Category:CORRESPONDENCE-LETTERS
MONTHYEARML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20126L3111985-07-22022 July 1985 Provides Further Update to 840330 Submission Re Soil Erosion Control & Stabilization Projects Per Insp Rept 50-363/80-02. Revegetation of Banks of Oyster Creek Divided Into Two Portions,W/Eastern Portion Completed in 1984 ML20087P5531984-04-0202 April 1984 Forwards Responses to 840307 Questions Re full-term OL Conversion Environ Review. Effects of Salt Drift on Land Dwelling Vertebrates & Terrestrial Environ Program Annual Rept,Mar 1978 - Feb 1979 Encl ML20084M2941984-03-30030 March 1984 Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615 ML20077J0861983-07-20020 July 1983 Forwards Amended Complaint Filed in New Jersey Middlesex Superior Court by Jf Laird,Et Al & Companion Suit Filed by M Ginda & B Keene,Et Al Re Alleged Injuries Resulting from Identical Radiation Exposures ML20083P0791983-01-20020 January 1983 Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Soil Erosion Control Project at Barge Unloading Facility Completed ML20076B8331982-10-0404 October 1982 Forwards Info Resolving 14 Tech Spec Open Items Discussed at 820913 meeting.Marked-up Tech Specs Encl IR 05000363/19800021982-08-0909 August 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-363/80-02 ML20062H7921982-07-28028 July 1982 Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/82-02.Corrective Actions:Soil Stabilization Work Began 820504 & Should Be Complete by 820830 ML20004C7751981-04-23023 April 1981 FOIA Request for Psar,Drawings & Specs Re Facility ML20003G3121981-02-27027 February 1981 Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Slope to Be Regraded & Contoured to Decrease Erosion Potential & Amount of Concentrated Rainwater Runoff Washing Slope ML20003A8131981-02-0505 February 1981 Submits Fee for Class III Request Re Delay on One Fire Protection Mod ML20003A9041981-02-0404 February 1981 Responds to NRC 810114 Ltr Re SEP Lead Topic Approach Proposed by SEP Owners Group.Licensee May Not Have Adequate Time to Comment on Safety Evaluation.Written Notification Will Be Provided to Request Addl Time ML19327A3271980-07-14014 July 1980 Informs That IE Bulletins,Circulars & Notices Requiring Review &/Or Response for Facility Are on Hold Due to Postponement of Const Activities.Current Action Files Maintained.Schedule of Responses Will Be Forwarded ML19309D0151980-04-0303 April 1980 Forwards Supplementary Financial Info in Support of TMI-1 Restart Proceedings ML20126D4901980-03-21021 March 1980 Responds to & 800104 Petition to NRC for Public Hearing Re Application for Extension of Cp.Opportunity for Public Hearing Should Be Afforded.Fr Notice of Opportunity Will Be Forwarded Upon Publication ML19320C8141980-03-11011 March 1980 Requests Documents Containing Info Needed for Fuel Cost Study ML19322E6141980-03-11011 March 1980 Responds to IE Bulletin 80-03 Re Visual Insps of Charcoal Adsorber Cells.Equipment of This Type Has Not Been Purchased to Date ML19296E0101980-03-0505 March 1980 Responds to IE Bulletin 79-28 Re Replacement of Top Cover Gaskets on Stem Mounted Limit Switches.Namco EA180 Switches Not Installed in safety-related Equipment Inside or Outside Containment.Assigned Electrical Equipment Being Purchased ML19294B1421980-02-20020 February 1980 Responds to NRC 791226 Ltr Re Estimated Evacuation Time for Plume Exposure Pathway Around Util.Evacuation Time Essentially Same as Oyster Creek,Submitted on 800131. Evacuation Time Estimate of 13.9-h Conservative ML19305C0101980-01-25025 January 1980 Opposes Protracted & Expensive Study of Jcp&L Financial Condition,W/Followup Hearings & Court Battles.Study Would Block Constructive Activity for Yrs.Consumers Will Pay for Delays.Ltr Dtd 800125 to Nj Ofc of Public Advocate Encl ML19257C1711979-11-28028 November 1979 Responds to NRC 791026 Ltr Re Violation Noted in IE Insp Rept 50-363/79-08.Corrective Actions:Venting of Air Bldg Per FSP-1-12,Revision 1,immediately Reinstituted.Field Personnel Instructed to Follow All Approved Procedures Until Revised ML19256F2701979-11-14014 November 1979 Responds to IE Bulletin 79-25, Reactor Trips at Turkey Point Units 3 & 4. No Electrical Equipment Purchased W/ Installed Westinghouse Bfd Relays.Will Request Ae to Identify Type Relays If Bfd Relays Selected ML19256E8251979-11-0707 November 1979 Requests Expansion of Environ Monitoring Program