Document Control D'k Attachment 3

  • LR-N97231 LCR S97-06 SALEM GENERATING STATION UNIT NO 2 FACILITY OPERATING LICENSE DPR-75 DOCKET NOS. 50-311 CHANGE TO TECHNICAL SPECIFICATIONS HVAC SYSTEM TECHNICAL SPECIFICATION CHANGES TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. DPR-75 are affected by this change request:

Technical Specification Pages Index VII XIV 3/4.7.7 3/4 7-18 3/4.7.11 3/4 7-30 BASES 3/4.7.11 B 3/4 7-8

- Page 1 of 1 9705070254 970501 PDR ADOCK 05000311 I

P PDR

  • INDEX LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS SECTION PAGE 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE Safety Valves ......................................... 3/ 4 7-1 Auxiliary Feedwater System ............................ 3/4 7-5 Auxiliary Feed Storage Tank ........................... 3/4 7-7 Activity .............................................. 3/4 7-8 Main Steam Line Isolation Valves ...................... 3/4 7-10 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION ............................................ 3/ 4 7-11 3/4.7.3 COMPONENT COOLING WATER SYSTEM ........................ 3/4 7-12 3/4.7.4 SERVICE WATER SYSTEM .................................. 3/4 7-13 3/4.7.5 FLOOD PROTECTION ...................................... 3/ 4 7-14 3/4.7.6 CONTROL ROOM EMERGENCY AIR CONDITIONING SYSTEM ................................... 3/4 7-15 3/4.7.7 AUXILIARY BUILDING EXHAUST AIR FILTRATION SYSTEM ..................................... 3/4 7-18 3/4.7.8 SEALED SOURCE CONTAMINATION ........................... 3/4 7-21 3/4.7.9 SNUBBERS .............................................. 3/ 4 7-23 3/4.7.10 CHILLED WATER SYSTEM -

AUXILIARY BUILDING SUBSYSTEM ........................... 3/4 7-28 3/4.7.11 SWITCHGEAR AND PENETRATION AREA VENTILATION SYSTEM ..................................... 3/ 4 7-30 SALEM - UNIT 2 VII Amendment No.

  • INDEX BASES SECTION PAGE 3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE ......................................... B 3/4 7-1 3/4.7.2 STEAM GENERATOR PRESSURE/TEMPERATURE LIMITATION ............................................ B 3/4 7-4 3/4.7.3 COMPONENT COOLING WATER SYSTEM ........................ B 3/4 7-4 3/4.7.4 SERVICE WATER SYSTEM .................................. B 3/4 7-4 3/4.7.5 FLOOD PROTECTION ...................................... B 3/4 7-5 3/4.7.6 CONTROL ROOM EMERGENCY AIR CONDITIONING SYSTEM ................................... B 3/4 7-5 3/4.7.7 AUXILIARY BUILDING EXHAUST AIR FILTRATION SYSTEM ..................................... B 3/4 7-5 3/4.7.8 SEALED SOURCE CONTAMINATION ........................... B 3/4 7-5 3/4.7.9 SNUBBERS .............................................. B 3/4 7-6 3/4.7.10 CHILLED WATER SYSTEMS-AUXILIARY BUILDING SYSTEM .............................. B 3/4 7-8 3/ 4. 7 .11 SWITCHGEAR PENETRATION AREA VENTILATION SYSTEM ......... B 3/4 7-8 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A. C. SOURCES and AND 3/4.8.2 ONSITE POWER DISTRIBUTION SYSTEMS ..................... B 3/4 8-1 3/4.8.3 ELECTRICAL EQUIPMENT PROTECTIVE DEVICES ............... B 3/4 8-1 SALEM - UNIT 2 XIV Amendment No.

PLANT SYSTEMS 3/4.7.7 AUXILIARY BUILDING EXHAUST AIR FILTRATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.7 At least one Auxiliary Building exhaust air HEPA filter train, associated with the one charcoal adsorber bank, and at least two exhaust fans shall be OPERABLE.

