2016 QUAD CITIES NUCLEAR POWER STATION INITIAL LICENSE EXAMINATION MISCELLANEOUS CORRESPONDENCE
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 22, 2015 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION CONFIRMATION OF INITIAL LICENSE EXAMINATION
Dear Mr. Hanson:
In a telephone conversation on December 17, 2015, between Mr. R. Venci, Examination Author, and Mr. B. Palagi, Chief Examiner, arrangements were made for the administration of licensing examinations at the Quad Cities Nuclear Power Station during the week(s) of Apri118, 2016, and April 25, 2016. In addition, the U.S. Nuclear Regulatory Commission (NRC) will make an examination validation visit to your facility the week of March 21, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in Revision 10 of NUREG-1 021, "Operator Licensing Examination Standards for Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by January 19, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by February 16, 2016.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (1 0 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations and tests before they are submitted to the Commission for review and approval.
All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
B. Hanson Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
After you have been notified by the NRC Chief Examiner or Branch Chief that operator licenses have been issued, please direct any inquiries concerning a formal presentation of certificates to this office. Our goal is to have the operator certificates available for your celebration. At least 1 month advance notice of your celebration arrangements would be appreciated to plan our senior manager attendance and process the certificates.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS 1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
B. Hanson Thank you for your cooperation in this matter. Mr. Venci has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi, at 630-829-9611, or me at 630-829-9834.
Sincerely, IRA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via LISTSERy
B. Hanson Thank you for your cooperation in this matter. Mr. Venci has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bruce Palagi, at 630-829-9611, or me at 630-829-9834.
Sincerely, IRA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via LISTS DISTRIBUTION:
Janelle Jessie RidsNrrDorllpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariana Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML15356A754 To receive a copy of this document Indicate In the concurrence box "C =Copy without attach/encl "E" =Copy with attach/encl "N" =No copy OFFICE RIII:DRS I Rill :DRS I I I NAME BPalagi:jw ROrlikowski DATE 12/22/15 12/22/15 OFFICIAL RECORD COPY
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 28, 2015 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
SCHEDULING OF INITIAL OPERATOR LICENSE EXAMINATIONS, QUAD CITIES NUCLEAR POWER STATION,,UNITS 1 AND 2
Dear Mr. Hanson:
We have received your corporate letter RS-14-164, dated May 29, 2014, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations." In the letter, you requested initial operator licensing examinations be scheduled for April2016, and August 2018, at the Quad Cities Nuclear Power Station. These dates have changed from our NRC response letter dated January 27, 2014.
In response, we have scheduled initial operator licensing examinations for the weeks of:
- April 18 and 25, 2016, with an on-site validation date the week of March 21, 2016.
- August 20 and 27, 2018, with an on-site validation date the week of July 23, 2018.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations, unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately.
The examinations have been individually scheduled for two weeks because your letter indicated that there were more than nine applicants being considered for each of these examinations.
Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via LISTSER~
B. Hanson In accordance with Title 10 of the Code of Federal Regulations (1 0 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via LISTSER~
DISTRIBUTION:
Kimyata MorganButler RidsNrrDoriLpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Eric Duncan Allan Barker Carole Ariano Linda Linn DRPIII DRS III Jim Clay Carmen Olteanu Scott Sloan ADAMS Accession Number ML15030A159
~ Publicly Available 0 Non-Publicly Available 0 Sensitive ~ Non-Sensitive To receive a copy of this document, Indicate In the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE Rill I Rill Rill Rill NAME RKWalton:jw HPeterson lrD~A~T~E~--~0~1/=27 3/~17 5~--------r0~1~/2~8~/1=5----------+-------------r-------------~l OFFICIAL RECORD COPY
-13*\)D \NJnf1elc~ Fua\.i Exelon Generation RS-14-164 May 29,2014 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-41 o Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
May 29,2014 U. S. Nuclear Regulatory Commission Page2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
Subject:
Exelon Generation Company, LLC (EGG) Response to NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations," dated April29, 2014 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2016 and 2017. Attachments 1 through 14 provide responses to RIS 2014-05 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
For Limerick Generating Station (LGS) and Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination which involves both stations. In lieu of repeating the same information on LGS and PBAPS attachments, the LSRO examination scheduling information is provided on Attachment 7 for LGS. Attachment 11 for PBAPS references Attachment 7 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2016 through 2019, as indicated on Attachment 7.
May 29,2014 U. S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.
u-r/}0d:J----------
Respectfully, David M. Gullott Manager- Licensing Exelon Generation Company, LLC cc: Regional Administrator- NRC Region I Regional Administrator - NRC Region Ill - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Calvert Cliffs Nuclear Power Station - Completed NRC Form 536 for Clinton Power Station --completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 1 - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 2 0 - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station 1- Completed NRC Form 536 for Peach Bottom Atomic Power Station 2 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 3- Completed NRC Form 536 for R.E. Ginna Nuclear Power Plant 4- Completed NRC Form 536 for Three Mile Island Nuclear Station
Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09*2011)
Estimated burden per response to comply with this voluntary lnfonnation coHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnfonnation collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the lnfonnation Services Branch OPERATOR LICENSING {T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfonnation and EXAMINATION DATA Regulatory Affairs, NEOB-10202, {3150-0131), Office of Management and Budge~ Washington, DC 20503. It a means used to impose an lnfonnation coHection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.
FACILITY NRC REGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018 CY2019 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2016
- CY2017
- CY2018 CY2019 OPERATORS 8 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 8 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 9/5/2016 N/A 5/14/2018 N/A ALTERNATE DATE 9/12/2016 N/A 5/2112018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 20 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGUL.A TORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 09/30/2014 (09*2011)
Esllmaled burden pur response lo comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection Is used lo plan budgels and resources far operalor examinations. Send commenls regarding burden estimate lo the Information Services Branch OPERATOR LICENSING (T*5 F53), U.S. Nuclear Ragulalory Commission, Washlnglon, DC 20555-0001, or by lnlernel e.
mall lo lnfocoHecls.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulalory Affairs, NEQ8.10202, {3150.0131), Office of Management and Budge~ Washington, DC 20503. If a means used to Impose an Information coKection does not display a currendy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond 10, the Information collection.
FACILITY NRC REGION Byron Station, Units 1 and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016
- CY2017
- CY2018 CY2019 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018
- CY2019 NUMBER OF REACTOR OPERATORS 6 8 0 7 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 6 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/14/2016 12/1112017 N/A 10/06/2019 ALTERNATE DATE 03/2112016 12/18/2017 N/A 10/20/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 15 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (OS.2011)
Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014~05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary lnfonnation collectiOn request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This illfonmatlon collection Is used to plan budgels and resources for operator examinations. Send commenls regarding burden estimate to the tnlonnaUon Se!Vices Branch OPERATOR LICENSING (T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by lntemet e-mall to lnfocollecls.Resource@nrc.gov, and to tha Desk Officer, Office of lnfonnation and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an lnfonnation colecUon does not display a currentiy valid OMB control number, the NRC may not condUct or sponsor, and a person Is not required to respond to, the lnfonnation coHection.
FACILITY NRCREGION Calvert Cliffs Nuclear Power Plant, Units I and 2 I Renewed Facility Operating License Nos. DPR~53 and DPR~69 NRC Docket Nos. 50-3 I 7 and 50-318 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY20I8
- CY2019 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 5 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 08/08/2016 N/A 08/06/2018 N/A ALTERNATE DATE 09/12/2016 N/A 09/10/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 11 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. a160-11131 EXPIRES: 09/3012014 (09-2011)
Estimated burden per response to comply with lhis voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information coNection Is used to plan budgets and resouroas for operator examinations. Send comments regarding burden estinate to llle Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mail to lnfocoHects.Resourca@nrc.gov, and to llle Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOS-10202, (3150-0131), Oftlce of Management and Budge~ Washington, DC 20503. If a means used to Impose an Information coRection does not display a currently vafld OMB control number, tile NRC msy not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Clinton Power Station, Unit 1 III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016
- CY2017
- CY2018 CY2019 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2016 CY2017 CY2018
- CY2019 OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/10/2016 N/A 10/22/2018 N/A AlTERNATE DATE 10/17/2016 N/A 10/29/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE
- SEPTEMBER DECEMBER CY 2016 MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 10 0 CANDIDATES NRC FORM 536 (00-2011)
Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: OS/30/2014 (09-2011)
Estinated burden per response to comply wi1h lhls voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnfonnation coNection Is used to plan budgets and resources for operator examinations. Send commenls regarding burden estinate to !he lnlormaUon Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission. Washington, DC 20555-0001, or by internet e-EXAMINATION DATA rna>> to lnfocoHecls.Resource@nrc.gov, and to the Desk Officer, OffiCB of infonnation and Regulatory Affairs, NEOB-10202, (3150-0131), Ofllca of Managemant and Budget Washington, DC 20503. if a means used to Impose an infonnation colection does not display a currentiy valid OMS control number, lha NRC may not condUct or sponsor, and a parson Is not required to respond to. the Information collection.