to Include Intensive Mortality Studies of Impinged & Entrained Organisms & Reduced Efforts Re Species Composition & Abundance Sampling ML19210D7121979-10-22022 October 1979 Responds to IE Bulletin 79-24, Frozen Lines. Heat Tracing & Freeze Protection Sys Design Incomplete ML19309H0281979-10-22022 October 1979 Requests Info Re Encl Freeholder RA Gasser 791009 Ltr Discussing s Van Ness Request to Suspend CP ML19254E8341979-09-28028 September 1979 Responds to IE Bulletin 79-23.Emergency Diesel Generator Field Exciter Transformer Not Yet Purchased.When Equipment Is Purchased,Util Will Ensure Design & Testing Meets Items 1 & 2 of Bulletin ML19254D1331979-09-27027 September 1979 Notifies That De Facto Continuation of CP Has Served to Exempt Facility from Complying W/Most up-to-date Safety Sys. Requests Public Hearings Re Safety Issues & Financial Qualifications ML19249D8641979-09-20020 September 1979 Responds to 790821 Ltr Re QA Program for Preservation of safety-related Equipment,Components & Structures During Suspension of Const Activities.Program Will Be in Accordance W/General Requirements of QA Plan ML19254E0631979-09-20020 September 1979 Responds to NRC 790823 Ltr Re Violations Noted in IE Insp Rept 50-363/79-07.Corrective Actions:Preventative Svc & Storage Program Procedures & QA Surveillance Program Procedures Revised ML19249D5201979-08-24024 August 1979 Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Facility Design Currently Employs Vertical Turbine Pumps in Nuclear Svc Water Sys only.As-built Vendor Data Not Yet Available ML20126C5091979-08-16016 August 1979 Opposes Restart of TMI-1,const of Nuclear Plants in Nj & Nuclear Accidents Due to Health Hazards & Risks to Public Safety ML19242A7021979-07-30030 July 1979 Requests Deferment of NRC Action on 780831 Request for Extension of Facility Completion Date.Financial Effects Stemming from TMI-2 Incident Will Preclude Recommencement of Const ML19249A4981979-07-30030 July 1979 Responds to IE Bulletins 79-02 & 79-02 Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Pipe Support Base Plate Designs Are Not in Use at Plant ML19242C7061979-07-30030 July 1979 Responds to IE Bulletin 79-14 Re Seismic Analysis for as-built safety-related Piping Sys.No safety-related Piping Sys at Plant ML19225A8601979-07-13013 July 1979 Confirms 790713 Telcon Requesting Summary of NRC Meeting W/Util Re Renewal of Facility CP ML19242B2051979-06-29029 June 1979 Forwards C-E 790608 Ltr Responding to IE Bulletins 78-12, 12A & 12B Re Atypical Weld Matl in Reactor Pressure Vessel Welds ML19242B2921979-06-25025 June 1979 Responds to IE Bulletin 79-11 Re Use of Westinghouse DB-50 & DB-75 Circuit Breakers in safety-related Sys.No Circuit Breakers of This Type Have Been Purchased ML19242B2141979-06-0808 June 1979 Forwards C-E Rept, Info Requested by IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, & Certification That All Matls Used in Reactor Vessel Fabrication Are Discussed in Rept ML19241A7901979-06-0606 June 1979 Responds to IE Bulletin 79-07.Version of Adlpipe Computer Program Which Includes Algebraic Summation Technique Has Been Used for Final Design of Support for Containment Spray Sys ML19246B9371979-06-0606 June 1979 Partially Responds to IE Bulletin 78-12B Re Atypical Weld matl.C-E Will Submit Generic Rept to NRC by 790608.Final Response Will Be Provided by 790629 ML19242B4201979-05-29029 May 1979 Responds to IE Bulletin 79-03 Re Weld Defects in 304 or 312 Stainless Steel Pipe Spools.Spools Used in Containment Penetrations M-43 & M-44.Corrective Actions:Welds Radiographed & Defects Repaired ML19289F4581979-05-0101 May 1979 Responds to IE Bulletin 79-04.Swing Check Valves Not Installed in Facility ML19289F4571979-05-0101 May 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Purchased to Date ML19289F6141979-04-20020 April 1979 Responds to NRC 790312 Ltr Re Violations Noted in IE Insp Rept 50-363/79-02.Corrective Actions:Initiation of Program for Daily Monitoring of Equipment Pressurized W/Inert Gas ML19256F4131979-04-0909 April 1979 Notifies of Concern Over Use of Nuclear Generation & Operating Similarities in Design of TMI-2 & Other Nuclear Units.Requests Meeting W/Nrc to Identify Strategy to Reduce Probability of TMI-incident at Facility ML19289F2061979-03-15015 March 1979 Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Rept 50-363/78-15.Corrective Actions:Theodolite Was Serviced & Two Tachometers Sent for Recalibr ML20104A7271979-03-0505 March 1979 Forwards Design Info,Submittal 2,Structural Reorientation, W/Current Design Features Reflecting New Licensing Concerns of post-CP Period 1999-06-25
