ML18102B557

From kanterella
Revision as of 04:09, 3 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO
ML18102B557
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/27/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML18102B556 List:
References
NUDOCS 9709030379
Download: ML18102B557 (5)


Text

'**_,

LR-N970522 ATTACHMENT REVISED TECHNICAL SPECIFICATION BASES PAGES 9709030379 970827 PDR ADOCK 05000272.

P PDR

PLANT SYSTEMS BASES

==================================================================

3/4.7.1.4 ACTIVITY The limitations on secondary system specific activity ensure that the resultant off-site radiation dose will be limited to a small fraction of 10 CFR Part 100 limits in the event of a steam line rupture. This dose also includes the effects of a coincident 1.0 GPM primary to secondary tube leak in the steam generator of the affected steam line. These values are consistent with the assumptions used in the accident analyses.

3/4.7.1.5 MAIN STEAM LINE ISOLATION VALVES The OPERABILITY of the main steam line isolation valves ensures that no more than one steam generator will blowdown in the event of a steam line rupture. This restriction is required to 1) minimize the positive reactivity effects of the Reactor Coolant System cooldown associated with the blowdown, and 2) limit the pressure rise within containment in the event the steam line rupture occurs within containment. The OPERABILITY of the main steam isolation valves within the closure times of the surveillance requirements are consistent with the assumptions used in the accident analyses.

SALEM - UNIT 1 B 3/4 7-3 Amendment No. 25

PLANT SYSTEMS BASES

==================================================================

3/4.7.2 STE.Ar1 GENERATOR PRESSURE/TEMPERATURE LIMITATION The limitation on steam generator pressure and temperature ensures that the pressure induced stresses in the steam generators do not exceed the maximum allowable fracture toughness stress limits. The limitations of 70°F and 200 psig are based on average steam generator impact values taken at 10°F and are sufficient to prevent brittle fracture.

3/4.7.3 COMPONENT COOLING WATER SYSTEM

. The OPERABILITY of the component cooling water system ensures that sufficient cooling capacity is available for continued operation of safety-related equipment during normal and accident conditions. The component cooling water system (CCW) consists of two safeguards mechanical trains supplied by three pumps powered from separate vital buses. This complement of equipment assures adequate redundancy in the event of a single active component failure during the injection phase. Operability of the CCW system exists when both mechanical trains and all three CCW pumps are operable.

3/4.7.4 SERVICE WATER SYSTEM The OPERABILITY of the service water system ensures that sufficient cooling capacity is available for continued operation of safety related equipment during normal and accident conditions. The redundant cooling capacity of this system, assuming a single failure, is consistent with the assumptions used in the accident conditions within acceptable limits.

SALEM - UNIT 1 B 3/4 7-4 March 7, 1997

PLANT SYSTEMS BASES

==================================================================

)/4.7.1.4 ACTtVI'I'Y The limitations on secondary system specific activity ensure that the resultant offsite radiation dose will be limited to a small fraction of 10 CFR Part 100 limits in the event of a steam line rupture. This dose also includes the effects of a coincident 1.0 GPM primary to secondary tube leak in the steam generator of the affected steam line. These values are consistent with the assumptions used in the accident analyses.

3/4.7.1.5 MAIN STEAM LINE ISOLATION VALVES The OPERABILITY of the main steam line isolation valves ensures that no more than one steam generator will blowdown in the event of a steam line rupture. This restriction is required to 1) minimize the positive reactivity effects of the Reactor Coolant System cooldown associated with the blowdown, and 2) limit the pressure rise within containment in the event the main steam line rupture occurs within containment. The OPERABILITY of the main steam isolation valves within the closure times of the surveillance requirements are consistent with the assumptions used in the accident analyses.

SALEM - UNIT 2 B 3/4 7-3

-* -~

PLANT SYSTEMS BASES

==================================================================

3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION The limitation on steam generator pressure and temperature ensures that the pressure induced stresses in the steam generators do not exceed the maximum allowable fracture toughness stress limits. The limitations of 70°F and 200 psig are based on average steam generator impact values taken at 10°F and are sufficient to prevent brittle fracture.

3/4.7.3 COMPONENT COOLING WATER SYSTEM The OPERABILITY of the component cooling water system ensures that sufficient cooling capacity is available for continued operation of safety-related equipment during normal and accident conditions. The component cooling water system (CCW) consists of two safeguards mechanical trains supplied by three pumps powered from separate vital buses. This complement of equipment assures adequate redundancy in 'the event of a single active component failure during the injection phase. Operability of the CCW system exists when both mechanical trains and all three CCW pumps are operable.

3/4.7.4 SERVICE WATER SYSTEM The OPERABILITY of the service water system ensures that sufficient cooling capacity is available for continued operation of safety-related equipment during normal and accident conditions. The redundant cooling capacity of this system, assuming a single failure, is consistent with the assumptions used in the accident conditions within acceptable limits.

SALEM - UNIT 2 B 3/4 7-4 March 7, 1997