FACILITY NRl'Kt:GION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016
- - CY2017
- CY2018 CY2019 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2016 CY2017
- CY2018 CY2019 OPERATORS 0 2 0 3 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 10 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 08/08/2016 08/28/2017 NIA 03/25/2019 ALTERNATE DATE 08/15/2016 08/2112017 NIA 04/01/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0 0 0 0 0 9 0 CANDIDATES NRC FORM 536 (011-2011)
Attachment 6 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..()131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information coHection Is used to plan blldgets and resources for operator examinations. Send comments regarding bllrden estimate to the Information Setvices Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an Information collection does not display a currentiy vald OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information col/eel/on.
FACIUTY Nt<CKEGION LaSalle CoWlty Station, Units I and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018 CY2019 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2016
- CY2017
- CY2018 CY2019 OPERATORS 10 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 9 0 9 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/17/2016 N/A 10/15/2018 NIA ALTERNATE DATE 10/24/2016 N/A 10/22/2018 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2016 SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 19 0 0 CANDIDATES NRC FORM 538 (09-2011)
Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09*2011)
Estimated burden per response lo comply with this voluntary Information coHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This ilformatlon coRection Is used to plan budgets and resources for operalor examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulalory Commission, Washlnglon, DC 20555-0001, or by Internet e-maO to lnfocollecte.Resource@nrc.gov, and to the Desk Officer, Office or Information and EXAMINATION DATA Regufalory Affairs, NEOB-10202, (315~131), Oflice of Management and Budge~ Washington, DC 20503. If a means used lo impose an Information colection does not display a currently vaQd OMS control number, the NRC may not condutl or sponsor, and a person Is not required to respond to, the Information coHection.
FACILITY (NRC REGION Limerick Generating Station, Units 1 and 2 I Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018
- CY2019 LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 8 7 8 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 5 5 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 2 2 2 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 01/18/2016 02/06/2017 02/05/2018 02/04/2019 ALTERNATE DATE 01/25/2016 02/13/2017 02112/2018 02/11/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 13 0 0 0 11 0 CANDIDATES NRC FORM 536 (09-201 1)
Attachment 8 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014 (09*2011)
Estimated burden per response to comply with this voluntary Information collectioo request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information colection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (315()..()131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information colaction doss not display a curraotiy vaid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.
FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit 1 I Renewed Facility Operating License No. DPR-63 NRC Docket No. 50-220 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018
- CY2019 LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 10 0 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03/06/2017 N/A 03/04/2019 ALTERNATE DATE N/A 03/13/2017 N/A 03/11/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE
- SEPTEMBER DECEMBER CY 2016 MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 18 0 CANDIDATES NRC FORM 536 (09-2011)
Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09130/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e*
mail to tnfocollects.Resource@nrc.gov, and to the Desk Officer, OffiCe of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an Information collection does not display a cunenUy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit 2 I Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016
- CY2017
- CY2018 CY2019 LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 0 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 0 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A N/A 03/05/2018 N/A ALTERNATE DATE N/A N/A 03/12/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 18 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160..0131 EXPIRES: 09/30/2014
{09*2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnfonnalion colection Is used to plan budgets and resouroas for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to lnfocol\ecte.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503. If a means used lo Impose an Information colection does not display a curranUy valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACILITY INK<;Kt:.I,;IUN Oyster Creek Nuclear Generating Station I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018 CY2019 LICENSEE-PREPARED 1 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 5 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 5 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/01/2016 N/A N/A N/A AlTERNATE DATE 02/08/2016 N/A NIA N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE
- SEPTEMBER DECEMBER CY 2017 ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 {09-2011)
Attachment 11 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information coHection Is used to plan budgets and resources for operator examinations. Send commen1B regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet a-mall to lnfocoUects.Resource@nrc.gov, and to the Desk OffiCBf, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-1 0202, {3150-0131 ), Office of Management and Budge~ Washington, DC 20503. If a means used to Impose an Information coUection does not display a currentiy vaHd OMB control number, the NRC may not conduct or sponsor, and a person Is not requlllld to respond to, the information collection.
FACILITY NRC REGION Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018 CY2019 LICENSEE-PREPARED 0 1 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2016 CY2017 PROPOSED NUMBER
- - CY2018
- CY2019 NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED *see LGS
- seeLGS *see LGS *see LGS PROPOSED DATES PRIMARY DATE N/A 03/20/2017 NIA 03/25/2019 ALTERNATE DATE N/A 03/27/2017 N/A 04/01/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 13 0 CANDIDATES NRC FORM 536 (09-2011)
~~~~~~----------------- ---- -------- ----
Attachment 12 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRC FORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per respoll$8 to comply wllh lhls voluntary lnlonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnfonnation coNection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to lhe lnfonnation Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA mail to lnfocollecls.Resource@nrc.gov, and to 1he Desk OffiCer, Office of lnfonnation and Regulatory Affairs, NEOB-10202, (315().0131), Office of Management and Budge~ Washington, DC 20503. If a means used to impose an lnfonnation colection does not display a currently valid OMB control number, lhe NRC may not conduct or sponsor, and a person Is not required to respond to, 1119 infonnetion collection.
FACILITY NRC REGION Quad Cities Nuclear Power Station, Units 1 and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Dockets Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017 CY2018
- CY2019 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2016 CY2017 CY2018
- CY2019 OPERATORS 3 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/25/2016 N/A 08/20/2018 NIA ALTERNATE DATE 08/0l/2016 N/A 09/17/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE
- SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 12 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Attachment 13 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This ilformation coMection Is used to plan budgets and resouroes for operator examinations. Send comments regarding burden estimate to the Information Ser'lices Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-f0202, (3150-0131), Oflica of Management and Budge~ Washington, DC 20503. If a means used to Impose an information colection does not display a currentiy valid OMS control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.
FACILITY NRC REGION R. E. Ginna Nuclear Power Plant I Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2016 CY2017
- CY2018
- CY2019 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR OPERATORS 10 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 1 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 12/05/2016 N/A 12/03/2018 N/A ALTERNATE DATE 12/12/2016 N/A 12/10/2018 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 11 0 0 CANDIDATES NRC FORM 536 (09-2011)
Attachment 14 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMS: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)
Esllmated burden per response to comply With this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resourt:es for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to lnfocollects.Resouroa@nro.gov, and to the Desk Officer, Oftlce of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, oc 20503. If a means used to impose an Information colection does not display a currentiy valid OMB control number, the NRC may not conduct or sponsor, and a person Is nol required to respond to, the Information collection.
FACILITY [NRC REGION Three Mile Island Nuclear Station, Unit I I Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY20I6 CY2017 CY2018 CY2019 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 9 0 12 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018
- CY2019 NUMBER OF REACTOR OPERATORS 0 3 0 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 I 0 I NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 09/25/2017 NIA 09/23/2019 ALTERNATE DATE N/A 10/02/2017 N/A 09/30/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2017 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 8 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 April29, 2014 NRC REGULATORY ISSUE
SUMMARY
2014-05 PREPARATION AND SCHEDULING OF OPERA TOR LICENSING EXAMINATIONS ADDRESSEES All holders of, or applicants for, a power reactor operating license or construction permit under Title 10 of the Code of Federal Regulations (1 0 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those that have certified that they have permanently ceased operations and fuel has been permanently removed from the reactor vessel.
All holders of, or applicants for, a power reactor early site permit or a combined license under 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants."
INTENT The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS) to inform addressees of the NRC staffs need for updated information on projected site-specific operator licensing examination schedules, as well as on the estimated number of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs). This information will help the NRC to use its resources more effectively.
This RIS requires no action or written response on the part of addressees. Addressee actions to collect and transmit the information requested are strictly voluntary.
BACKGROUND INFORMATION Subpart E, "Written Examinations and Operating Tests," of 10 CFR Part 55, "Operators' Licenses," contains the relevant NRC regulations. In particular, 10 CFR 55.40, "Implementation," permits nuclear power reactor facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41, "Written Examination: Operators," and 10 CFR 55.43, "Written Examination: Senior Operators," subject to certain conditions. Under 10 CFR 55.40, facility licensees may also prepare the NRC-administered operating tests required by 10 CFR 55.45, "Operating Tests." Under 10 CFR 55.40(c), facility licensees that choose not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examinations and operating tests.
In RIS 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," dated June 7, 2013, the NRC asked power reactor licensees to voluntarily submit proposed schedules of examinations they intended to prepare and to estimate the number of applicants to be tested for onsite examinations and GFEs in calendar years (CYs) 2015 through 2018. This RIS ML14042A493
RIS 2014-05 Page 2 of 4 requests that licensees voluntarily update examination schedules and applicant estimates for CYs 2016 through 2019.
SUMMARY
OF THE ISSUE The NRC uses nearly twice as many resources to prepare an examination as to review, approve, administer, and document a licensee prepared examination. The number of examinations administered by licensees fluctuates annually. Consequently, the NRC has found it helpful to request an annual update of the operator licensing examination needs of power reactor facility licensees. Moreover, with the anticipated number of new operator positions that will need to be filled for new plants, the differences in upcoming years could be significant.
Therefore, the NRC requests that licensees evaluate their response to this RIS in this light, particularly for the later years. The update should include an estimate of the number of applicants to be examined and should indicate if the licensee or the NRC will prepare the exam.
In their responses, those utilities not planning to construct a new plant should consider the impact of licensed operators moving between utilities to fill the anticipated openings in the future. This information will help the NRC budget its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.