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20209B4831999-06-25025 June 1999 Requests NRC Approval of Six Relief Requests from ASME Code Requirement for Containment ISI Exams.Six Relief Requests, Provided as Enclosures 1-6,are as Listed ML20126L3111985-07-22022 July 1985 Provides Further Update to 840330 Submission Re Soil Erosion Control & Stabilization Projects Per Insp Rept 50-363/80-02. Revegetation of Banks of Oyster Creek Divided Into Two Portions,W/Eastern Portion Completed in 1984 ML20087P5531984-04-0202 April 1984 Forwards Responses to 840307 Questions Re full-term OL Conversion Environ Review. Effects of Salt Drift on Land Dwelling Vertebrates & Terrestrial Environ Program Annual Rept,Mar 1978 - Feb 1979 Encl ML20084M2941984-03-30030 March 1984 Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615 ML20077J0861983-07-20020 July 1983 Forwards Amended Complaint Filed in New Jersey Middlesex Superior Court by Jf Laird,Et Al & Companion Suit Filed by M Ginda & B Keene,Et Al Re Alleged Injuries Resulting from Identical Radiation Exposures ML20083P0791983-01-20020 January 1983 Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Soil Erosion Control Project at Barge Unloading Facility Completed ML20076B8331982-10-0404 October 1982 Forwards Info Resolving 14 Tech Spec Open Items Discussed at 820913 meeting.Marked-up Tech Specs Encl ML20062H7921982-07-28028 July 1982 Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/82-02.Corrective Actions:Soil Stabilization Work Began 820504 & Should Be Complete by 820830 ML20004C7751981-04-23023 April 1981 FOIA Request for Psar,Drawings & Specs Re Facility ML20003G3121981-02-27027 February 1981 Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Slope to Be Regraded & Contoured to Decrease Erosion Potential & Amount of Concentrated Rainwater Runoff Washing Slope ML20003A8131981-02-0505 February 1981 Submits Fee for Class III Request Re Delay on One Fire Protection Mod ML20003A9041981-02-0404 February 1981 Responds to NRC 810114 Ltr Re SEP Lead Topic Approach Proposed by SEP Owners Group.Licensee May Not Have Adequate Time to Comment on Safety Evaluation.Written Notification Will Be Provided to Request Addl Time ML19327A3271980-07-14014 July 1980 Informs That IE Bulletins,Circulars & Notices Requiring Review &/Or Response for Facility Are on Hold Due to Postponement of Const Activities.Current Action Files Maintained.Schedule of Responses Will Be Forwarded ML19309D0151980-04-0303 April 1980 Forwards Supplementary Financial Info in Support of TMI-1 Restart Proceedings ML19320C8141980-03-11011 March 1980 Requests Documents Containing Info Needed for Fuel Cost Study ML19322E6141980-03-11011 March 1980 Responds to IE Bulletin 80-03 Re Visual Insps of Charcoal Adsorber Cells.Equipment of This Type Has Not Been Purchased to Date ML19296E0101980-03-0505 March 1980 Responds to IE Bulletin 79-28 Re Replacement of Top Cover Gaskets on Stem Mounted Limit Switches.Namco EA180 Switches Not Installed in safety-related Equipment Inside or Outside Containment.Assigned Electrical Equipment Being Purchased ML19294B1421980-02-20020 February 1980 Responds to NRC 791226 Ltr Re Estimated Evacuation Time for Plume Exposure Pathway Around Util.Evacuation Time Essentially Same as Oyster Creek,Submitted on 800131. Evacuation Time Estimate of 13.9-h Conservative ML19305C0101980-01-25025 January 1980 Opposes Protracted & Expensive Study of Jcp&L Financial Condition,W/Followup Hearings & Court Battles.Study Would Block Constructive Activity for Yrs.Consumers Will Pay for Delays.Ltr Dtd 800125 to Nj Ofc of Public Advocate Encl ML19257C1711979-11-28028 November 1979 Responds to NRC 791026 Ltr Re Violation Noted in IE Insp Rept 50-363/79-08.Corrective Actions:Venting of Air Bldg Per FSP-1-12,Revision 1,immediately Reinstituted.Field Personnel Instructed to Follow All Approved Procedures Until Revised ML19256F2701979-11-14014 November 1979 Responds to IE Bulletin 79-25, Reactor Trips at Turkey Point Units 3 & 4. No Electrical Equipment Purchased W/ Installed Westinghouse Bfd Relays.Will Request Ae to Identify Type Relays If Bfd Relays Selected ML19256E8251979-11-0707 November 1979 Requests Expansion of