Cost Considerations ML20062K5541982-08-11011 August 1982 Requests to Make Limited Appearance Statement at 820823 Meeting in Oak Ridge,Tn ML20062G2501982-08-0909 August 1982 Package of Two Comments Opposing Crbr ML20058J6421982-08-0909 August 1982 Requests to Make Limited Appearance Statement at 820823 Hearing ML20062F8551982-08-0707 August 1982 Supports Completion of Crbr ML20055C0281982-08-0606 August 1982 Advises of Review of Draft Suppl to Fes for Crbr.No Comments Offered at This Time ML20058J6491982-08-0606 August 1982 Requests to Make Limited Appearance Statement at 820823 Hearing ML20062C8471982-08-0404 August 1982 Demands Summary Denial of Applicant Exemption Request or Alternatively,Requests Adjudicatory Hearing Be Ruled Upon Before Decision on Applicant Request Made ML20062C8251982-08-0404 August 1982 Opines That Rationale Expressed in Applicant post-hearing Ltr Unpersuasive to Grant Exemption Request.Applicants Confuse Total Informational Benefits to Ldp W/Marginal Benefits of 6-month Shift in Schedule ML20062C7651982-08-0303 August 1982 Opines That Small Increase in Crbr Efficiency That Might Result from Granting Exemption Request Does Not Justify Extraordinary Relief from NRC Licensing Process ML20058J6401982-08-0303 August 1982 Requests to Make Limited Appearance Statement at 820823 Hearing ML20062G2221982-08-0202 August 1982 Comments on Proposed Accelerated Site Preparation for Crbr. Supports Proposal ML20062C5721982-08-0202 August 1982 Package of 10 Comments Supporting Accelerated Site Preparation for Crbr ML20062G1901982-07-30030 July 1982 Comments on Proposed Accelerated Site Preparation for Crbr. Supports Proposal ML20058G4171982-07-28028 July 1982 Requests to Make Written Limited Appearance Statement on Behalf of Environ Law Project ML20071K8661982-07-28028 July 1982 Advises That Pleading That Was to Be Filed on 820728 Will Be Filed on 820729 ML20062B3791982-07-27027 July 1982 Urges Issuance of Suppl to Fes for Crbr ML20063H6711982-07-26026 July 1982 Package of 34 Ltrs Supporting Acceleration of Site Preparation for Crbr ML20058B9841982-07-22022 July 1982 Urges Denial of Applicant Request for Exemption from 10CFR50.12 to Conduct Site Preparation Activities.Request Should Be Peremptorily Denied Due to Administrative Res Judicata.Certificate of Svc Encl ML20070R4751982-07-20020 July 1982 Urges Approval of DOE Request to Begin Crbr Site Preparation ML20070R4681982-07-20020 July 1982 Urges Approval of DOE Request to Begin Crbr Site Preparation ML20058F0721982-07-19019 July 1982 Supports re-evaluation of Facility Des ML20055B6941982-07-15015 July 1982 Urges Issuance of Draft Suppl to 1977 Crbr Fes ML20054M7591982-07-12012 July 1982 Advises That Reply to Applicant 820701 Response to NRDC & Sierra Club 820611 Petition to Delineate Scope of LWA Proceeding Will Be Filed as Soon as Possible ML20062F0801982-07-0202 July 1982 Criticizes Nuclear Waste,Crbr & Nuclear Weapons.Draft Suppl to Facility Fes Should Be Issued for Comment ML20058F7531982-07-0202 July 1982 Urges NRC Issue Draft Suppl to 1977 Fes ML20054L5131982-07-0101 July 1982 Exhorts NRC to Suppl 1977 Fes.Myriad Changes & New Data Compel Need for Suppl.If Fes Is Not Updated,Nrdc & Sierra Club Will Sue Nrc.Minor Delay Will Obviate time-consuming Litigation ML20062A6941982-07-0101 July 1982 Urges 1977 Fes Be Updated ML20062A7101982-06-24024 June 1982 Opines That 1977 Fes Should Be Updated ML20058F4301982-06-23023 June 1982 Requests NRC Issue Draft Suppl to Fes for Public Comments ML20062A1241982-06-21021 June 1982 Urges Issuance of Suppl to 1977 Fes Incorporating New Info Re Plant Design & Recent Regulations ML20055B7031982-06-18018 June 1982 Insists Upon Issuance of Draft Suppl to 1977 Crbr Fes Due to Changes to Both Reactor Vessel & Fuel Core Design.Licensing Under 1977 Stds Irresponsible & Malicious ML20062B3171982-06-18018 June 1982 Opposes Further Development of Crbr as Needless Extravagance in Face of Declining Demand for Electric Power. Supplemental Fes Should Be Issued for Public Comment ML20058B0991982-06-18018 June 1982 Urges 1977 Fes Be Updated ML20054G0291982-06-17017 June 1982 FOIA Request for Five Categories of Documents Re Design of HX &/Or Steam Generators for Facility ML20058A9111982-06-17017 June 1982 Requests NRC Issue Draft Suppl to Facility Fes Due to Significant New Info & Developments Since 1977 ML20054F3261982-06-14014 June 1982 Expresses Belief That Significant New Info & Circumstances Arisen Since 1977 Require NRC to Suppl Fes.New Developments to Be Considered Listed 1986-03-13
[Table view] |
Text
'
1 o
,, m Nicholas Seay CMAfMAN Peier Anderm COOst(TCH Kemeth Opn sicm1Aav spencer Black, eacucts cowverca Vncent Honness TM Asuun kne t Burts, ea twow cawwvcm
[%% l= Wisconsin's Environmental Decade [Wf,';**'l,"j"M"",,"' ",
Mary deGozzakh Doupas Netwn i14 Ncrth Carrte Street. Sute 208 Ned H % awwa Rchard Lehmann Rchard Presnet Madiscv\ Wrsccosn 53703 Do'c" " ' ' " " " ' " ' "
Juchth Ltday Thomas Van Awa L'*", GRath AM E (RWMrOR Rxtese tene Kurt Luede Dr. Vittona Watson N2 Csol P'cHerkorn, o'tI tw.acJ a Dr. Lnda Mdsaac __. heney Potter, unxA tcw rmt Awxian
'#"' '"^'"
m W ALW CHG " " "
D0 West Wess 5Peet Sute 307
%ueew - u.m (4v4s 224 %
September 28, 1982 U. S. Nuclear Regulatory Commission Attention: Paul H. Leech, Director Clinch River Breeder Reactor Program Washington, D.C. 20555
Dear Mr. Leech:
In regard to the 1982 Draf t Supplement to the 1977 final Environmental Impact Statement f or the Clinch River Project, Wisconsin's Environmental Decade strongly believes it to be unacceptable. The main criticisms stem from the type of nuclear power plant to be used and the huge costs of decommissioning added by the use of this type of plant.
The idea behind the breeder reactor is to make more f uel than is added. We believe that it does not add significantly more fuel in terms of money saved, especially when the associated maintenance costs needed to keep the plant in operation are considered.
Most of the maintenance costs develop f rom the use of liquid sodium as a coolant. The corrosion problems brought on by the se of sodium will prove to be too costly for ratepayers. Also the use of sodium involves an added loop to separate the radioactive sodium which means more initial expense and a greater chance of corrosion (more tubing). The tubing will have to be replaced or sleeved which means temporary but periodical shutdowns. The Decade questions the fairness to the ratepayers by the use of the troublesome breeder reactor.
The second criticism involves the costs of decommissioning of the breeder. The Decade contends that any amount retained for shutdown costs is impossible to do. Any estimate will charge too much or not enough for decommissioning. Again, fairness to the ratepayer is in question.
Also, plants that have been shut down before their expected lifetime have had greater decommissioning costs than the initial costs of the plant. When the arbitrary decommissioning costs are considered, the rate becomes unreasonable.
r211010349 821006 PDR ADOCK 05000537 m. .,ocmm .
D PDR
r 3
s o The Decade recommends that alternatives to the breeder should be.given much greater consideration. Instead of burdening the ratepayer with this project, the TVA should investigate alternative energy sources and conservation measures. Solar power in 'the residential home should be considered. With solar power, the wall of unexpected costs will not come crashing down on the ratepayer.
Conservation will give the time needed until a sound technology can be. implemented. But whatever technology is pulled out of the. bag, a variety of technologies in use will brighten the risk taken.
The Draf t Supplement to the 1977 Environmental Impact Statement has f ailed to emphasize the impact of decommissioning costs in its analysis. The breeder reactor brings risks to investment and unfairness to the ratepayer. The Decade believes that the use of the alternative energy sources--solar power and conservation--will be a much cheaper and easier implemented road to take.
Sincerely, DreeI "
Project Assistant SG:JR J
2