ML17313A135

From kanterella
Revision as of 02:28, 4 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3.W/971208 Ltr
ML17313A135
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/30/1997
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00492-GRO-J, 35-492-GRO-J, NUDOCS 9712170491
Download: ML17313A135 (8)


Text

CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528

, STN-5(,-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Monthly operating repts for Nov 1997 Nuclear ltr. Verde

SUBJECT:

A Generating Station, Units 1,2 5 3. /971208 DISTRIBUTION CODE: IE24D ( ENCL T

COPIES RECEIVED:LTR SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES: STANDARDIZED PLANT 05000528 g Standardized plant. 05000529 Standardized plant. 05000530 p RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 D NRC PDR 1 1 U

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

f, II

j a Palo Verde Nuclear Generating Station 0

Commllmont.rnnovatlmLEneyy.

Gregg R. Overbeck Vice President Nuclear Production TEL 602/3934148 FAX 602I3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 035-00492-8RO/JDF December 8, 1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for NOVEMBER 1997 Enclosed are the Monthly Operating Reports for November-1997, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/clj

Enclosures:

NOVEMBER 1997 Monthly Operating Reports cc: E. W. Merschoff (all w/enclosures)

K. E. Perkins INPO Records Center Utility Data Institute o7<21704oi 97<<>o IIIIIiletlil(tlrllrll)leam ADGCK 05000528,~ r,~

PDR R PDR ~

I NRC MONTHLYOPERATING DATA REPORT I

DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 12/8/97 COMPLETED BY J. D. Fulton TELEPHONE:

Reporting Period: November 1997

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243

'::.!"'.::,Cumu? lative,":..",:;:,';;

3.:H?aiirs?!Reac'ta'r:.::was,'Critical i ÃiiAF'.",.:i::."'4&:::":"'i; i -:::i'::ll:i5: ;':::.l::::-: 720.0 7,927.1 73,252.3 4.::!H?ours':;.Ge'ner?a't?a'rwa's,On"-::L'tile+-::;:.':.'";::">~:.".'::!5g?'::";>lF'~N$ )& 720.0 7,914.6 72,067.1 0.0 0.0 0.0

?@/~?'r?i???i! Py??yiy/gy/?i/,'ll'!?) @Pres??'j?yPyNP/Pi:;::',:? i'??iN-..j::::"'i::.::::::::;:.;:i::::::";:i::::.'y.'.i/?i??jii?::

6. )ge~t:Elect'r'ical,Pljerjy'",,Ge'it'era't?elf:,(@wan).:;:;;::':,.3~<5";:;;i.:,;::~-:::,j53)";.: 900,819 9,803,183 85,268,745 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type" Hours Reason2 Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of November 1997.

F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

~ \ (~

h NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: ~59-5 9 UNIT NAME: PVNGS-2 DATE: 12/8/97 COMPLETED BY J. D. Fulton TELEPHONE:

Reporting Period: November 1997

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 v".5Y.':..':.';5':

,::i':: C'uiiiuhlativ9e':.-.':::":::::.',

9h' 3.::'H'a'u9rsh'".Rhe'i'cta'r"..wish".:'Crhitic5alk':,:::::::;:i':,ik::;:::::.! 720.0 6,948.0 72,681.7 4.

': '/'

':::HSii'rs:;:6erie5ratO.':;

C" h " '4:"' 9 '"' < '4'99 '9G '4%'+'9Y 720.0 6,917.9 71,488.8 0.0 0.0 0.0 NNeVXI9e'c9t9ik'al!E'ne'ig'yi.'G'e'rie're'ed:'t'MNh>l'i:':::k~PP!'i!'.:,:','i':::::.::;:::::".:: 911,570 8,374,653 85,481,545 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type'ours Reason> Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of November 1997.

'F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

t P

4

~ -'*

p, ~k

i NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 12/8/97 COMPLETED BY J. D. Fulton TELEPHONE:

Reporting Period: November 1997

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247
.':.:::.;:;:::::;::::::;:::::::;::::::::::;:::,":::::.:':Unit;'.Q(9e(rtaratlii !Statistics:::i:..::;.':NN~~>';:::.!:,";::::!.;!;'I
.Ha3iirs'
:Rea3c3t3ai':::wa'8!'C3r'iticili";::::::K:;:::,::;:;:::.::;"::,': 720.0 7,124.9 68,581.7 Ho(u'i~:G'e'n'era't'ar'::was'::.Oh-.i." 711.8 7,078.1 67,755.6

'.'.Uiiit::,Res(e(5r've:::.Sh'utd0awn'H'au'r'i::::4!.'!::::::;:::::.,:i'~::.":;:,":iHN)~!ii:.'",I.,.:O;::~.l:,: 0.0 0.0 0.0

.:M~t.::.Ete'c5t5'iic'aYEiiiir'gy.'::~G~iierite'dr(II/II/Cth}PY>::::.":t>Y4~'l"j:: 875,497 8,520,037 81,819,182 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason2 Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of November 1997.

'F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY