RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations
| ML14149A238 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Oyster Creek, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, LaSalle, Crane |
| Issue date: | 05/29/2014 |
| From: | Gullott D Exelon Generation Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RS-14-164 | |
| Download: ML14149A238 (17) | |
Text
RS-14-164 May 29, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 Byron Station, Units 1 and 2 Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 Calvert Cliffs Nuclear Power Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 Limerick Generating Station, Units 1 and 2 Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 NRC Docket Nos. 50-220 and 50-41 O Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
May 29, 2014 U. S. Nuclear Regulatory Commission Page2 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254 and 50-265 R. E. Ginna Nuclear Power Plant Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 Three Mile Island Nuclear Station, Unit 1 Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289
Subject:
Exelon Generation Company, LLC (EGC) Response to NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
NRC Regulatory Issue Summary 2014-05, "Preparation and Scheduling of Operator Licensing Examinations," dated April 29, 2014 The referenced Regulatory Issue Summary (RIS) requested that facility licensees provide a proposed schedule of operator licensing examinations and an estimate of the number of candidates requiring initial operator license examinations for calendar years 2016 through 2019, and the number of candidates requiring Generic Fundamentals Examinations for calendar years 2016 and 2017. Attachments 1 through 14 provide responses to RIS 2014-05 for the EGC plants identified above. The requested information for each facility is provided on a separate NRC Form 536.
For Limerick Generating Station (LGS) and Peach Bottom Atomic Power Station (PBAPS), the Limited Senior Reactor Operator (LSRO) initial license examination can be a dual-site examination which involves both stations. In lieu of repeating the same information on LGS and PBAPS attachments, the LSRO examination scheduling information is provided on Attachment 7 for LGS. Attachment 11 for PBAPS references Attachment 7 where appropriate. There are no candidates currently expected to take the dual-site LSRO initial license examination for calendar years 2016 through 2019, as indicated on Attachment 7.
May 29, 2014 U. S. Nuclear Regulatory Commission Page 3 There are no regulatory commitments contained within this letter. Should you have any questions regarding this letter, please contact Dwi Murray at (630) 657-3695.
Respectfully,
~--r/jV;~-~~
David M. Gullott Manager - Licensing Exelon Generation Company, LLC cc:
Regional Administrator - NRC Region I Regional Administrator - NRC Region Ill -Completed NRC Form 536 for Braidwood Station - Completed NRC Form 536 for Byron Station - Completed NRC Form 536 for Calvert Cliffs Nuclear Power Station - Completed NRC Form 536 for Clinton Power Station -*completed NRC Form 536 for Dresden Nuclear Power Station - Completed NRC Form 536 for LaSalle County Station - Completed NRC Form 536 for Limerick Generating Station - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 1 - Completed NRC Form 536 for Nine Mile Point Nuclear Station - Unit 2 O - Completed NRC Form 536 for Oyster Creek Nuclear Generating Station 1 - Completed NRC Form 536 for Peach Bottom Atomic Power Station 2 - Completed NRC Form 536 for Quad Cities Nuclear Power Station 3-Completed NRC Form 536 for R.E. Ginna Nuclear Power Plant 4 - Completed NRC Form 536 for Three Mile Island Nuclear Station
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information coffection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator OPERATOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e*
EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information coffection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGION Braidwood Station, Units 1 and 2 III Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456 and STN 50-457 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED l
0 l
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8
0 10 0
OPERATORS NUMBER OF SENIOR REACTOR 8
0 8
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
0 2
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 91512016 NIA 511412018 NIA ALTERNATE DATE 911212016 NIA 5121/2018 NIA
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 20 0
0 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Off1Cer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGION Byron Station, Units I and 2 III Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. STN 50-454 and STN 50-455 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
I 0
I EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 6
8 0
7 OPERATORS NUMBER OF SENIOR REACTOR 6
7 0
7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR I
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 0311412016 12111/2017 NIA 1010612019 ALTERNATE DATE 0312112016 1211812017 NIA 1012012019
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
15 0
0 0
0 0
0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRCFORM636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgels and resources for operator OPERA TOR LICENSING examinations. Send commenls regarding burden estimate to the Information SelVices Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollecls.Resource@nro.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.