The NRC requests that each licensee provide the following information using NRC Form 536, "Operator Licensing Examination Data" (NRC Form 536 is available on the NRC Web site at http://www. nrc. gov/read ing-rm/doc-collections/forms/):
A. Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and the number of examinations you will request the NRC to prepare during CYs 2016 through 2019. For examinations that facility licensees will prepare, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless the licensee specifies otherwise.
Joint NRC and licensee examination development is permitted and should be coordinated with the NRC regional office. You should notify the applicable NRC regional office, by letter, of any required schedule changes that arise after submission of your RIS response for agreement to, and coordination of, changes to examination administration.
B. Initial Operator License Examinations For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of the examination. If you are requesting more than one examination perCY, fill in the applicable columns as appropriate through CY 2019.
C. Proposed Generic Fundamentals Examination Schedule Estimate by month the number of applicants who plan to take the GFE in CYs 2016 and 2017.
As the industry has requested, the NRC now administers the GFE four times per year.
VOLUNTARY RESPONSE The NRC asks addressees choosing to submit the information requested in NRC Form 536 to do so within 30 days of receiving this RIS. Direct your response to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, and send a copy of the response to the applicable regional office. You may submit responses electronically.
RIS 2014-05 Page 3 of 4 BACKFITTING AND ISSUE FINALITY This RIS requests the addressees to inform the NRC of the dates and number of operator licensing examinations and the NRC's generic fundamentals examinations in CY 2016-2019 and whether the licensee or the NRC will prepare the exams. The RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the request contained in this RIS is strictly voluntary. Therefore, this RIS does not represent backfitting as defined in 10 CFR 50, 109(a)(1 ),
nor is it otherwise inconsistent with any issue finality provision in 10 CFR Part 52.
Consequently, the NRC staff did not perform a backfit analysis.
FEDERAL REGISTER NOTIFICATION The NRC did not publish in the Federal Register a notice of opportunity for public comment on this RIS because it pertains to an administrative aspect of the regulatory process that involves the voluntary submission of information on the part of addressees.
CONGRESSIONAL REVIEW ACT This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808) and, therefore, is not subject to the Act.
PAPERWORK REDUCTION ACT STATEMENT This RIS contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0131. The burden to the public for these information collections is estimated to average 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collection.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
RIS 2014-05 Page 4 of4 CONTACT Please direct any questions about this matter to the technical contacts listed below.
IRA/ IRA/
Michael C. Cheok, Director Lawrence E. Kokajko, Director Division of Construction Inspection Division of Policy and Rulemaking and Operational Programs Office of Nuclear Reactor Regulation Office of New Reactors Technical Contacts: John McHale, NRR Michael Junge, NRO 301-415-3254 301-415-7745 E-mail: john.mchale@nrc.gov E-mail: michael.junge@nrc.gov Donald Jackson, Rl Malcolm Widmann, Rll 61 0-337-5306 404-997-4550 E-mail: donald.jackson@nrc.gov E-mail: malcolm.widmann@nrc.gov Hironori Peterson, Rill Eugene Guthrie, Rll 630-829-9707 404-997-4662 E-mail: hironori.peterson@nrc.gov E-mail: eugene.guthrie@nrc.gov Vincent Gaddy, RIV 817-200-1159 E-mail: vincent.gaddy@nrc.gov
- concurred via e-mail OFFICE OLA:IOLB:DIRS Tech C:IOLB:DIRS DD:DIRS C:COLB:DCIP:NRO* PMDA*
Editor*
NAME CReve lie QTE JMcHale A Howe MJunge LHill (CErlanger for)
DATE 02/19/14 02/24/14 03/21/14 03/26/14 03/28/14 03/19/14 OFFICE OIS OE* OGC* LA:PGCB:DPR PM:PGCB:DPR C:PGCB:DPR NAME KBenney GGulla HBenowitz CHawes JKeene SStuchell DATE 04/08/14 03/19/14 04/14/14 04/16/14 04/17/14 04/17/14 OFFICE D:DCIP:NRO DD:DPR DD:DPR NAME MCheok SBahadur LKokajko DATE 04/24/14 04/25/14 04/29/14 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 January 27, 2014 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Co., LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
Dear Mr. Pacilio:
We have received your corporate letters RS-12-114, dated July 5, 2012, and RS-13-183, dated July 8, 2013. In these letters, you requested that initial operator licensing examinations be scheduled at the Quad Cities Nuclear Power Station for April2016 and August 2018.
We note in Letter RS-12-114 that you requested an April2016 initial license exam date. In Letter RS-13-183, your initial license exam date was moved from April to August 2016. The NRC cannot support moving this exam date to August 2016. You have been scheduled for an initial license exam for the weeks of April 25 and May 2, 2016, with an onsite validation date of April 4, 2016. Additionally, we have scheduled an initial license exam for the weeks of August 6 and 13, 2018, with an onsite validation date of July 16, 2018.
We note that you were previously scheduled for an initial operator licensing exam the weeks of April 21 and 28, 2014, with an onsite validation date of March 31, 2014. This exam date has not changed; however, based on recent telephone communications with Mr. C. Burkhart of your staff and Mr. B. Palagi of my staff, the examination will only require the week of April 28, 2014.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for each of these examinations, the examinations were each scheduled for two weeks. Please inform us if the number of candidates change for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 120 days prior to the examination informing the training manager of the chief examiner's name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRA!
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ'
M. Pacilio In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 cc: Distribution via ListServ' DISTRIBUTION:
Ernesto Quinones RidsNrrDorllpl3-2 Resource RidsNrrPMQuadCities Resource RidsNrrDirslrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRS III Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: Ltr 012714 Quad Cities Confirmation of Initial OL Exam.docx 1:8:1 Publicly Available D Non-Publicly Available D Sensitive 1:8:1 Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" =Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
==T====r========9==9~==========T9 OFFICE Rill I Rill Rill Rill NAME RKWalton:bl HPeterson DATE 01/22/14 01/27/14 OFFICIAL RECORD COPY
4300 Wi11fieid Road Wilm*rwrlie. IL 60555 Exelon Generation(. 630 657 2000 Office RS-12-114 July 5, 2012 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
July 5, 2012 U. S. Nuclear Regulatory Commission Page 2
Subject:
Exelon Generation Company, LLC (EGC} Response to NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 The referenced Regulatory Issue Summary (RIS} requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2014 through 2017, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2014 and 2015. Attachments 1 through 11 provide responses to RIS 2012-07 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
In calendar year 2016, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO} initial license examination as indicated on Attachment 7. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS}. Since the LSRO examination is a dual-site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.
There are no regulatory commitments contained within this letter. Shouid you have any questions regarding this letter, please contact Dwi Murray at (630} 657-3695.
~*
~vidM.G~
Manager - Licensing Exelon Generation Company, LLC - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station -Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - ILT - Completed NRC Form 536 for Limerick Generating Station - LSRO - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 1 - Completed NRC Form 536 for Three Mile Island Nuclear Station
Attachment 1 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM538 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BV OMB: NO. 3150..0131 EXPIRES: 09130/2014 (9-2011) Estimated burden per mponse to cxxnply with this voluntary lnfonnalion colleCtion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thill lnf01T1111don c:olledlon Is used to plan budgets and res01m1s for operalor examinations. Sand comments regalding burden estimate 1o the Information Services Branch OPERATOR LICENSING (T*5 F53), U.S. Nuclell' Regulatory Commluion, Waehfngton, DC 20555-0001, or by Internet e-mall lo lnfocollects.Resource@m:.gov, and to lha Desk Officer, Office ol lnfonnation and EXAMINATION DATA Regulaloly Afairs, NEOB-10202. (3151J.0131), Office ofManegement and Budge~ Washington, DC 20503. If a means used to impose an Information cdlaction does not display a aJll1!1111y valid OMB conl!ol number. the NRC may not conduct or sponsor, and a pen;on II not n~quired to respond to, the lnfonnltion coMeetion.
FACILITY INRC Kt:.UIUI'I Braidwood Station, Units l and 2 Facility Operating License Nos. NPF-72 and NPF-77 III NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 0 6 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 10 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 01/05/2015 11107/2016 N/A ALTERNATE DATE N/A 01126/2015 10/24/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2014 JUNE SEPTEMBE~ DECEMBER MARCH JUNE CY 2015 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC FORM 538 (9-2011 J
Attachment 2 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM53t U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09130/2014 i9*2011)
Esllmillad burden per response to comJiy with this Vllluntary lnflll11lation colledion I'IIQU8St 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnf0111111Uon collection Is used lo plan budgetJ and resoun:.1 for opii!IIOr euninlltiD11!1. Send canmenll regarding burden estimale to lhe lnformaUon Services Brancll OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regi.Utccy Cornmlsslcn, Wutington, DC 20555-01101, or by 1n11111et a-mal to lnfocollects.Resource@nrc.gov, and to the Desk Ollfcar, Office or Information and EXAMINATION DATA Regi.ialory Allalrl, NEOB-10202. (3150-0131), Oftlca of Managll!1enl and Budge~ Washington, DC 20503. If a means used to impose an infonnltion collection does not display a currenlly valid OMB coniiOI number, 1ht NRC may not conduct or sponsor, and a perscmla not required to respond to, lha Information catedion.