Environ Monitoring Program to Include Intensive Mortality Studies of Impinged & Entrained Organisms & Reduced Efforts Re Species Composition & Abundance Sampling ML19210D7121979-10-22022 October 1979 Responds to IE Bulletin 79-24, Frozen Lines. Heat Tracing & Freeze Protection Sys Design Incomplete ML19309H0281979-10-22022 October 1979 Requests Info Re Encl Freeholder RA Gasser 791009 Ltr Discussing s Van Ness Request to Suspend CP ML19254E8341979-09-28028 September 1979 Responds to IE Bulletin 79-23.Emergency Diesel Generator Field Exciter Transformer Not Yet Purchased.When Equipment Is Purchased,Util Will Ensure Design & Testing Meets Items 1 & 2 of Bulletin ML19254D1331979-09-27027 September 1979 Notifies That De Facto Continuation of CP Has Served to Exempt Facility from Complying W/Most up-to-date Safety Sys. Requests Public Hearings Re Safety Issues & Financial Qualifications ML19249D8641979-09-20020 September 1979 Responds to 790821 Ltr Re QA Program for Preservation of safety-related Equipment,Components & Structures During Suspension of Const Activities.Program Will Be in Accordance W/General Requirements of QA Plan ML19254E0631979-09-20020 September 1979 Responds to NRC 790823 Ltr Re Violations Noted in IE Insp Rept 50-363/79-07.Corrective Actions:Preventative Svc & Storage Program Procedures & QA Surveillance Program Procedures Revised ML19249D5201979-08-24024 August 1979 Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Facility Design Currently Employs Vertical Turbine Pumps in Nuclear Svc Water Sys only.As-built Vendor Data Not Yet Available ML20126C5091979-08-16016 August 1979 Opposes Restart of TMI-1,const of Nuclear Plants in Nj & Nuclear Accidents Due to Health Hazards & Risks to Public Safety ML19242C7061979-07-30030 July 1979 Responds to IE Bulletin 79-14 Re Seismic Analysis for as-built safety-related Piping Sys.No safety-related Piping Sys at Plant ML19242A7021979-07-30030 July 1979 Requests Deferment of NRC Action on 780831 Request for Extension of Facility Completion Date.Financial Effects Stemming from TMI-2 Incident Will Preclude Recommencement of Const ML19249A4981979-07-30030 July 1979 Responds to IE Bulletins 79-02 & 79-02 Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Pipe Support Base Plate Designs Are Not in Use at Plant ML19225A8601979-07-13013 July 1979 Confirms 790713 Telcon Requesting Summary of NRC Meeting W/Util Re Renewal of Facility CP ML19242B2051979-06-29029 June 1979 Forwards C-E 790608 Ltr Responding to IE Bulletins 78-12, 12A & 12B Re Atypical Weld Matl in Reactor Pressure Vessel Welds ML19242B2921979-06-25025 June 1979 Responds to IE Bulletin 79-11 Re Use of Westinghouse DB-50 & DB-75 Circuit Breakers in safety-related Sys.No Circuit Breakers of This Type Have Been Purchased ML19242B2141979-06-0808 June 1979 Forwards C-E Rept, Info Requested by IE Bulletin 78-12, Atypical Weld Matl in Reactor Pressure Vessel Welds, & Certification That All Matls Used in Reactor Vessel Fabrication Are Discussed in Rept ML19241A7901979-06-0606 June 1979 Responds to IE Bulletin 79-07.Version of Adlpipe Computer Program Which Includes Algebraic Summation Technique Has Been Used for Final Design of Support for Containment Spray Sys ML19246B9371979-06-0606 June 1979 Partially Responds to IE Bulletin 78-12B Re Atypical Weld matl.C-E Will Submit Generic Rept to NRC by 790608.Final Response Will Be Provided by 790629 ML19242B4201979-05-29029 May 1979 Responds to IE Bulletin 79-03 Re Weld Defects in 304 or 312 Stainless Steel Pipe Spools.Spools Used in Containment Penetrations M-43 & M-44.Corrective Actions:Welds Radiographed & Defects Repaired ML19289F4571979-05-0101 May 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Purchased to Date ML19289F4581979-05-0101 May 1979 Responds to IE Bulletin 79-04.Swing Check Valves Not Installed in Facility ML19289F6141979-04-20020 April 1979 Responds to NRC 790312 Ltr Re Violations Noted in IE Insp Rept 50-363/79-02.Corrective Actions:Initiation of Program for Daily Monitoring of Equipment Pressurized W/Inert Gas ML19256F4131979-04-0909 April 1979 Notifies of Concern Over Use of Nuclear Generation & Operating Similarities in Design of TMI-2 & Other Nuclear Units.Requests Meeting W/Nrc to Identify Strategy to Reduce Probability of TMI-incident at Facility ML19289F2061979-03-15015 March 1979 Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Rept 50-363/78-15.Corrective