RS-12-114, (EGC) - Response to NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
| ML12187A682 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane |
| Issue date: | 07/05/2012 |
| From: | Gullott D Exelon Generation Co |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| RS-12-114 | |
| Download: ML12187A682 (13) | |
Text
4300 Winfield Road
'.4 rrenv lie. U60555 Exeton Generation.
RS-12-114 July 5, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units I and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 630 657 2000 Office
July 5, 2012 U. S. Nuclear Regulatory Commission Page 2
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2012-07, "Preparation and Scheduling of Operator Licensing Examinations," dated June 8, 2012 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2014 through 2017, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2014 and 2015. Attachments 1 through 11 provide responses to RIS 2012-07 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
In calendar year 2016, six candidates are expected to take the dual-site Limited Senior Reactor Operator (LSRO) initial license examination as indicated on Attachment 7. The schedule for the indicated examination is as follows: the written examination and a portion of the operating examination will be given at Limerick Generating Station (LGS); the remainder of the operating examination will be completed at Peach Bottom Atomic Power Station (PBAPS). Since the LSRO examination is a dual-site examination that involves LGS and PBAPS, rather than repeating the same information on both attachments, the examination scheduling information is provided on Attachment 7 for LGS. Attachment 9 for PBAPS references Attachment 7 where appropriate.
There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.
David M. Gullott Manager - Licensing Exelon Generation Company, LLC - Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Clinton Power Station - Completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - ILT - Completed NRC Form 536 for Limerick Generating Station - LSRO - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station - Completed NRC Form 536 for Peach Bottom Atomic Power Station 0 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 1 - Completed NRC Form 536 for Three Mile Island Nuclear Station
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Attachment I Page 1 of I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150 -0131 EXPIRES: 09130)2014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection rs used to plan budgets and resources for operator OPERATOR LICENSING ezamna ons. Send commends regartAng tun en estimate to the information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission. Washington, DC 20555.0001, or by ite net e-EXAMINATION DATA mall to Infecdlects.ResourceCrvcgov. and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150.0131), Office of Management and Budget, Wash ngton, DC 20503.
It a means used to impose an information collection does not display a currently void OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
FACILITY Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 II NRC Docket Nos. STN 50-456 and STN 50-457 IA. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS S. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY2015 Cy 2016 CY 2017 0
0 1
0 0
0 0
6 6
0 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE N/A 01/05/2015 11/07/2016 N/A ALTERNATE DATE N/A 01/26/2015 1
10/24/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE ESTIMATED NUMBER OF 0
CANDIDATES 0
0 10 0
0 6
0 0
0 0
0 PROPOSED NUMBER MARCH JUNE ISEPTEMBEF DECEMBERI MARCH CY 2014 CY 2015 0
1 0
1 0
0 1
12 JUNE ISEPTEMBERI DECEMBER CIRC FORM 536 (92011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (9-2011)
OPERATOR LICENSING EXAMINATION DATA FACILITY Byron Station, Units I and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information confection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commissar, Washington, DC 20555-0001, or by internet a-mati to InfbwRecis.Resou rxc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Wasttington, 20503.
if a means used to impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to end to, the information r ecton.
N GtON II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS S. INITIAL OPERATOR LICENSE EMINATIONS PROPOSED NUMBER CY 2014 Cy 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 06/02/14 - 06/13/14 08/17/15 - 08/28/15 N/A 06/19/17 - 06/30/17 ALTERNATE DATE 06/16/14 - 06/27/14 08/31/15 - 09/11/15 N/A 07/031/17 - 07/ 14/ 17 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1
0 1
0 0
0 0
6 9
I 0
4 7
1 0
0 0
0 0
7 1
0 Cy 2014 Cy 2015 JUNE PROPOSED NUMBER MARCH SEPTEMBER DECEMBER MARCH SEPTEMBER DECEMBER JUNE 0
ESTIMATED NUMBER OF CANDIDATES 11 0
0 0
0 0
15 NRC FORM 536 (9-20111
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (4.2411)
OPERATOR LICENSING EXAMINATION DATA FACIUTY Clinton Power Station Facility Operating License No. NPF-62 NRC Docket No. 50-461 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 0913012014 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resouncas for operator examinations.
Send comments regarding burden estimate to the Information Services Brame (T-5153), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mail to InfocoNects.ResourceQrvc gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150.0131), Office of Management and Budget Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information comedian.
