Requests Relief from Requirements of ASME Section XI Re 10-yr Hydrostatic Testing of Buried Piping in Auxiliary Feedwater Sys.Relief Sought Due to Alternative Test Method Used During First 10-yr Inservice Insp Outage.Fee Paid
ML18093A877
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/06/1988
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NLR-N88-076, NLR-N88-76, NUDOCS 8806160156
Download: ML18093A877 (3)


Text

Public Service Electric and Gas Company Steven E. Miltenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4199 Vice President -

Nuclear Operations June 6, 1988 NLR-N8807 6 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

INSERVICE INSPECTION PROGRAM RELIEF REQUEST SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 In accordance with 10CFR50.55a(g)(5), Public Service Electric and Gas Company {PSE&G) is requesting relief from the requirements of ASME Section XI regarding the 10-year hydrostatic testing of buried piping in the Salem Unit 1 Auxiliary Feedwater System. In particular, relief is being sought due to an alternative test method used during the recent Salem Unit 1 First 10-Year ISI outage. The relief request is presented in detail in the attachment to this letter and represents the final relief request for the Salem Unit 1 First 10-Year IS! interval.

In accordance with the requirements of 10CFR170.21, a check in the amount of $150.00 is enclosed.

If you have any questions with regard to this relief request, please do not hesitate to contact us.

Sincerely, Attachment

(

8806160156 880606 PDR ADOCK 05000272 P DCD

Document Control Desk 2 06-06-88 C Mr. D. C. Fische~

USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628

~

12(14)AF21 PUMP TIE IN 12 14 AF118 N SALEM UNIT 1 CONTAINMENT LEAKAGE COLLECTION UNIT 1 FHB POINT 12(14)BF57 12(14)BF58

\

\

\. NOTES

..... 1. EACH BURIED PIPE RUN IS APPROXIMATELY 190 FT.

OUTER MECHANICAL. 2. PIPE CONFIGURATION BURIED PENETRATION IS THE SAME FOR BOTH 12 AND 14 PIPES AF LINES 12(14)AF23