Monthly Operating Rept for May 1988 for Wppss Unit 2. W/880610 Ltr
ML17279B099
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1988
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8806160370
Download: ML17279B099 (6)


Text

ACCRLERATED DIS1'SRUTI ON DEMONSTRAOON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8806160370 DOC.DATE: 88/05/31 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1988 for WNP-2.W/880610 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

'RECIPIENT' 'RECIPIENT '" t ]'"~'. COPIES I l;I ",COPIES i > <

,ID 'ODE/NAME 'LTTR ENCL ID CODE/NAME -

LTTR ENCL PD5 LA 1 0 PD5 PD 5 5 SAMWORTH, R 1 0 A

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 ' NRR/DOEA/EAB 11 1 1 NRR REP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 EG F 01 1 1 RGN5 1 l.

EXTERNAL: EG&G WILLIAMS,S 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 4

TOTAL NUMBER OF COPIES REQUIRED: LTTR 31 ENCL 29

0 ~ ~ I H

f ~

~ ~

r .

OPERATING DATA REPORT WNP-2 01-Jun-88 il. DOCKET: 50-397 REPORTING PERIOD: May-88 OUTAGE + QN-LINE HOURS 744 UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486 LICENSED THERMAL POWER <MWt.): 3323 5 ~ NAMEPLATE RATING <GROSS MWe): 1200.9 0 ~ DESIGN ELECTRICAL RATING <NET MWe): 1100

7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
3. MAXIMUM DEPENDABLE CAPACITY <NET MWe): 1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORT v GIVE REASONS
10. POWER TO WHICH RESTRICTED, IF ANY <NET MWe):

11 REASONS FOR RESTRICTIONS'F ANY MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS ~ 744 3647 30367. 2
13. HOURS REACTOR CRITICAL 0.0 ,2223.2 22130.0
14. RX RESERVE SHTDWN HRS 0.0 0' 340.4
15. HRS GENERATOR ON LINE 0.0 2176.1 21318 0
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381 7
17. GROSS THERMAL ENERGY <MWH) 0 6719698 57102465
18. GROSS ELECTRICAL ENERGY (MWH) 0 2244320 19061460
19. NET ELECTRICAL ENERGY (MWH) 0 2166352 18334304
20. UNIT SERVICE FACTOR 0. 0/ 59.7/ 70.2%
21. UNIT AVAILABILITYFACTOR
22. UNIT CAPACITY FACTOR (MDC NET) 23 UNIT CAPACITY FACTOR (DER NET)
0. 0/
0. 0/
0. 0/
59. 7%

54.2/

54. 0/

'554.

71. 5/

1%

9%

24. UNIT FORCED OUTAGE RATE 0. 0/ 24. 6% 9. 9/
25. FORCED OUTAGE HOURS 0.0 709. 3 2354. 3
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION):
27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

8806160370 880531 gag +

PDR ADOCK 05000307 R DCD ((,

DOCKET NO. 50 397 UNIT t'lAllf WNP-2 DATE 06/07/88 LNIT Sl IUTDONNS / BE'DUCTIONS COMPLETED BY LB HUTCHISON BEKAT. PERIOD MAY 19 88 TELEPllONE (509) 377-2486 mcnth, year HQ. D~K TTTP Fi~n~ ~~7iSSH =

~hf Tm &&I&&&&. && &Y 1EII &&II%I&&&& & & & &&&& & & & &&-V&" "& '&&&&&

88-07 4/30/88 S 744 C =

4  :. RC FUELXX REFUEL OUTAGE CONTINUING SUl t lABY WNP-2 REMAINED SHUTDOWN IN MAY FOR SCHEDULED REFUELING OUTAGE TYPE hlfTHOD SYSTEM k COhlPOM.:NT F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F h H S-Scllcd 0-Maint or Test ~ 0-Oper Error 2-manual Scram Instructions for C-Be fue ling l3-Other 3-Auto Scram Preparation D-Begulatory Bestriction 4-Continued Entry Sheet of'ata f-Operator Training 5-Reduced Load Licensee Event Bepnrt h License Examination 9-Other (LER) File (NUBEG-0161)

4 o"

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

UNIT MHP-2 COMPLETED BY ~0 06/07/88 TELEPHONE (509) 377"2486 MAY 1988 MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) (MWe-Net) 0 0 1 17 18 20 21 0

24 0

12 13 0

INSTRUCTIONS Qn this form, list the average daily unit power level in MVe~Net for each day in the reporting month. Compute to the nearest whole megawatt.

1hese Qgures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity ~s used for the net electrical rating of the- unit, there may be occasions when the daily average power !eve! exceeds the 100% line (or the respected power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the ap parent anomaly.

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 '000 George 1Vashington 1Vay ~ Richland, 1Vashington 99352 June 10, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for May l988 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, C. M. Powers (M/D 927M)

MNP-2 Plant Manager CMP/sl Enclosure cc: Mr. J. B. Martin NRC Region V Mr. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr,. M. H. Lovelace NRC, Washington D.C.