APPLICABILITY: MODES l, 2, 3 and 4.

ACTION:

a. With the above required HEPA filter train inoperable, restore the HEPA filter train.to OPERABLE status* within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With the charcoal adsorber bank inoperable, restore the charcoal adsorber bank to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

I~

c. With only one exhaust fan OPERABLE~estore at least two exhaust fans to OPERABLE status withinG;:rdays or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.7.7 The above required Auxiliary Building exhaust air filtration system shall be demonstrated OPERABLE:

a. At least once per 31 days by initiating, from the control room, flow through the HEPA filter and charcoal adsorber train and verifying that the filter train and each fan operate for at least 15 minutes.
b. At least once per 18 months or (1) after any structural maintenance on the HEPA filter or charcoal adsorber housings, or (2) following painting, fire or chemical release in any ventilation zone communi-cating with the system, by:
  • ,i***,,**'.:

SALEM - UNIT 2 3/4 7-18

PLANT SYqTEMS *

  • 3/4.7.11 SWITCHGEAR AND PENETRATION AREA VENTILATION SYSTEM LIMITING CONDITION FOR OPERATION 3.7.11.1 The Switchgear and Penetration Area Ventilation System (SPAVS) shall be OPERABLE with:
a. Three supply fans,
b. Two exhaust fans for the Switchgear Area,
c. Two exhaust fans for the Penetration Area.

APPLICABILITY: MODES 1, 2, 3, and 4.

ACTION:

a. With only two supply fans operable, restore three fans to OPERABLE status within 14 days or be in at least HOT STANDBY with the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b. With only one exhaust fan for the switchgear area operable, restore both fans to OPERABLE status within 14 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c. With only one exhaust fan for the penetration area operable, restore both fans to OPERABLE status within 14 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

Otherwise, be in at least HOT SHUTDOWN within the ne*t 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

ACTION: MODES 5 and 6.

a. With only one supply fan operable, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitor SPAV areas for temperature effects and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter until two fans are returned to OPER.Jl...BLE status.

If temperature exceeds 105° F then establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

b. With no exhaust fans for the switchgear area operable, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitor SPAV areas for temperature effects and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter until at least one fan is returned to OPERABLE status. If temperature exceeds 105° F then establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SALEM - UNIT 2 3/4 7-30 Amendment No.

PLANT SYSTEMS

  • LIMITING CONDITION FOR OPERATIONS (Continued)
==========================================================
c. With no exhaust fans for the penetration area operable, within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitor SPAV areas for temperature effects and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter until at least one fan is returned to OPERABLE status. If temperature exceeds 105° F then establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE REQUIREMENTS None SALEM - UNIT 2 3/4 7-31 Amendment No.

PLANT SYSTEMS BASES

==========================================================

3/4.7.10 CHILLED WATER SYSTEM - AUXILIARY BUILDING SUBSYSTEM The OPERABILITY of the chilled water system ensures that the chilled water system will continue to provide the required normal and accident heat removal capability for the control room area, relay rooms, equipment rooms, and other safety related areas. Verification of the actuation of each automatic valve on a Safeguards Initiation signal includes actuation following receipt of a Safety Injection signal.

During maintenance and surveillance testing, operator actions can take the place of automatic actions.

During Modes 5 and 6 and during movement of irradiated fuel assemblies, chilled water components do not have to be considered inoperable solely on the basis that the backup emergency power source, diesel generator, is inoperable.

This is consistent with Technical Specification 3.8.1.2 which only requires two operable diesel generators.

3/4.7.11 SWITCHGEAR PENETRATION AREA VENTILATION SYSTEM The OPERABILITY of the Switchgear Penetration Area Ventilation system ensures that design basis maximum temperature of 110° F is maintained in the areas which this system services.

SALEM - UNIT 2 B 3/4 7-8 Amendment No.