FACIUTY NRCR.I:GION Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 III NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY20l4 CY2015 CY2016 CY2017 OPERATORS 6 4 0 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 9 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 1 0 1 NUMBER OF SENIOR REACTOR OPERATORS* UMITED 0 0 0 0 PROPOSED DATES PRIMARY QATE 06/02/14-06/13/14 08/17/15-08/28/15 N/A 06/19/17-06/30/17 ALTERNATE DATE 06/16/14- 06/27/14 08/31/15-09/11/15 N/A 07/03/i 7. 07114/17 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBER DECEMBER MARCH JUNE CY 2015 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 11 0 0 0 0 0 0 15 CANDIDATES NRC FORM 536 i9-20111
Attachment 3 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 09130/2014 (g.2011)
Estillllled burden per response Ia comply wilh lhis vokmtary Information collection request 1 hoor. This information collection Is IIS8d to ~an buciglllfl and reso.rr.as lor cperator examinations. Send comments regarding bunlen 111timale to lhs Information Services Bn111ch OPERATOR LICENSING (T.S F53}, U.S. Nuclear Regulalory Commission, Washington, DC 20555-0001, or by internet e-mal 10 lnfocolfecb.Re1011tte0m:.gov, and to the Desk Officer, Oflic:B of lnloonation and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150.0131), Oflice of Management and Budget. Wlllhlngton, DC 20503. If a means used Ia Impose an information colllctlon doss not display 1 currantly valid OMB control number, the NRC may not conduct or spensor, and a pemn is not n~quired Ia respord lo, the information coledlon.
FACIUTY INRCRI:GION Clinton Power Station Facility Operating License No. NPF-62 Ill NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 0 4 0 6 NUMBER OF SENIOR REACTOR OPERATORS *INSTANT 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 4 0 2 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03/16/2015 N/A 02/21/2017 AlTERNATE DATE N/A 03/23/2015 NIA 02/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBER DECEMBER MARCH JUNE CY 2015 SEPTEMBEf' DECEMBER ESTIMATED NUMBER OF 10 0 0 0 0 0 0 12 CANDIDATES NRC FORM 536 (9*2011)
Attachment 4 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 0913012014 (9-2011)
Estlmaled burden per response Ill comply wilh lhis volunlaly infalmaUon collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection Is used to plan budgela and resources for operator examinations. Send comments regarding burden estimate 10 the lnfonnatlon Sll'lices Branch OPERATOR LICENSING (T*S F53), U.S. Nuclell' Reg~Aaloly Commission, WashlngiOn, DC 20555-0001, ot IJf internet e-mail to lnfocalleds.Reslllllte@rvc.gov, and to the Desk Offlcer, Office ol Information and EXAMINATION DATA Regulatory Alrai11, NEQB..10202, (3150.0131), Ollice of Management and Budget. Washington, DC 20503. If a means used to Impose llllnformalicn collecUcn does not dlspliJY a CUITtllUy valid OMS ocntm1 number, the NRC lillY not conducl or spomor, and
- person is not required to respond to, lhe Information colectlon.
FACILITY NRCHJ::I.ii\JN Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 III NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC.PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016
- CY2017 OPERATORS 0 6 4 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 5 7 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03/02/2015 08/08/2016 N/A ALTERNATE DATE N/A 03/23/2015 08/22/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBEI' DECEMBER MARCH JUNE CY 2015 SEPTEMBEF DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 12 0 0 CANDIDATES NRC FORM 5Jil (9*2011)
Attachment 5 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORMS36 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 0913012014 (9-2011)
Estimated burden per response Ill comply wMh lhill voluntaty lnlarmstion colleclian request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnlonnallon coledlan is used to plan budgets and resources fat cpen~tor examinations. Send commenls reganing burden esllmate to lhe lnlonnatlon Services Brandl OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regufaloly Commission, Washington, DC 20555-0001, or bV inlemet e-mal to lnfocallects.RI!SOIA't:8@nrc.gov, and to the Desk Officer, Oflce ot Information and EXAMINATION DATA Regulltmy Nfafra, NEOB-10202, (3150.{)131), Ofllce ot Management and B\ldget. Wastington, DC 20503. If a me.,& used la imp018 en inlonnalion colledlan does nat display a currently valid OM8 conlrol number. lha NRC may not conduct or sponsor, and a parson is not required la respond la, tha Information colec:tlon.
FACILITY NK!; fii:UION LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 m NRC Docket Nos. STN 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014
- CY2015 CY2016 CY2017 NUMBER OF REACTOR OPERATORS 5 0 . 7 0 NUMBER OF SENIOR REACTOR OPERATORS *INSTANT 4 0 s 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 0 1 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/14/2014 NIA 10/ll/2016 NIA ALTERNATE OATE 10/20/2014 N/A 10/17/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBER DECEMBER MARCH JUNE CY 2015 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 13 0 0 CANDIDATES NRC FORM ~36 (9*2011)
Attacnment o Exelon Generation Company,LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.0131 EXPIRES: 0113012014 (9-2011)
Estimated burden per response to comply with this voluntary infcnnalion collection 11qUelt 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information c:otlaction Is used to plan budgets and resoutt:n for operell'lr exarninaUons, Send commenls regarding burden estimate to tha Wormatlon Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear R&gUatory CommiiiSion, Wuhington, DC 20555-0001, or by Internal e-mall to lnfocallects.Resource@nrc.gov, and to tha Desk Oflicer, Oft!ce of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150.0131), Oflce of Management and Budget. Wuhingtan, DC 20503. If a means used to impose an inlormadan colectlan does not display a QlrrenUy vald ot.ta control number, the NRC may not conduct or sponsor, and a pen;on is not required to raspond to, lht inbmaUon calectlon.
FACILilY I NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATEO NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 6 0 8 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 10 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/06/2014 N/A 10/03/2016 N/A ALTERNATE DATE 10/14/2014 N/A 10/11/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2014 JUNE SEPTEMBER DECEMBER MARCH CY 2015 JUNE
- SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 14 0 0 CANDIDATES NRC FORM 53& (9*2011)
Attachment 7 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150.Q131 EXPIRES: 09/3012014 (9-2011)
Estimated burden per response to comply with this voluntary lnfonnatfon collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Tlis Information alllection Is used 1o plan budgets and resources for operator elC8111inallone. Send comments ragan:ling burden estimate to lhe Information SetVices Branch OPERATOR LICENSING (T*5 F53), U.S. Nuclear Regulalay Commlslkln, Washington, DC 20555-0001, or by Internet e-EXAMINATION DATA or mal to lnfocollacts.Resource@twc.gov, and 1o the Desk Officer, Oflice Information and Regulalay Alfails, NEOB-10202, (3150.()131), Olb of Management and Budget washington, DC 20503. II a meana used to Impose an lnlbrmetion colledlon does not display 1 c:unenay valid OMS con1rol nurnbef, the NRC may not conduct or sponsor, and a person is not requl!ed to respond to, lhe Information collecllon.
FACILITY NRC REGION Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 I NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 0 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 6 0 PROPOSED DATES PRIMARY DATE NIA NIA 07/18/2016 N/A ALTERNATE DATE N/A NIA 07/25/2016 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBER DECEMBER MARCH CY 2015 JUNE
- SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (9*20111
Attacnment ~
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 0913012014 (9-2011)
Esllmated blllden per r8!p011SII to C0111Jiy will !his voluntaty information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This inlonnltion oohclon is used to ~an budgets and rescun:es for operator etlminalions. Send comments regarding bll'den esllmale 1o the tnlormation Sl!l'lk:es Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington. DC 20555-(]001, or by Internet e-mal to lnfocolects.Rescurce@nn:.gov, and lo the Desk Ollk:er, Ollice r:J Information and EXAMINATION DATA Regldalory Alfalrs, NEOIH0202. (3150.0131), Office of Management and Budge~ Washington, DC 20503. If a means Ulllld to lmpC6e an Information collection does not dflplay a currenUy vaid OMB control numller, the NRC may not condud ar sponsor, and aperson is not required 10 respond to, !he inlormation coleclian.
FACILITY [NRC REGION Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 I NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED l 0 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRc-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 4 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 2 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 05/19/2014 N/A N/A N/A ALTERNATE DATE 06/02/2014 N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBER DECEMBER MARCH CY 2015 JUNE
- SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 0 CANDIDATES NRC FORM 53& (g.2011)
Attachment 9 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM53t U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 0913012014 (9-2011)
Estimated burden per responH to comply with 11111 voklniiJY infonnatlon ca(eciJon request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnfimnallon coiledion il used to pl.n budget. and resources lor operator examinations. Send commenfl regarding butden esdmall Ia the lnlonnetlon Services Branch OPERATOR LICENSING (T-5 F53}. U.S. Nuclear RtgiJatary Commission, Washington, DC 2055~001, or by inllmet e-mli to lnl'ocollecb.RIIsource@nfc.gov, and to Iiiii Oask Officer, Otlice d lnformaHan and EXAMINATION DATA R~atary .Aifal!s, NEOB-10202, (3150.0131), Oftlce of Management and Budget. Washington, DC 20503. Wa l11t!SII used to Impose an inlonnilllon cdlecllon does not display a amnuy vllid OMS control number, the NRC may not conduct or spoosor, and
- pmon is not required to respond lo, !Ita inbmaion coledlon.
