ML18093A877
| ML18093A877 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/06/1988 |
| From: | Miltenberger S Public Service Enterprise Group |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NLR-N88-076, NLR-N88-76, NUDOCS 8806160156 | |
| Download: ML18093A877 (3) | |
Text
(
Public Service Electric and Gas Company Steven E. Miltenberger Vice President -
Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609 339-4199 Nuclear Operations June 6, 1988 NLR-N8807 6 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
INSERVICE INSPECTION PROGRAM RELIEF REQUEST SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 In accordance with 10CFR50.55a(g)(5), Public Service Electric and Gas Company {PSE&G) is requesting relief from the requirements of ASME Section XI regarding the 10-year hydrostatic testing of buried piping in the Salem Unit 1 Auxiliary Feedwater System.
In particular, relief is being sought due to an alternative test method used during the recent Salem Unit 1 First 10-Year ISI outage.
The relief request is presented in detail in the attachment to this letter and represents the final relief request for the Salem Unit 1 First 10-Year IS! interval.
In accordance with the requirements of 10CFR170.21, a check in the amount of $150.00 is enclosed.
If you have any questions with regard to this relief request, please do not hesitate to contact us.
Attachment 8806160156 880606 PDR ADOCK 05000272 P
DCD Sincerely,
Document Control Desk 2
C Mr. D. C.
Fische~
USNRC Licensing Project Manager Mr. R. w. Borchardt USNRC Senior Resident Inspector Mr. w. T. Russell, Administrator USNRC Region I Mr. D. M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection 380 Scotch Road Trenton, NJ 08628 06-06-88
12(14)AF21 PUMP TIE IN 12 14 AF118 UNIT 1 FHB BURIED PIPES
\\
\\
\\.
12(14)AF23 SALEM UNIT 1 CONTAINMENT LEAKAGE COLLECTION POINT 12(14)BF57 12(14)BF58 OUTER MECHANICAL.
~
N NOTES
- 1. EACH BURIED PIPE RUN IS APPROXIMATELY 190 FT.
- 2. PIPE CONFIGURATION IS THE SAME FOR BOTH 12 AND 14 AF LINES
,_ -