Actions:Theodolite Was Serviced & Two Tachometers Sent for Recalibr ML20104A7271979-03-0505 March 1979 Forwards Design Info,Submittal 2,Structural Reorientation, W/Current Design Features Reflecting New Licensing Concerns of post-CP Period ML19274D8901979-01-16016 January 1979 Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Repts 50-363/78-15.Corrective Actions:Equipment Was Recalibr & Validating Test Data Taken Following Expiration Date ML19270F2101978-12-20020 December 1978 Responds to NRC 781116 Ltr Re Violation Noted in IE Insp Rept 50-363/78-13.Corrective Actions:Procedure for Placement & Curing of Concrete Revised to Include Quantitative & Qualitative Acceptance Criteria ML20147C1231978-11-13013 November 1978 Responds to 781017 NRC Ltr Re Violation Noted in Inspec Rept 50-363/78-12.Corrective Actions:Personnel Reinspected & Retested;Inspector Assigned to Inspect Status of Concrete Curing ML20150C3901978-11-13013 November 1978 Forwards Statement by RA Gasser Re Proposed Salt Water Cooling Tower at Subj Facil 1999-06-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML20126L3111985-07-22022 July 1985 Provides Further Update to 840330 Submission Re Soil Erosion Control & Stabilization Projects Per Insp Rept 50-363/80-02. Revegetation of Banks of Oyster Creek Divided Into Two Portions,W/Eastern Portion Completed in 1984 ML20087P5531984-04-0202 April 1984 Forwards Responses to 840307 Questions Re full-term OL Conversion Environ Review. Effects of Salt Drift on Land Dwelling Vertebrates & Terrestrial Environ Program Annual Rept,Mar 1978 - Feb 1979 Encl ML20084M2941984-03-30030 March 1984 Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615 ML20083P0791983-01-20020 January 1983 Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Soil Erosion Control Project at Barge Unloading Facility Completed ML20076B8331982-10-0404 October 1982 Forwards Info Resolving 14 Tech Spec Open Items Discussed at 820913 meeting.Marked-up Tech Specs Encl ML20062H7921982-07-28028 July 1982 Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/82-02.Corrective Actions:Soil Stabilization Work Began 820504 & Should Be Complete by 820830 ML20003G3121981-02-27027 February 1981 Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Slope to Be Regraded & Contoured to Decrease Erosion Potential & Amount of Concentrated Rainwater Runoff Washing Slope ML20003A8131981-02-0505 February 1981 Submits Fee for Class III Request Re Delay on One Fire Protection Mod ML20003A9041981-02-0404 February 1981 Responds to NRC 810114 Ltr Re SEP Lead Topic Approach Proposed by SEP Owners Group.Licensee May Not Have Adequate Time to Comment on Safety Evaluation.Written Notification Will Be Provided to Request Addl Time ML19327A3271980-07-14014 July 1980 Informs That IE Bulletins,Circulars & Notices Requiring Review &/Or Response for Facility Are on Hold Due to Postponement of Const Activities.Current Action Files Maintained.Schedule of Responses Will Be Forwarded ML19309D0151980-04-0303 April 1980 Forwards Supplementary Financial Info in Support of TMI-1 Restart Proceedings ML19322E6141980-03-11011 March 1980 Responds to IE Bulletin 80-03 Re Visual Insps of Charcoal Adsorber Cells.Equipment of This Type Has Not Been Purchased to Date ML19296E0101980-03-0505 March 1980 Responds to IE Bulletin 79-28 Re Replacement of Top Cover Gaskets on Stem Mounted Limit Switches.Namco EA180 Switches Not Installed in safety-related Equipment Inside or Outside Containment.Assigned Electrical Equipment Being Purchased ML19294B1421980-02-20020 February 1980 Responds to NRC 791226 Ltr Re Estimated Evacuation Time for Plume Exposure Pathway Around Util.Evacuation Time Essentially Same as Oyster Creek,Submitted on 800131. Evacuation Time Estimate of 13.9-h Conservative ML19257C1711979-11-28028 November 1979 Responds to NRC 791026 Ltr Re Violation Noted in IE Insp Rept 50-363/79-08.Corrective Actions:Venting of Air Bldg Per FSP-1-12,Revision 1,immediately Reinstituted.Field Personnel Instructed to Follow All Approved Procedures Until Revised ML19256F2701979-11-14014 November 1979 Responds to IE Bulletin 79-25, Reactor Trips at Turkey Point Units 3 & 4. No Electrical Equipment Purchased W/ Installed Westinghouse Bfd Relays.Will Request Ae to Identify Type Relays If Bfd Relays Selected ML19256E8251979-11-0707 November 1979 Requests Expansion of Environ Monitoring Program to Include Intensive Mortality