FACILITY NI'ICRIOI.SIUN Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 I NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 0 6 0 3 NUMBER OF SENIOR REACTOR OPERATORS *INSTANT 0 3 0 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 3 NUMBER OF SENIOR REACTOR OPERATORS
- LIMITED *See LOS * *
- PROPOSED DATES PRIMARY DATE NIA 03/23/2015 N/A 03/20/2017 ALTERNATE DATE NIA 03/30/2015 N/A 03/27/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 8 0 CANDIDATES NRC FORM 538 (9-2011 I
Attachment 10 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OM&: NO. 3150.0131 EXPIRES: 09/3012014 (9-2011)
Eslinaled buJden per response to C011111y with lhts voluntary irtonnalion colledlon ruq~est 1 hwr. This lnfonnallon collection Is used lo plan b~dgels and I'IIOIIICIII for cperalar examinations. Send commenll regarding bunlen estimale lo the Information Services Branch OPERATOR LICENSING {T*5 F53~ U.S. N~clear Regulatofy Commlulon, Washing!on, DC 20555-0001, or by inla'nete-mail to lnfoccllects.Reaoun:e@nrc.gav, and to the De&k Ollicer, Oflic:e of lnlilrmation and EXAMINATION DATA Reg~atary Man, NEOB-10202. (3150.0131), Office of Management and Budge~ Washington, DC 20503. If a means used to imp0111 an Information coledlon does not display a ament1y vaid OMB control runber. the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.
FACIUTY NRo;; Kl:t>IUN Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 III NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 5 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS
- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 04/21/2014 N/A 04/25/2016 N/A ALTERNATE DATE 05/19/2014 N/A 05/23/2016 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2014 SEPTEMBER DECEMBER MARCH JUNE CY 2015 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 10 0 0 0 0 CANDIDATES NRC FORM 536 (9*2011)
Attachment 11 Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 3150..0131 EXPIRES: 091301201.4 (9-2011)
Estimated burden per response to comply will this volunlaly information collection reqve&l: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This inlorrnallon colection Is used to plan budget5 and rssoui'C8II lor operator examlnaUons. Send commenls regarding burden estimate to the Information Servicas Bllllldl OPERATOR LICENSING (T-5 F53), U.s. Nude at R~aklly Commisalon, Washington, DC 20555-0001, or by lnlamel a-mail to tnfocolfects.Resoun:a@m:.gov, and to the Desk Officer, Office of lnfcnnallon and EXAMINATION DATA Regulato.y Alfalrs, NEOB-10202, (3150..()131), Office of Management and Budget. Washington, DC 20503. If e means used to Impose an Information cdlectlon does not di~P~SY a currenUy valid OMS cooltOI number, the NRC may not conduct or sponsor, and a p111on Is not rsquired to respond to, lha Information colection.
FACILITY NRCI<t:UIUN Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 I NRC Docket No. 50~289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATEO NUMBER OF CY2014 CY2015 CY2016 CY2017 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2014 CY2015 CY2016 CY2017 OPERATORS 4 4 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 9 0 10 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 0 1 NUMBER OF SENIOR REACTOR OPERATORS -LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 02/10/2014 08/17/2015 N/A 08/21/2017 ALTERNATE DATE 04/07/2014 09/14/2015 N/A 09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (9-20111
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 June 8, 2012 NRC REGULATORY ISSUE
SUMMARY
2012-07 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS ADDRESSEES All holders of or applicants for a power reactor operating license or construction permit under Title 10 of the Code of Federal Regulations (1 0 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
All holders of, or applicants for, a power reactor early site permit, standard design certification, standard design approval, manufacturing license, or a combined license under 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants."
INTENT The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary {RIS) to inform addressees of the NRC staff's need for updated information on projected site-specific operator licensing examination schedules, as well as on the estimated number of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs). This information will help the NRC to more effectively use its resources.
This RIS requires no action or written response on the part of addressees. Addressee actions to collect and transmit the information requested are strictly voluntary.
BACKGROUND INFORMATION Subpart E, "Written Examinations and Operating Tests," of 10 CFR Part 55, "Operators' Licenses," contains the relevant NRC regulations. In particular, 10 CFR 55.40, "Implementation," permits nuclear power reactor facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41, 'Written Examination: Operators,"
and 10 CFR 55.43, 'Written Examination: Senior Operators," subject to certain conditions.
Under 10 CFR 55.40, facility licensees are also permitted to prepare the NRC-administered operating tests required by 10 CFR 55.45, "Operating Tests." Under 10 CFR 55.40(c),
facility licensees that choose not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examinations and operating tests.
In RIS 2011-04, "Preparation and Scheduling of Operator Licensing Examinations," dated May 25, 2011, the NRC asked power reactor licensees to voluntarily submit proposed ML120650174
RIS 2012-07 Page 3 of 4 VOLUNTARY RESPONSE The NRC asks addressees choosing to submit the information requested in NRC Form 536 to do so within 30 days of receiving this RIS. NRC Form 536 is available on the NRC Web site at http://www.nrc.gov/readinq-rm/doc-collections/forms/. Direct your response to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, and send a copy of the response to the applicable regional office. You may submit responses electronically.
BACKFIT DISCUSSION This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the request contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109, "Backfitting." Consequently, the NRC staff did not perform a backfit analysis.
FEDERAL REGISTER NOTIFICATION The NRC did not publish in the Federal Register a notice of opportunity for public comment on this RIS because it pertains to an administrative aspect of the regulatory process that involves the voluntary submission of information on the part of addressees.
CONGRESSIONAL REVIEW ACT This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808) and, therefore, is not subject to the Act.
PAPERWORK REDUCTION ACT STATEMENT This RIS contains and references information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collection requirements were approved by the Office of Management and Budget, approval numbers 3150-0011,3150-0151, 3150-0018 and 3150-0131.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
RIS 2012-07 Page 2 of 4 schedules of examinations they intended to prepare and estimate the number of applicants to be tested for onsite examinations and GFEs in calendar years (CYs) 2013 through 2016.
This RIS requests that licensees voluntarily update examination schedules and applicant estimates for CYs 2014 through 2017.
SUMMARY
OF THE ISSUE The NRC uses nearly twice as many resources to prepare an examination as to review, approve, administer, and document a licensee-prepared examination. The number of examinations administered by licensees fluctuates annually. Consequently, the NRC has found it helpful to request an annual update of the operator licensing examination needs of power reactor facility licensees. Moreover, with the anticipated number of new operator positions that will need to be filled for new plants, the differences in upcoming years could be significant.
Therefore, we request that licensees evaluate their response to this RIS in this light, particularly in the latter years. The update should include an estimate of the number of applicants to be examined and if the licensee or the NRC will prepare the exam. For those utilities not planning to construct a new plant, their response should consider the impact of licensed operators moving between utilities to fill the anticipated openings in the future. This information will help the NRC budget its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.
The NRC is requesting that each licensee provide the following information on the enclosed NRC Form 536, "Operator Licensing Examination Data":
A. Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and the number of examinations you will request the NRC to prepare during CYs 2014 through 2017. For examinations that facility licensees will prepare, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless the licensee specifies otherwise.
Joint NRC and licensee examination development is permitted and should be coordinated with the NRC regional office. You should address any schedule changes that are required following submission of your RIS response in a letter to the applicable NRC regional office for agreement to and coordination of changes to examination administration.
B. Initial Operator License Examinations For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of the examination. If you are requesting more than one examination perCY, fill in the applicable columns as appropriate through CY 2017.
C. Proposed Generic Fundamentals Examination Schedule Estimate by month the number of applicants who plan to take the GFE in CYs 2014 and 2015.
As the industry has requested, the NRC now administers the GFE four times per year.
RIS 2012-07 Page 4 of 4 CONTACT Please direct any questions about this matter to the technical contacts listed below.
IRA by JLuehman for/ IRA by SBahadur for/
Laura A Dudes, Director Timothy J. McGinty, Director Division of Construction, Division of Policy and Rulemaking Inspections and Operational Programs Office of Nuclear Reactor Regulation Office of New Reactors Technical Contacts: John McHale, NRR Michael Junge, NRO 301-415-3254 301-415-7745 E-mail: john.mchale@nrc.gov E-mail: michael.junge@nrc.gov Donald Jackson, Rl Malcolm Widmann, Rll 610-337-5306 404-997-4550 E-mail: donald.jackson@nrc.gov E-mail: malcolm.widmann@nrc.gov Hironori Peterson, Rill Mark Franke, Rll 630-829-9707 404-997-4436 E-mail: hironori.peterson@nrc.gov E-mail: mark.franke@nrc.gov Mark Haire, RIV 817-200-1159 E-mail: mark.haire@nrc.gov
Enclosure:
As Stated
RIS 2012-07 Page 4 of 4 CONTACT Please direct any questions about this matter to the technical contacts listed below.