If a means used to impose an information colection does not display a currently valid OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGION Calvert Cliffs Nuclear Power Plant, Units 1 and 2 I
Renewed Facility Operating License Nos. DPR-53 and DPR-69 NRC Docket Nos. 50-317 and 50-318 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 I
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 5
0 5
0 OPERATORS NUMBER OF SENIOR REACTOR 6
0 6
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 3
0 3
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 0810812016 NIA 0810612018 NIA ALTERNATE DATE 0911212016 NIA 0911012018 NIA
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
11 0
0 0
0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coffection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocoHects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRG REGION Clinton Power Station, Unit I III Facility Operating License No. NPF-62 NRC Docket No. 50-461 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 4
0 4
0 OPERATORS NUMBER OF SENIOR REACTOR 6
0 6
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 2
0 2
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DA TES PRIMARY DATE 1011012016 NIA 1012212018 NIA ALTERNATE DATE 1011712016 NIA 1012912018 NIA
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
0 IO 0
CANDIDATES NRG FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRC FORM 636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coRection is used to plan budgets and resources for oparator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission. Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocoNects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washington, DC 20503.
If a means used to impose an information coRection does not display a currentiy vaNd OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.
FACILITY NRCREGION Dresden Nuclear Power Station, Units 2 and 3 III Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0
2 0
3 OPERATORS NUMBER OF SENIOR REACTOR 8
10 0
6 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 08/08/2016 08/28/2017 NIA 0312512019 ALTERNATE DATE 0811512016 08121/2017 NIA 0410112019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 0
0 0
0 0
9 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information coUection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coHection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch
{T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information coHection does not display a currenUy valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information coNection.
FACILITY NRCREGION LaSalle County Station, Units 1 and 2 III Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 10 0
10 0
OPERATORS NUMBER OF SENIOR REACTOR 9
0 9
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1
0 1
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 1011712016 NIA 1011512018 NIA ALTERNATE DATE 1012412016 NIA 1012212018 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
19 0
0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1 of 1 NRCFORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budge~ Washing1on, DC 20503.
If a means used to impose an information colection does not display a currently vaNd OM8 control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
FACILITY NRCREGION Limerick Generating Station, Units 1 and 2 I
Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 8
7 8
6 OPERATORS NUMBER OF SENIOR REACTOR 5
5 5
5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1
2 2
2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 01/18/2016 02/06/2017 02/05/2018 02/04/2019 ALTERNATE DATE 01/25/2016 02/13/2017 02/12/2018 02/1112019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 13 0
0 0
11 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRCFORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coHection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53). U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of lnfomiation and Regulatory Affairs, NEOB-10202, (3150..0131), Office of Management and Budget Washington, DC 20503.
If a means used to impose an infomiation coHection does not display a currenlly vafid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infomiation collection.
FACILITY NRC REGION Nine Mile Point Nuclear Station, Unit 1 I
Renewed Facility Operating License No. DPR-63 NRC Docket No. 50-220 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0
8 0
8 OPERATORS NUMBER OF SENIOR REACTOR 0
IO 0
10 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE NIA 0310612017 NIA 0310412019 ALTERNATE DATE NIA 0311312017 NIA 0311112019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
0 18 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 Page 1of1 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGION Nine Mile Point Nuclear Station, Unit 2 I
Renewed Facility Operating License No. NPF-69 NRC Docket No. 50-410 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0
0 8
0 OPERATORS NUMBER OF SENIOR REACTOR 0
0 10 0
OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NIA NIA 0310512018 NIA ALTERNATE DATE NIA NIA 0311212018 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 18 0
0 0
0 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 0 Page 1 of 1 NRCFORM636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information coHection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coHection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate lo the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150..0131), Office of Management and BudgeL Washington, DC 20503.
