ML18046A850
| ML18046A850 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 08/06/1981 |
| From: | Johnson B CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8108110171 | |
| Download: ML18046A850 (1) | |
Text
....
consume11 Power company Genenil Offices: 212 West Michigan Avenue, Jeckson, Ml 49201 * (617) 788-0650 August 6, 1981 Director, Nuclear Reactor Regulation Att Mr Dennis M Crutchfield~ Chief Operating Reactors Branch No 5 US Nuclear Regulatory Commission Washington, DC 20555
\\r nE Gf/V ED -~~
l 0 1981 i. ~9 U.S. ;._;.::lA.R RECULAr
- -).
COMMISSION OIY
."I
,0 V~'/-
DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
EDITORIAL CHANGES TO JULY 21, 1981 TECHNICAL SPECIFICATION CHANGE REQUEST Consumers Power Company Technical Specification Change Request dated July 21, 1981 and entitled Linear Heat Rate Limits, Radial Peaking Factors and Excore Power Distribution has been found to have two editorial errors.
These errors occurred during the transcribing of the final submittal copy from the PRC and SARB reviewed copies and have resulted in the following required changes:
- 1.
In the "Basis" section of Section 3.11.2, the last part of the first sentence should be changed from "Channel 5 through 7" to "Channel 5 through 8 11
- 2.
Delete Section 4.19.3, Quadrant Power Tilt-Tq. and add the following to Table 3.17.4:
Minimum Minimum Permissible Operable Degree of By Pass No.
Functional Unit Channels Redundancl Condition 16 Excore Detector 1 (h ).
none none (h)
Calculate. the Quadrant Power Tilt using the excore readings at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the excore detectors deviation alarms are inoperable.
Brian D Johnson Senior Licensing Engineer CC Director, Region III, USNRC NRC Resident Inspector-Palisades
,..,-9-1oaf10111 0100og;\\
. POR AOOCK 05000~0~
\\p
--