IRA by JLuehman for/ IRA by SBahadur for/
Laura A. Dudes, Director Timothy J. McGinty, Director Division of Construction, Division of Policy and Rulemaking Inspections and Operational Programs Office of Nuclear Reactor Regulation Office of New Reactors Technical Contacts: John McHale, NRR Michael Junge, NRO 301-415-3254 301-415-7745 E-mail: john.mchale@nrc.gov E-mail: michael.junge@nrc.gov Donald Jackson, Rl Malcolm Widmann, Rll 610-337-5306 404-997-4550 E-mail: donald.jackson@nrc.gov E-mail: malcolm.widmann@nrc.gov Hironori Peterson, Rill Mark Franke, Rll 630-829-9707 404-997-4436 E-mail: hironori.peterson@nrc.gov E-mail: mark.franke@nrc.gov Mark Haire, RIV 817-200-1159 E-mail: mark.haire@nrc.gov
Enclosure:
As Stated ADAMS ACCESSION NO.: ML120650174 OFFICE OLA:IOLB: TECH. C:IOLB:DIRS DD:DIRS C:COLP:DCIP:NRO D:DCIP:NRO DIRS EDITOR NAME CRevelle QTE JMcHale Jlubinski MJunge/PPieringer for LDudes/J Luehman for DATE 03/14/2012 03/30/2012 04/12/12 -+-=o74t:-:-13=-:t-:-::12::--+-=-o5=-:t-=-o1:-e:/2::-:o:-:-1-=-2--=---+--::-:o5::-:cto::-:2:-::/2::::o-:-:12::------i OFFICE OE OGC (NLO) PMDA OIS LA:PGCB:DPR PGCB:DPR NAME NHilton/LCasel for BJones L7H""ill,-----t--,T=:D::-o-n-ne-;cll;-t--::C::-:-H-:-a-w-es---+T=A:-:-Ie-x7io_n_----i
~D~A~T=E::--~07 5/~17~/~20~1~2------+~04~/2::-:5:-:-/1~2--1--::0~5~/07~~12::---~0~4~/2~4-:-:/1~2-1--::5~/3~17./1~2-----+~6/~1/:-:-12::--------i OFFICE C:PGCB:DPR D:DPR NAME KMorganButler/EBowman for TMcGinty/SBahadur for DATE 6/1/12 6/8/12 OFFICIAL RECORD
RIS 2012-07 Page 1 of 1 Enclosure NRC FOFtM $36 U.S. NUCI.EAR REGULATORY COMMISSION APPf<<W£0 8Y OMB: HO, 311S0..(113t EXPIR!S;Oti3QrZ01.
t'$-2CH)
E~b.lt'Cittti*'~ID~>Mll'ltttfb:~~~rt¢oo$l1 OPERA TOR LICENSING
"""*FSJ).VS-tT-~
Ttws~~4IAllldXIA:l~and~kWQfMtl£of
~ s...c~~txlfltMesflm.MtiCihe~SeM:u~
Nu';llt*~~.w~.oc 205SS.OOO,_Qib)'Mmeta*
mMto~~.f\W.WC~hOri:P.Cfilt:er.Oirceefl~W EXAMINATION DATA ~.-,......,.,NEOS-1-.tl1504>131).01b01_...,"""'""_
DC 2m3 nal!'!t1NUSildiQ~41fi~~dollinct~a~
v.aljd0MS~~ IJ'!IO'NRCffi/¥J~~w~,ard&petS(Wl-~~~
~IO.flit~~
f."ACJ:t.t'TV i"""'""'"
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY
-- CY
-- CY
-- CY LICENSEE*PREPA.RED EXAMINATtONS ESTIMATED NUMBER OF NRC*PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY CY CY CY PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS *INSTANT NUMBER OF SENIOR REACTOR OPERATORS*UPGRADE NUMBER OF SENIOR REACTOR OPERATORS* LIMlTED PROPOSED OATES PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY JUNE SEPTEMBER DECEMBER MARCH CY JUNE
--SEPTEMBER OECEMBER
£STtMATED NUMBER OF CANDIDATES
4300 Wrnfie!d Road Warrenville. IL 60555 Exelon Generation,,. 630 557 2000 Office RS-13-183 July 8, 2013 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
July 8, 2013 U. S. Nuclear Regulatory Commission Page2
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2013-06, "Preparation and Scheduling of Operator Licensing Examinations," dated June 7, 2013 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2015 through 2018, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2015 and 2016. Attachments 1 through 10 provide responses to RIS 2013-06 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
For the Limerick Generating Station (LGS) and the Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination. Rather than repeat the same information on both attachments, the examination scheduling information is provided on Attachment 6 for LGS. Attachment 8 for PBAPS references Attachment 6 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2015 through 2018, as indicated on Attachment 6.
There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Richard W. Mcintosh at (630) 657-2816.
Respectfully, 7/f David M. Gullett Manager- Licensing Exelon Generation Company, LLC -Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station -Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station - Completed NRC Form 536 for Quad Cities Nuclear Power Station 0- Completed NRC Form 536 for Three Mile Island Nuclear Station cc: Regional Administrator - NRC Region I Regional Administrator- NRC Region Ill
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 1 Page 1 of 1 NRC FORM536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information coffaction request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources lor operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T*5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-malt to lnfocoltects.Resource@nn:.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office or Management and Budge~ Washington, DC 20503. If a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGIUN Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015
- CY2016 CY2017 CY2018 LICENSEE-PREPARED 0 1 0 ) 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR OPERATORS 0 9 0 9 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 II 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 08/29/2016 N/A 05/14/2018 ALTERNATE DATE N/A 09/12/2016 N/A 05/29/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2015 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2016 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 20 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 2 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-11131 EXPIRES: 0913012014 (09-2011)
Eslimated burden per response lo comply wilh lhis volunlll)' irtormalion colleclion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This irtormalion colleclion is used lo plan budgels and resouroes for operalor examinalions Send commenls regarding burden esltmale lo lhe Information Services Branch OPERA TOR LICENSING (T-5 F53), U.S. Nuclear Regulalory C1111mission, Washinglon, DC 205ffi-rol1, or by irtemel e-mail lo lnfocdlecls.Resource@ITC.gov, and lo lhe Desk Officer, Office of lnformalion and EXAMINATION DATA Regulalmy Aff<irs, NEOB-'10202, (3150-0131), Office of Managemenl and 8uc%Jel. Washinglon, DC 20503. If a means used lo impose an irtormalion colleclion does nol display a currenlly valid OMS conlrol number, lhe NRC may nol condu:;l or sponsa', and a person is nol requred lo respond lo, lhe information colleclion.
FACILITY IN><<..;><I:CoiUN Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 m NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015
- CY2016 CY2017 CY2018 LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017
- - - CY2018 NUMBER OF REACTOR OPERATORS 0 5 8 7 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 7 7 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 1 1 1 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 03/28/16- 04/01/16 08/14/17- 08/18/17 12/03/18- 12/07/18 ALTERNATE DATE N/A 04/04/16 - 04/08/16 08/21117-08/25/17 12110/18- 14/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2016 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 16 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 3 Page 1 of 1 NRCFORM53e U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 31111l-0131 EXMES: 09/3812014 (09-2011)
Eslimallld Wllen per f8IPIJ1S8 fo comply 'lilt! !lis ~ lnbmatlon ccleclon l8qiJMI: 1 hllul. Thill irlalmallcn c:o11ect1oo Ia 111<<1 b 1i1f1 bUdge~~ and resou~a~~ iw opellllar llllliJ1irlatia, Send tXll'llmenla regardno burden eltin8te to fie lnlornwlion SeMces Bnn;l1 OPERATOR LICENSING CT*Sf53~ u.s. tu~ear~Comr~Uon, W8shi1giln. oc 205550001, orbyin\lmet
- mail b lc'lllcoleds.R8IQII'QI(Jtvc.o, II1CI Ia 1ha Desk Oflar, Oftbt of k1lonnBIIm and EXAMINATION DATA RegiEioly Main!, NEOll-10202, (3150-0131), Olb of Management and Budgat. Watili!1gbl, OC 20503. II a means llllld b lrnpo$8 an lol::ltnaticn collecfon does not chplay 1 CUIIllll8y vald OMS cantrcl number, the NRC may not oondud ar sponw, and I ptr10n II not requirad lo relj)OO(IIo, 1ha lnlormatlm colledbl.
FACIUTY [NRC Rl:UIUI'C Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 lli NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015
- CY2016 CY2017 CY2018 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2015 CY2016 CY2017
- CY2018 OPERATORS 4 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS- INSTANT 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/16/2015 N/A 02/21/2017 N/A ALTERNATE DATE 03/23/2015 N/A 02/27/2017 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2015 SEPTEMBER DECEMBER MARCH CY 2016 JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 12 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 4 Page 1 of 1 NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 01130/2014 (09-2011)
Esllmaled burden per response lo comply with this vcfuntay Information cdlectlon request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This lnfonnllllon coleclon Is used to plan budgets and resourtes lor operator examlnaUons. Send commants regilding burden estimate to the lnlonnation Services Branch OPERATOR LICENSING (T*S F53), U.S. Nuclear Regufalory ComrnCiaion, Washlnglan, DC 20555.0001, or by intl!ll'lllt e-EXAMINATION DATA mal to lnfoc:ollects.Rtsoun:e@lrue.gov, and to the Disk Officw, Oftlee 0( lnfcnnation and Regulalory Affalra. NE08*10202. (31S0.0131), Oftlat of Management and Budge~ Wasllingto1, DC 20503. Wa men used to lmposa an lnfonnadon cafeclion does not display a currenlly vald OMS control nllllber, the NRC may not conduct or sponsor, and a peiSOI1 is not required to respond to, the inlannation coiiKtion.
FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 Ill Renewed Facility Operating License Nos. DPR*l9 and DPR*25 NRC Docket Nos. 50*237 and 50*249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015 CY2016 CY2017 CY2018 LICENSEE-PREPARED 1 I 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2015 CY2016 CY2017 CY2018 OPERATORS 6 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS *INSTANT 5 7 0 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 I 0 0 NUMBER OF SENIOR REACTOR OPERATORS- UP.11TED 0 0 0 0 PROPOSED DATES PRIMARY DATE 03/02/2015 08/08/2016 N/A 10/01/2018 ALTERNATE DATE 03/23/2015 08/22/2016 N/A 10/15/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH JUNE CY 2015 SEPTEMBER DECEMBER MARCH JUNE CY 2016 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 7 CANDIDATES NRC FORM 538 (09*2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 5 Page 1 of 1 NRC FORM 53& U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS; NO. 3160-G131 EXPIRES: 09/30/2014 (09-2011)
Estima1ed burden per response lo comply wi1h this Vlllonlaty inklllnatiln collection reqllest: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This infOrmation 0Jilec11on is used 1o plan budgets ana resources lor operalor examna!ions. Send comments regring burden estimate lo lhe Jnforrnatlon Services Brooch OPERA TOR LICENSING (T*5 F53), U.S. Nucle<r Regulatory Coolmission, Washing!On, DC 20555-0001, or by internet e-mail b lnlocolects.Re5016Ce@nrc.gov, and lo 111e Desk Officer, Office of lnfOnnation ana EXAMINATION DATA RegUlatory Affairs, NEOB-1 0202, (3150-0131 ), Office of Management and Budget, Washingbn.
DC 20503. If a means used to impose an infonnation collecwn does not display a currently valid OMB control number. 111e NRC may not conduct or sponsor and a person is not required to respond to, lhe inf0nna6on collec11on.
FACILITY iNRCREGION LaSalle County Station, Units I and 2 III Facility Operating License Nos. NPF -II and NPF -18 NRC Docket Nos. STN 50-373 and STN 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015
- CY2016 CY2017 CY2018 LICENSEE-PREPARED 0 I 0 l EXAMINATIONS ESTIMATEO NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR OPERATORS 0 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 I 0 l NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE N/A 10/10/2016 N/A I 0/15/2018 ALTERNATE DATE N/A 10/17/2016 NIA 10/22/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 20!6 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 12 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (09*201 1)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 AttachmentS Page 1 of 1 NRCFORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-G131 EXPIRES: 09/301201 ..
(0!1-2011)
Estinated burden per response ID comply with lhts voluntary lnlannatian ~dian requet 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collectJon Ia used to plan budgab and rtsoun:es rw cperatar examinations. Send cammtflts regarding burden estimate ID 1111 tnfwmallon Service Branch OPERATOR LICENSING (T-5 F53). U.S. Nudear Rlgulatlll)l Commlsslall, Wuh!n9fDn, DC 205~001, w by illllllll*
mall to lnfacoltcts.Resaun:e@m:.gav, and to tha Oak Officer, Oftice al infonnaUon and EXAMINATION DATA Regulatlll)l Alfalrs. NEOB-10202. (315().0131), Ollica of Managamtflt and Budgtl, Washington, DC 20503. tl a means used to imjlose 111 inl'omtation calledon does notlisplay a CU11811Uy valid OMII control number, t111 NRC may not conduct or sponsor, and a I*SOI1 is not required to respa1d to, the inlannation catlectlon.
FACIUlY NRCRt:UIUN Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 1 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015 CY2016 CY2017 CY2018 LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2015 CY2016 CY2017 CY2018 OPERATORS 6 6 0 5 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 5 4 0 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE I 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS* LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 12/07/2015 12/05/2016 NIA 12/03/2018 ALTERNATE DATE 12/14/2015 12/12/2016 N/A 12/10/2018 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2015 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2016 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 13 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (011-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 7 Page 1 of 1 NRC FORM 536 U. 8. NUCLEAR REGULATORY COMMISSION APPROVED BY OMS: NO. 31S0.0131 EXPIRES: Ol/30t2014 (Q8.2011) Eslinal8d bunlan per rapmse kl COIJllly wlh lllls 'ftiiiJnay klfmnellan ca1ac11on requat 1 hOur. This i1kmation c:olldion Is USid ID piM budgels and _,.,_ lor operator uarrinaiOIIe. Send C0111111111s lllflllnling bwtlen aslfmall to Ill lnbmallan SeMcos Btanch OPERATOR LICENSING {T-5 F53), U.S. Nudear Ra!JJiatary Comnilssiln, Wllhlnglon, DC 20555-0001, at by lnlemlt e-mal 10 lnlacollcls.Rulul:tGnrc.gov, and 1o !lie Oeak Ollcer, Offtce ol lnilnnlllon and EXAMINATION DATA RlgiJPXy Man. NEOB-10202, (3150-0131), Ollce ol Mlnlglmllllend Budge~ Wlllilg'al\
OC 20503. If a RWBI1I USid kl inpose an 1n1onn1t1on ajedjon does not display a C~m~~Vy vald OMB CCII1IIol runbw,lhe NR(: rney nat conduct or spana, and 1 Plf8Cn It ncll1qcinld lo IISpOnd Ill, the lnfcllmation collc:tion.
FACILITY IJIRC REGIOI'r Oyster Creek Nuclear Generating Station Region I Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-2 t 9 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015 CY2016 CY2017 CY2018 LICENSEE-PREPARED 0 I 0 0 EXAMINATIONS ESTIMATED NUMBER OF NRC..PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY2015 CY2016 CY2017 CY2018 OPERATORS 0 6 0 0 NUMSER OF SENIOR REACTOR OPERATORS* INSTANT 0 4 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 0 NUMBER OF SENIOR REACTOR OPERATORS *LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 5/16/2016 ALTERNATE DATE 5/12/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2015 JUNE SEPTEMBER DECEMBER MARCH JUNE CY 2016 SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FOilM 530 (Q8.2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 8 Page 1 of 1 NRCFORM538 U. 8. NUCLEAR REGULATORY COMMISSION APPROVED BY OIUB: NO. 3110.0131 EXPIRE~ 08130/2014 (011-2011)
Esllm*d burden per I8SpOnS8 to COJ1'4IIy wifl this wluntary lnlormabl colllcfoo r&qUIISI: 1 huur. This lnformallon c:oiKtlan Is used to p111 llldgeb and Jeii01miS lar aperuiOr examlnalfons. Setld comments l'lgardng burden esllm* to lh8 lnlonnallon S.Mc8s Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Reguiala!Y ColrmlsPI11, Washt!Qioll. DC 20555-0001, or by Internet a-EXAMINATION DATA mall to lntx:olacls.Rtsoun:egm:.gov, and lo lh8 Desk Olllcer, Ollc:e 01 lnformallon and RegulalaiY Alfail, NEOB-10202. {315(1.{)131), Oftlce 01 Maleglment and Budget. Waahll1glon.
DC 20503. If a means used to Impose llllnlormellon ODidon dcel ~ display 1 CUI!enlly vald OWl ClliWIII number, tie NRC mar not conduct ar sponsor, and
- person Is not requild 10 respond ID, lhtlnlormaton c:clleclton.
FACILITY NKI.OKI:UIUN Peach Bottom Atomic Power Station, Units 2 and 3 I Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015 CY2016 CY2017 CY2018 LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR CY201S CY2016 CY2017
- CY2018 OPERATORS 6 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 7 0 7 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 0 3 0 NUMBER OF SENIOR REACTOR OPERATORS* LIMITEO *see LOS *see LOS
- see LOS
- see LOS PROPOSED DATES PRIMARY DATE 03/23/2015 N/A 03/20/2017 N/A ALTERNATE DATE 03/30/2015 N/A 03/27/2013 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 13 0 0 0 0 0 CANDIDATES NRC FORM 5311 (Q8.2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment9 Page 1 of 1 NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3150*0131 EXPIRES: 09/30/2014 (09*2011)
Estimated burden per response to comply wilh this voluntary information coijection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resoun:es for operator examnations. Send comments regarding burden estimate to the Information Services Brooch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet&-
mall to lnfocoHects.Resoun:e@nn:.gov, and to the Desk Ofllcer, Office of Information and EXAMINATION DATA Regulalory Affairs. NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently vaHd OMB control number, lhe NRC may not conduct or sponsor, and a person Is not required to respond to, lhe information collection.