Studies of Impinged & Entrained Organisms & Reduced Efforts Re Species Composition & Abundance Sampling ML19210D7121979-10-22022 October 1979 Responds to IE Bulletin 79-24, Frozen Lines. Heat Tracing & Freeze Protection Sys Design Incomplete ML19254E8341979-09-28028 September 1979 Responds to IE Bulletin 79-23.Emergency Diesel Generator Field Exciter Transformer Not Yet Purchased.When Equipment Is Purchased,Util Will Ensure Design & Testing Meets Items 1 & 2 of Bulletin ML19249D8641979-09-20020 September 1979 Responds to 790821 Ltr Re QA Program for Preservation of safety-related Equipment,Components & Structures During Suspension of Const Activities.Program Will Be in Accordance W/General Requirements of QA Plan ML19254E0631979-09-20020 September 1979 Responds to NRC 790823 Ltr Re Violations Noted in IE Insp Rept 50-363/79-07.Corrective Actions:Preventative Svc & Storage Program Procedures & QA Surveillance Program Procedures Revised ML19249D5201979-08-24024 August 1979 Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Facility Design Currently Employs Vertical Turbine Pumps in Nuclear Svc Water Sys only.As-built Vendor Data Not Yet Available ML19249A4981979-07-30030 July 1979 Responds to IE Bulletins 79-02 & 79-02 Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Pipe Support Base Plate Designs Are Not in Use at Plant ML19242C7061979-07-30030 July 1979 Responds to IE Bulletin 79-14 Re Seismic Analysis for as-built safety-related Piping Sys.No safety-related Piping Sys at Plant ML19242A7021979-07-30030 July 1979 Requests Deferment of NRC Action on 780831 Request for Extension of Facility Completion Date.Financial Effects Stemming from TMI-2 Incident Will Preclude Recommencement of Const ML19242B2051979-06-29029 June 1979 Forwards C-E 790608 Ltr Responding to IE Bulletins 78-12, 12A & 12B Re Atypical Weld Matl in Reactor Pressure Vessel Welds ML19242B2921979-06-25025 June 1979 Responds to IE Bulletin 79-11 Re Use of Westinghouse DB-50 & DB-75 Circuit Breakers in safety-related Sys.No Circuit Breakers of This Type Have Been Purchased ML19241A7901979-06-0606 June 1979 Responds to IE Bulletin 79-07.Version of Adlpipe Computer Program Which Includes Algebraic Summation Technique Has Been Used for Final Design of Support for Containment Spray Sys ML19246B9371979-06-0606 June 1979 Partially Responds to IE Bulletin 78-12B Re Atypical Weld matl.C-E Will Submit Generic Rept to NRC by 790608.Final Response Will Be Provided by 790629 ML19242B4201979-05-29029 May 1979 Responds to IE Bulletin 79-03 Re Weld Defects in 304 or 312 Stainless Steel Pipe Spools.Spools Used in Containment Penetrations M-43 & M-44.Corrective Actions:Welds Radiographed & Defects Repaired ML19289F4571979-05-0101 May 1979 Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Purchased to Date ML19289F4581979-05-0101 May 1979 Responds to IE Bulletin 79-04.Swing Check Valves Not Installed in Facility ML19289F6141979-04-20020 April 1979 Responds to NRC 790312 Ltr Re Violations Noted in IE Insp Rept 50-363/79-02.Corrective Actions:Initiation of Program for Daily Monitoring of Equipment Pressurized W/Inert Gas ML19289F2061979-03-15015 March 1979 Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Rept 50-363/78-15.Corrective Actions:Theodolite Was Serviced & Two Tachometers Sent for Recalibr ML19274D8901979-01-16016 January 1979 Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Repts 50-363/78-15.Corrective Actions:Equipment Was Recalibr & Validating Test Data Taken Following Expiration Date ML19270F2101978-12-20020 December 1978 Responds to NRC 781116 Ltr Re Violation Noted in IE Insp Rept 50-363/78-13.Corrective Actions:Procedure for Placement & Curing of Concrete Revised to Include Quantitative & Qualitative Acceptance Criteria ML20147C1231978-11-13013 November 1978 Responds to 781017 NRC Ltr Re Violation Noted in Inspec Rept 50-363/78-12.Corrective Actions:Personnel Reinspected & Retested;Inspector Assigned to Inspect Status of Concrete Curing ML20150B6791978-09-25025 September 1978 Responds to 780822 NRC Ltr Re Violations Noted in Inspec Rept 50-363/78-10.Corrective actions:3 Training Sessions Have Been Held w/Morrison-Knudsen Quality Dept Addressing Areas of Violation ML20049A1131978-08-31031 August 1978 Requests Extension of Earliest & Lastest Completion Dates for CPPR-96 from 770404 to 781004 & 830201 to 850201, Respectively 1985-07-22
[Table view] |
Text
.. .
