Corrects Editorial Errors in 810721 Tech Spec Change Request Re Linear Heat Rate Limits,Radial Peaking Factors & Excore Power Distribution
ML18046A850
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/06/1981
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8108110171
Download: ML18046A850 (1)


Text

....

consume11 Power company Genenil Offices: 212 West Michigan Avenue, Jeckson, Ml 49201 * (617) 788-0650 August 6, 1981

\r nEGf/VED -~~

Director, Nuclear Reactor Regulation -. : l 0 1981 i . ~9 Att Mr Dennis M Crutchfield~ Chief U.S. ;._;.::lA.R RECULAr  ::-) .

Operating Reactors Branch No 5 ,..-* COMMISSION OIY ."I US Nuclear Regulatory Commission ,0 .

V~'/-

Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -

EDITORIAL CHANGES TO JULY 21, 1981 TECHNICAL SPECIFICATION CHANGE REQUEST Consumers Power Company Technical Specification Change Request dated July 21, 1981 and entitled Linear Heat Rate Limits, Radial Peaking Factors and Excore Power Distribution has been found to have two editorial errors.

These errors occurred during the transcribing of the final submittal copy from the PRC and SARB reviewed copies and have resulted in the following required changes:

1. In the "Basis" section of Section 3.11.2, the last part of the first sentence should be changed from "Channel 5 through 7" to "Channel 5 through 8 11 *
2. Delete Section 4.19.3, Quadrant Power Tilt-Tq. and add the following to Table 3.17.4:

Minimum Minimum Permissible Operable Degree of By Pass No. Functional Unit Channels Redundancl Condition 16 Excore Detector 1 (h ). none none (h) Calculate. the Quadrant Power Tilt using the excore readings at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the excore detectors deviation alarms are inoperable.

Brian D Johnson Senior Licensing Engineer CC Director, Region III, USNRC NRC Resident Inspector-Palisades