C REGION I11 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS 1
0 0
0 0
CY2014 0
0 CY 2015 4
6 CY 2016 0
0 CY 2017 6
6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES 0
0 4
0 0
0 2
0 03/16/2015 03/23/2015 02/21/2017 02/27/2017 N/A N/A N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE MARCH SEPTEMBER DECEMBER MARCH SEPTEMBER DECEMBER JUNE JUNE CY 2015 CY 2014 ESTIMATED NUMBER OF 10 CANDIDATES 0
1 0
1 0
1 0
1 0
1 12 NRC FORM 536 (9.2611)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION JAPPROVE_D BY OMB: No. 3150.0131 EXPIRES: 0913012014 (9-2011)
Estimated burden per response to comply with this voluntary information collection request: I tour.
This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the information Services Branch OPERATOR LICENSING (T-5 F53). U.S. Nuclear Regulatory commission, Washington, DC 20555-0001, or by Internet a-EXAMINATION DATA mail to Infocoif
.Resource nrc.gov, and to the Desk Officer, ice of Information a Regulatory Affairs, NE03.10202, (3150.0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a c urrently vat OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infomatlo n collection.
FACILrrY Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERI PROPOSED NUMBER MARCH N CRE _10- N III B. INITIAL OPERATOR LICENSE EINATIONS C FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2014 CY 2015 JUNE CY 2014 0
0 0
0 N/A N/A CY2014 CY2015 1
0 0
0 SEPTEMBER DECEMBER CY2015 6
5 0
03102/2015 03/23/2015 MARCH I JUNE ISEPTEMBER! DECEMBER CY2016 1
0 CY 2016 4
7 0
08/08/2016 08/22/2016 CY2017 ESTIMATED NUMBER OF CANDIDATES 0
1 0
1 0
1 0
0 1
0 0
12 NRC FORM 536 (9-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09130/2014 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to Man budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (r-5 F53), US. Nuclear Regulatory Commission, Washington, DC 205550001, or by internet a*
mail to knfocdlects.Rescurce nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to moose an informed on collection does not display a currently va ld 0MB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
r^t^,R c9oty Iii NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (9-2011)
OPERATOR LICENSING EXAMINATION DATA FACILITY LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. STN 50-373 and 50-374 A. PROPOSED EXAMINATION PREPA RATION SCHEDULE CY 2016 0
CY 2016 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS CY2014 CY 2015 0
ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS PROPOSED NUMBER 0
CY 2014 0
E. INITIAL OPERATOR LICENSE EXAMINATIONS CY2015 7
5 i
0 10/11/2016 10/17/2016 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PRIMARY DATE ALTERNATE DATE 5
0 4
0 3
0 0
10/14/2014 10/20/2014 PROPOSED DATES 0
N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2014 ESTIMATED NUMBER OF 0
CANDIDATES NRC FORM 536 (9.2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of I NRC FORM 538 U.S. NUCLEAR REGULATORY COMMISSION 19-2011)
OPERATOR LICENSING EXAMINATION DATA FACILITY Limerick Generating Station, Units I and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 APPROVED BY OMB: No. 3150.4131 EXPIRES: 0913012014 Estimated burden per response to comply with this voluntary information collection request 1 This infomation collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DO 20555-0001, or by hdemet a-mail to tnfacaiects.Resource@nm.gov, and to the Desk officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information co llection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to to, the utfmmation collection.
CAP-010 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY2017 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 10/06/2014 N/A 10/03/2016 N/A ALTERNATE DATE 10/14/2014 N/A 10/11/2016 N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 1
CY 2015 MARCH JUNE SEPTEMBEF DECEMBER I
MARCH 1
JUNE
,SEPTEMBEF DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
14 0
0 CANDIDATES 1
0 0
1 0
0 0
0 6
10 4
0 0
0 0
8 6
2 0
0 0
0 0
PROPOSED NUMBER NRC FORM 536 (9-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (9-2011)
OPERATOR LICENSING EXAMINATION DATA FACILITY Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 04/3012014 Estimated burden per response to comply with this voluntary information collection request t hour.
This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to t e Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Caomission, Washingkun, DC 20555-0001, or by Internet e-mail to krfuedlects.Reso
.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Ofte of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid t control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information t ollection.
NRC REGION I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS S. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE N/A N/A I
07/25/2016 N/A ESTIMATED NUMBER OF 0
0 0
0 0
0 CANDIDATES 0
0 0
0 0
0 0
0 0
N/A 0
0 0
0 N/A 0
0 0
6 07/18/2016 N/A 0
0 0
0 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 PROPOSED NUMBER MARCH JUNE SEPTEMBER) DECEMBER MARCH JUNE SEPTEMBER CV 2015 0
I 0
1
RttaCnment i Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION 'APPROVED BY OMS: NO. 3150 -0131 EXPIRES: 0 913 0/2 01 4 (9-2011}
OPERATOR LICENSING EXAMINATION DATA WNWAMAWNWANOWROMPOW FACILITY Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This Information resection is used to an budgets and resources for operator examinations.
Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mati to lnfacolects.Resou
,gav, and to the Desk Officer, Office of Information and Regulatory Affairs, fEo&10202, (3150-0131), Office of Management and Budget Washington, DC 201503.
If a means used to impose an information collection does not display a currently valid 0Ma control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GEE) SCHEDULE I
0 0
0 0
0 0
0 4
2 2
0 0
0 0
0 0
0 0
0 0
0 0
0 05/19/2014 06/02/2014 N/A N/A N/A N/A N/A N/A CY 2014 CY 2015 JUNE PROPOSED NUMBER MARCH SEPTEMBER, DECEMBER MARCH SEPTEMBER DECEMBER JUNE 0
ESTIMATED NUMBER OF CANDIDATES 0
0 0
0 0
0 hlRC FORM 536 (92011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (9-2011)
OPERATOR LICENSING EXAMINATION DATA FACILITY Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 APPROVED BY OMB: NO. 3150.0131 EXPIRES: 09130/2014 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Infonnatton Series Branch (T-5 F53), U.S. Nuclear Regulatory commission, Washington, DC 20555.0001, or by Internet e-mat to tnfocokcts.Resource@nre.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202. (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collect ion does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
NRC RE t N I
A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES C. PROPOSED GENERIC FUNDAMENTALS E XAMINATION (GFE) SCHEDULE PROPOSED CY 2014 CY 2015 NUMBER ESTIMATED NUMBER OF CANDIDATES NRC FORM 53e (9-2011)
CY2014 CY2016 CY2015 CY 2017 1
0 0
0 0
PRIMARY DATE ALTERNATE DATE 0
6 0
- See LGS 03/23/2015 03/30/2015 2
e N/A N/A 0
0 0
N/A N/A 3
ARCH JUNE SEPTEMBER DECEMBER MARCH 0
0 0
0 JUNE 0
SEPTEMBER
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 0 Page 1 of I NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (9-2011)
OPERATOR LICENSING EXAMINATION DATA FACtUTY Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 APPROVED BY OMB: NO. 3150-0131 EXPIRES: 081301`2014 Estanated burden per response to comply with this voluntary Information collection request: 1 hay.
This Information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch (17-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by urternet a-mati to nfocdtcis.Resource@nre.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, fEOB-10202, (3150.0131), Office of Management and Budget, Washington, DC 20503, If a means used to Impose an nfarmabon collection does not display a nmently valid 0M6 control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the nfamation collection, RC R III A. PROPOSED EXAMINATION PREPA RATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B.
INITIAL OPERATOR LICENSE EXAMINATIONS 1
0 1
0 0
0 0
0 CY 2015 0
0 0
N/A N/A PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY2014 04/21/2014 05/19/2014 Cy 2016 04/25/2016 05/23/2016 5
5 0
0 5
5 0
0 CY 2017 0
0 0
0 N/A N/A C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE Cy 2014 JUNE PROPOSED NUMBER MARCH SEPTEMBER DECEMBER MARCH SEPTEMBER ECEMBER Cy 20 JUNE 0
ESTIMATED NUMBER OF CANDIDATES 0
0 0
10 0
0 0
NRC FORM 536 (9-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2012-07 1 Page 1 of 1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (9-2011)
OPERATOR LICENSING EXAMINATION DATA FACtt.trY Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 APPROVED BY OMB: NO. 31504131 EXPIRES: 09130/2014 Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the information Services Branch (T-5 F53). U,S. Nuclear Regulatory Co emission, Washington, DC 20555.0001, of by Internet e-mail to Infocollarts.Resaurca rwc,gov, and to the Desk Officer, Office of information and Regulatory Atfahs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently vat OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
NRC tent A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY 2015 CY 2016 CY 2017 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSE EINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY2016 CY2017 NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02/10/2014 08/17/2015 N/A 08/21/2017 ALTERNATE DATE 04/07/2014 1
09/14/2015 1
N/A 1
09/11/2017 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 1
0 1
0 1
0 4
8 0
0 4
9 0
0 0
0 0
5 0
0 CY 2014 MARCH JUNE ISEPTEMBERI DECEMBER ESTIMATED CANDIDATES NUMBER OF 12 0
0 0
CY 2015 MARCH I
JUNE ISEPTEMBERI DECEMBER PROPOSED NUMBER 0
1 0
1 0
NRC FORM 536 (9.20111