- Jersey Central Power & Light Compar'y
. )
f f Mad: son Avenue at Punch Bowl Road Momstown, New Jersey 07960 e
(201)455-8200 File: 2421.13 June 6, 1979 Mr. Boyce H. Grier, Di 7ctor Office of Inspection &
Enforcement, Region U.S. Nuclear Regulatory _ommission 631 Park Avenue King of Prussia, PA 19406
Dear Mr. Grier:
SUBJECT:
FORKED RIVER NUCLEAR STATIOM (FRNS)
DOCKET NUMBER 50-363 IE BULLETIN No. 79-07 RESPONSE A version of the ADLPIPE Computer Program, which includes an algebraic summation technique has been used for the final design of support for FRNS Containment Spray system. The version of ADLPIPE utilized uses intra modal algebraic summation for codirectional components resulting # rom multiple earthquake directional motions. The Square Root of the Sum of Squares summation is used to deteunine the combined response for all modes. Closely spaced modes (within 10%) are summed absolutely.
Burns & Roe, the FRNS Architect Engineer, has directed that computer listings call for in Item 2 for versions of ADLPIPE from 1972 to the present be forwarded to the NRC. It should be noted, however, that ADLPIPE is a proprietary program owned and technically supported by: Arthur D. Little, Inc.; Acorn Park; Cambridge, MA 02140.
For operational piping analyses, Burns & Roe has exclusively used Arthur D. Little piping analysis program, ADLPIPE. This computer program was the only program in the public domain which considered the nuclear piping requirements for the Code, ANSI-B31.7.
In the year 1972, an updated version enabled the user to produce a partial stress report required to meet the requirements of the B&PV ASME Section III, Div. 1 Code, as well as ANSI-B31.1 Code for piping and components. It also contained, for the first ,~
time, a spectra modal response analysis for redundant pipe systems. /
.) 6 ,
310 107 Jersey Central Power & L:ght Ccmpany is a Member of the General Puphc UM: es System
Mr. Boyce H. Grier IE Bulletin 79-07 Page 2 Arthur D. Little performed the validation of the Code in their support of the ADLPIPE Program. This validation is discussed in Attachment 1.
Burns & Roe also has an ongoing validation program. Typical spectra response and time history analyses from the ADLPIPE Program have been compared with the results from ANSYS and STARDYNE Computer Programs. Minor differences, due to different numerical techniques used within the programs, have been identified but verification has been demonstrated by these comparisons.
In addition, the following comparisons have been made of the different summation options of ADLPIPE against other recognized industry methods and benchmarks.
Comparison of ADLPIPE vs. NUPIPE Computer Program.
This study included eight (8) typical pipe systems having various diameter pipe sizes.
ADLPIPE Algebraic Summation vs. NUPIPE ADLPIPE Opt. 192 vs. NUPIPE ADLPIPE Opt. 160 vs. NUPIPE Second...y, the ADLPIPE Program was used to solve selected problems in report BNL-NUREG-21241-R2 issued by Department of Nuclear Energy Brookhaven National Laboratory.
ADLPIPE Algebraic Summation vs. BNL Hovgaard Problem ADLPIPE Opt. 192 vs. BNL Hovgaard Problem ADLPIPE Opt. 160 vs. BNL Hovgaard Problem ADLPIPE Algebraic Summation vs. BNL Coffee Table Problem ADLPIPE Opt. 192 vs. BNL Coffee Table Problem ADLPIPE Opt. 160 vs. BNL Coffee Table Problem The FRNS Containment Spray system supports will be reanalyzed using option 192 of ALDPIPE prior to conmencing construction of this system. In addition, option 192 will be used for support /
piping design for other FRNS systems.
Very truly yours, o
/ ,, (b Ivan R. Finfrock, Jr.