If a means used to impose an information coRection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, !he informafion collection.
FACILITY NRCREGION Oyster Creek Nuclear Generating Station I
Renewed Facility Operating License No. DPR-16 NRC Docket No. 50-219 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 0
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 5
0 0
0 OPERATORS NUMBER OF SENIOR REACTOR 8
0 0
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 5
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 02101/2016 NIA NIA NIA ALTERNATE DATE 0210812016 NIA NIA NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
0 0
0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 1 Page 1of1 NRCFORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160*0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coHection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget Washington, DC 20503.
If a means used to impose an information coHection does not display a currently vaHd OMB control number, the NRG may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRCREGION Peach Bottom Atomic Power Station, Units 2 and 3 I
Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
1 0
1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS
- 8. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0
6 0
6 OPERATORS NUMBER OF SENIOR REACTOR 0
7 0
7 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
3 0
3 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR
- see LGS
- see LGS
- see LGS
- see LGS OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE NIA 0312012017 NIA 0312512019 ALTERNATE DATE NIA 0312712017 NIA 04101/2019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
0 13 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 2 Page 1of1 NRCFORM 636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coNection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollecfs.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131 ), Office of Management and Budge~ Washington, DC 20503.
If a means used to impose an information coftection does not display a currentiy vafid OMB control number, the NRG may not conduct or sponsor, and a pB1Son is not required to respond to, the information collection.
FACILITY NRCREGION Quad Cities Nuclear Power Station, Units I and 2 III Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Dockets Nos. 50-254 and 50-265 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 3
0 4
0 OPERATORS NUMBER OF SENIOR REACTOR 7
0 8
0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERA TORS - LIMITED PROPOSED DATES PRIMARY DATE 0412512016 NIA 0812012018 NIA ALTERNATE DATE 0810112016 NIA 09/1712018 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 12 0
0 0
CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 3 Page 1 of 1 NRCFORM636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information coNection is used to plan budgets and resouroes for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nro.gov. and to the Desk Officer. Office of lnfonnation and Regulatory Affairs. NEOB-10202, (3150-0131). Office of Management and Budge~ Washington, DC 20503.
If a means used to impose an infonnation colection does not display a currenHy vaNd OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the infonnation collection.
FACILITY NRCREGION R. E. Ginna Nuclear Power Plant I
Renewed Facility Operating License No. DPR-18 NRC Docket No. 50-244 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 1
0 1
0 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 10 0
8 0
OPERATORS NUMBER OF SENIOR REACTOR 1
0 3
0 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 3
0 3
0 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 1210512016 NIA 1210312018 NIA ALTERNATE DATE 1211212016 NIA 1211012018 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
0 0
0 0
11 0
0 CANDIDATES NRC FORM 536 (09-2011)
Exelon Generation Company, LLC Response to Regulatory Issue Summary 2014-05 4 Page 1 of 1 NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 09/30/2014 (09-2011)
Estimated burden per response to comply with this voluntary information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
This information collection is used to plan budgets and resources for operator OPERA TOR LICENSING examinations. Send comments regarding burden estimate to the Information Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-EXAMINATION DATA mail to lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information colection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond lo, the information collection.
FACILITY NRCREGION Three Mile Island Nuclear Station, Unit 1 I
Renewed Facility Operating License No. DPR-50 NRC Docket No. 50-289 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 ESTIMATED NUMBER OF LICENSEE-PREPARED 0
9 0
12 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0
0 0
0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2016 CY2017 CY2018 CY2019 NUMBER OF REACTOR 0
3 0
6 OPERATORS NUMBER OF SENIOR REACTOR 0
5 0
5 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 0
1 0
1 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE NIA 0912512017 NIA 0912312019 ALTERNATE DATE NIA 1010212017 NIA 0913012019 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2016 CY 2017 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0
8 0
0 0
0 0
0 CANDIDATES NRC FORM 536 (09-2011)