FACILITY NRC REGION Quad Cities Nuclear Power Station, Units I and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 Ill NRC Docket Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015
- CY2016
- CY2017 CY2018 LICENSEE-PREPAREO 0 l 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL. OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY2016 CY2017 CY2018 NUMBER OF REACTOR OPERATORS 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 8/1/16 N/A 8/6/18 ALTERNATE DATE N/A 9/6/16 N/A 9/4/18 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2015 CY 2016 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF II 0 0 0 0 0 0 0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2013-06 Attachment 10 Page 1 of 1 NRCFORM638 U.S. NUCLEAR REGULATORY COMMISSION APPROVID BY OMS: NO. 31&0..0131 EXPIRES: 0113012014 (QII.2011)
Esllmalad bunlln per rnponst 10 comply wilh 11111 voluntary lniOIIIIIIion oollacllan raqmt 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thill lnlonnalon collecllon II Ullld Ill plan budgata ll1d riiSOUit8l lor ope!IIIDr txamlnalions. Stnd commtnll f898rding lxlrden llllimMIIO 1he lnlonnafoll Servlaea Bnn:h OPERATOR LICENSING (T-5 F53), U.S. Nude* RaQulaloly Commlalon, Washington, DC 20555-0001, or by lnllmel"'
EXAMINATION DATA mal ro lnfocolacta.ReiCIUIC8Qnrc.gov, and to lht Desk Oflfcer, Oflioe ol lnlormllllon and Ragdalaly A1faira, NEOB-10202, (3150-Q131), Olb ot Managemllll and Budget. Wlslmgllln, DC 20503. ~ a means used lo Impost an lnbmlllon ccleclion does not dilplay e c:unenUy valid OMB control nurnblr, lhe NRC rna, not ooncilct or IIJONO!, and a per10n Is not reqJfred to I1SpOIId tv, the lnilnnllllon collldlon.
FACILITY rNRc ............
Three Mile Island Nuclear Station, Unit 1 I Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2015 CY2016 CY2017 CY2018 LICENSEE-PREPARED I 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS
. ******* CY20U *-*** .
- - . CY:iofif
- PROPOSED NUMBER CY2015 CY2016 NUMBER OF REACTOR OPERATORS 4 0 s 0 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 9 0 10 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 1 0 I 0 NUMBER OF SENIOR REACTOR OPERATORS- UMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 10/12/2015 05/2212017 ALTERNATE DATE 11/09/2015 06/12/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 14 15 CANDIDATES NRCFORM538 (09-20111
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 June 7, 2013 NRC REGULATORY ISSUE
SUMMARY
2013-06 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS ADDRESSEES All holders of or applicants for a power reactor operating license or construction permit under Title 10 of the Code of Federal Regulations (10 CFR) Part 50, "Domestic Licensing of Production and Utilization Facilities," except those that have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.
All holders of, or applicants for, a power reactor early site permit or a combined license under 10 CFR Part 52, "Licenses, Certifications, and Approvals for Nuclear Power Plants."
INTENT The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS) to inform addressees of the NRC staff's need for updated information on projected site-specific operator licensing examination schedules, as well as on the estimated number of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs). This information will help the NRC to use its resources more effectively.
This RIS requires no action or written response on the part of addressees. Addressee actions to collect and transmit the information requested are strictly voluntary.
BACKGROUND INFORMATION Subpart E, "Written Examinations and Operating Tests," of 10 CFR Part 55, "Operators' Licenses," contains the relevant NRC regulations. In particular, 10 CFR 55.40, "Implementation," permits nuclear power reactor facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41, 'Written Examination: Operators," and 10 CFR 55.43, 'Written Examination: Senior Operators," subject to certain conditions. Under 10 CFR 55.40, facility licensees may also prepare the NRC-administered operating tests required by 10 CFR 55.45, "Operating Tests." Under 10 CFR 55.40(c), facility licensees that choose not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examinations and operating tests.
In RIS 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012, the NRC asked power reactor licensees to voluntarily submit proposed schedules of examinations they intended to prepare and to estimate the number of applicants to be tested for onsite examinations and GFEs in calendar years (CYs) 2014 through 2017. This RIS requests that licensees voluntarily update examination schedules and applicant estimates for CYs 2015 through 2018.
RIS 2013-06 Page 2 of 4
SUMMARY
OF THE ISSUE The NRC uses nearly twice as many resources to prepare an examination as to review, approve, administer, and document a licensee prepared examination. The number of examinations administered by licensees fluctuates annually. Consequently, the NRC has found it helpful to request an annual update of the operator licensing examination needs of power reactor facility licensees. Moreover, with the anticipated number of new operator positions that will need to be filled for new plants, the differences in upcoming years could be significant.
Therefore, the NRC requests that licensees evaluate their response to this RIS in this light, particularly for the later years. The update should include an estimate of the number of applicants to be examined and should indicate if the licensee or the NRC will prepare the exam.
In their responses, those utilities not planning to construct a new plant should consider the impact of licensed operators moving between utilities to fill the anticipated openings in the future. This information will help the NRC budget its resources. The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.
The NRC requests that each licensee provide the following information using NRC Form 536, "Operator Licensing Examination Data." (NRC Form 536 is available on the NRC Web site at http://www. nrc.gov/read ing -rm/doc-collections/forms/. ):
A. Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and the number of examinations you will request the NRC to prepare during CYs 2015 through 2018. For examinations that facility licensees will prepare, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless the licensee specifies otherwise.
Joint NRC and licensee examination development is permitted and should be coordinated with the NRC regional office. You should notify the applicable NRC regional office, by letter, of any required schedule changes that arise after submission of your RIS response for agreement to, and coordination of, changes to examination administration.
B. Initial Operator License Examinations For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of the examination. If you are requesting more than one examination perCY, fill in the applicable columns as appropriate through CY 2018.
C. Proposed Generic Fundamentals Examination Schedule Estimate by month the number of applicants who plan to take the GFE in CYs 2015 and 2016.
As the industry has requested, the NRC now administers the GFE four times per year.
VOLUNTARY RESPONSE The NRC asks addressees choosing to submit the information requested in NRC Form 536 to do so within 30 days of receiving this RIS. Direct your response to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, and send a copy of the response to the applicable regional office. You may submit responses electronically.
RIS 2013-06 Page 3 of 4 BACKFITTING AND ISSUE FINALITY DISCUSSION This RIS requires no action or written response. Any action on the part of addressees to collect and transmit operator licensing examination data in accordance with the request contained in this RIS is strictly voluntary and, therefore, is not a backfit under 10 CFR 50.109, "Backfitting."
Consequently, the NRC staff did not perform a backfit analysis.
FEDERAL REGISTER NOTIFICATION The NRC did not publish in the Federal Register a notice of opportunity for public comment on this RIS because it pertains to an administrative aspect of the regulatory process that involves the voluntary submission of information on the part of addressees.
CONGRESSIONAL REVIEW ACT This RIS is not a rule as designated by the Congressional Review Act (5 U.S.C. §§ 801-808) and, therefore, is not subject to the Act.
PAPERWORK REDUCTION ACT STATEMENT This RIS contains and references information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Theses information collection requirements were approved by the Office of Management and Budget, approval numbers 3150-0018 and 3150-0131.
PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid OMB control number.
CONTACT Please direct any questions about this matter to the technical contacts listed below.
IRA/ IRA S. Bahadur Acting for/
Laura A. Dudes, Director Lawrence E. Kokajko, Director Division of Construction, Division of Policy and Rulemaking Inspections and Operational Programs Office of Nuclear Reactor Regulation Office of New Reactors
RIS 2013-06 Page 4 of 4 Technical Contacts: John McHale, NRR Michael Junge, NRO 301-415-3254 301-415-7745 E-mail: john.mchale@nrc.gov E-mail: michael.junge@nrc.gov Donald Jackson, Rl Malcolm Widmann, Rll 61 0-337-5306 404-997-4550 E-mail: donald.jackson@nrc.gov E-mail: malcolm. widmann@nrc.gov Hironori Peterson, Rill Mark Franke, Rll 630-829-9707 404-997-4436 E-mail: hironori.peterson@nrc.gov E-mail: mark.franke@nrc.gov Vincent Gaddy, RIV 817-200-1159 E-mail: vincent.gaddy@nrc.gov
RIS 2013-06 Page 4 of 4 Technical Contacts: Jo hn McHale, NRR Michael Junge, NRO 30 1-415-3254 301-415-7745 E-mail: john.mchale@nrc.gov E-mail: michael.junge@nrc.gov Do nald Jackson, Rl Malcolm Widmann, Rll 61 0-337-5306 404-997-4550 E-mail: donald.jackson@nrc.gov E-mail: malcolm.widmann@nrc.gov Hi ronori Peterson, Rill Mark Franke, Rll 63 0-829-9707 404-997-4436 E-mail: hironori.peterson@nrc.gov E-mail: mark.franke@nrc.gov Vi ncent Gaddy, RIV 81 7-200-1159 E-mail: vincent.gaddy@nrc.gov ADAMS ACCESSION N0.: ML13098A074 T AC MF1621
- concurrence by e-mail OFFICE OLA:IOLB: TECH. C:IOLB:DIRS DD:DIRS C:COLP:DCIP: D:DCIP:NRO DIRS EDITOR NRO NAME CRevelle QTE
- JMcHale
- AHowe
- MJunge
- LDudes
- DATE 04/08/2013 04/17/2013 05/01/13 05/06/13 04/30/2013 05/02/2013 OFFICE OE OGC (NLO) PMDA OIS LA:PGCB:DPR PM: PGCB:DPR NAME GGulla
- LSubin
- LHill
- TDonnell
- CHawes
- SStuchell DATE 05/02/2013 05/14/2013 05/01/13 05/06/13 5/10/13 5/16/13 OFFICE C:PGCB:DPR D:DPR NAME EBowman for DPelton
- LKokajko
/RA S. Bahadur Acting for/