Vice President' asb Attachment cc: Director, Office of Inspection &
Enforcement Division of Reactor Operations &
Inspection U.S. Nuclear Regulatory Commission 310 108 Washington, DC 20555
~
ATTACIIMENT 1 VERIFICATION OF ADLPIPE The following is excerpted from:
Letter from I.W. Dingwell (ADL) to J.B. Mahoney (B&R)
- dated April 27, 1979.
~
Verification of ADLPIPE Verificatien of ADL?I?E uas undertakan in a series of fundacental checks.
In i=portant =cdifications a supporting docu=ent was prepared as an ADL?I?E reference. The verification procedure was as follows. -
The thernal and deadweight loadings were checked by a Hovgaard Bend and hnnd calculated syste=s given in " Design of Piping Syste=s", M. W. Kellogg, Second Edition,1956, and "For=ulas of ' Stress and Strain", R.J. Roark, licGraw-Hill.
The dynamic analyses were checked by " Response of Structural Syste=s to Ground Shock", Shock and Structural Response, ASME, 1960, in "ADL?I?E Results of Modcl Given by Young (ADLPI?E Ref erence 4), and " Dyna =ic Behavior *of a Foundation-Like Structure", Mcchanical Independence Methods, ASME, 1953, in " Experimental verification of ADL?I?E Mod 1" (ADLPIPE Reference 3).
The ti=e history analysis was checked by a separate analytical solution.
nf the probic: given in " Analytical Methods of Vibrations," page 395, Leonard Meinovitch, "ADLPIPE Tice History Response Co= pared with a Known Solution for a Heavily Da= ped Systc= (ADL?I?E Reference 14). A ,
accond check vas cade using " Pressure Vessel and Piping 1972 Co=puter Progress Verification", ASME, 1972 (? obic= 5).
The ther=al transient analysis was verified by a separate analysis, "Tran-sient Ther=al Cradient Stresses". E. 3. Branch, Heating, Piping and Air g_ 315 W -
Arthur D Utt!c Irc
21 Transient Conditioning, Volu=c 43, 1971, pages 132-136, "ADLPIPE Ther Analysis" (Reference 15).
sn-,$ tion has The co=putation of intra and inter =odal co=ent co=ponent purpose. A been verified by a separate co=puter progrs= for that "'
report "ADLPIPE Modal Response Co=bination for Closely Spaced Modes", is '
available as ADLPIPE reference 24.
Various calculation procedures required by ASME Section III were verified in ADLPI?E ref erences 10,11, and 18 entitled "ADLPIPE Cc=putation of Bending Stress in Tees and 3 ranch Connections, ASME Section III, Class 1 Piping", "ADLPIPE Cc=putation of Resultant Mo=ents for Section III Class 2 and 3 Stresses", and "ADL?IPE Stress Co=putation of Piping Co=po-ncnts: A Cc=parison with Hand Calculations for ASSI 331 and ASME Section III."
In 1978 as independent third party revicv of ALL?I?E (Section III, Class
- 1) was perfor=ed " Verification of ADL?I?I, ASME Section III, Class 1 Piping Stress Progra=", Teladyne Engineering Services, Report No. TR-2S84-1, August 11, 1978.
ADL?I?E Develoo=ent ?olicy -
The foll: wing po..i:les have been in ef f ect during the develop =ent of ADLPIPE: - - -
~
The dctalls' of cal'cu11 tion processes < are available to- the '
~
1.
public by free distributien of operating =anuals and references.
These are tabulated in Appendix I. Each cajor new feature
.Jof ADLPI?E is docu=ented for user reviav.
Licenseer-
- 2. ' Progra= listings are =ade available to licensees.
are noc restrie cd fro =aking progrs= changer.
- 3. ADLPIPE is periodically i= proved and updated and licensces are notified of the =odificatio=s at the ti=e of the release
. of the codified version.
- 4. ADL?IPE is hand checked wherever possible. 'Jhen this is not ..
possible, ADL?IPE is checked by cxperi=cntal results or the results of other calculation proceduras. Every =odification, large or s=all, is checked. '
S. Special versions of ADL?I?E vill be written to a licensce's specification.
However, the version of ADLPIPE released to co=puter service bureaus generally does not have such special .
additions.
- 6. Old versions of ADL?IPE are not retained by Ar.thur D. Littic, Inc. Instead, beginning in 1971, all new versions of ADLPIPE vere backward integrated. The present version of ADL?I?E ,
-s- 3\o \\U ArthurD Uu!eIrc
e maintains all past features which have been =ade available to the users during the period 1971 to 1979.
'N W
I. W. Dic,.ccli
. Arthur D. t,i t tl e , Inc.
Ca= bridge, F_A 02140 April 19, 1979 m
- . ... . . - - . - - - - -
\\\
3\o .
AnhurD Uttic!nc