Issue date | Title | Topic | |
---|---|---|---|
ML20126L311 | 22 July 1985 | Provides Further Update to 840330 Submission Re Soil Erosion Control & Stabilization Projects Per Insp Rept 50-363/80-02. Revegetation of Banks of Oyster Creek Divided Into Two Portions,W/Eastern Portion Completed in 1984 | |
ML20087P553 | 2 April 1984 | Forwards Responses to 840307 Questions Re full-term OL Conversion Environ Review. Effects of Salt Drift on Land Dwelling Vertebrates & Terrestrial Environ Program Annual Rept,Mar 1978 - Feb 1979 Encl | |
ML20084M294 | 30 March 1984 | Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615 | |
ML20083P079 | 20 January 1983 | Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Soil Erosion Control Project at Barge Unloading Facility Completed | |
ML20076B833 | 4 October 1982 | Forwards Info Resolving 14 Tech Spec Open Items Discussed at 820913 meeting.Marked-up Tech Specs Encl | |
ML20062H792 | 28 July 1982 | Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/82-02.Corrective Actions:Soil Stabilization Work Began 820504 & Should Be Complete by 820830 | |
ML20003G312 | 27 February 1981 | Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Slope to Be Regraded & Contoured to Decrease Erosion Potential & Amount of Concentrated Rainwater Runoff Washing Slope | |
ML20003A813 | 5 February 1981 | Submits Fee for Class III Request Re Delay on One Fire Protection Mod | |
ML20003A904 | 4 February 1981 | Responds to NRC 810114 Ltr Re SEP Lead Topic Approach Proposed by SEP Owners Group.Licensee May Not Have Adequate Time to Comment on Safety Evaluation.Written Notification Will Be Provided to Request Addl Time | Ultimate heat sink |
ML19327A327 | 14 July 1980 | Informs That IE Bulletins,Circulars & Notices Requiring Review &/Or Response for Facility Are on Hold Due to Postponement of Const Activities.Current Action Files Maintained.Schedule of Responses Will Be Forwarded | |
ML19309D015 | 3 April 1980 | Forwards Supplementary Financial Info in Support of TMI-1 Restart Proceedings | |
ML19322E614 | 11 March 1980 | Responds to IE Bulletin 80-03 Re Visual Insps of Charcoal Adsorber Cells.Equipment of This Type Has Not Been Purchased to Date | |
ML19296E010 | 5 March 1980 | Responds to IE Bulletin 79-28 Re Replacement of Top Cover Gaskets on Stem Mounted Limit Switches.Namco EA180 Switches Not Installed in safety-related Equipment Inside or Outside Containment.Assigned Electrical Equipment Being Purchased | |
ML19294B142 | 20 February 1980 | Responds to NRC 791226 Ltr Re Estimated Evacuation Time for Plume Exposure Pathway Around Util.Evacuation Time Essentially Same as Oyster Creek,Submitted on 800131. Evacuation Time Estimate of 13.9-h Conservative | |
ML19257C171 | 28 November 1979 | Responds to NRC 791026 Ltr Re Violation Noted in IE Insp Rept 50-363/79-08.Corrective Actions:Venting of Air Bldg Per FSP-1-12,Revision 1,immediately Reinstituted.Field Personnel Instructed to Follow All Approved Procedures Until Revised | |
ML19256F270 | 14 November 1979 | Responds to IE Bulletin 79-25, Reactor Trips at Turkey Point Units 3 & 4. No Electrical Equipment Purchased W/ Installed Westinghouse Bfd Relays.Will Request Ae to Identify Type Relays If Bfd Relays Selected | |
ML19256E825 | 7 November 1979 | Requests Expansion of Environ Monitoring Program to Include Intensive Mortality Studies of Impinged & Entrained Organisms & Reduced Efforts Re Species Composition & Abundance Sampling | |
ML19210D712 | 22 October 1979 | Responds to IE Bulletin 79-24, Frozen Lines. Heat Tracing & Freeze Protection Sys Design Incomplete | |
ML19254E834 | 28 September 1979 | Responds to IE Bulletin 79-23.Emergency Diesel Generator Field Exciter Transformer Not Yet Purchased.When Equipment Is Purchased,Util Will Ensure Design & Testing Meets Items 1 & 2 of Bulletin | |
ML19249D864 | 20 September 1979 | Responds to 790821 Ltr Re QA Program for Preservation of safety-related Equipment,Components & Structures During Suspension of Const Activities.Program Will Be in Accordance W/General Requirements of QA Plan | |
ML19254E063 | 20 September 1979 | Responds to NRC 790823 Ltr Re Violations Noted in IE Insp Rept 50-363/79-07.Corrective Actions:Preventative Svc & Storage Program Procedures & QA Surveillance Program Procedures Revised | |
ML19249D520 | 24 August 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Facility Design Currently Employs Vertical Turbine Pumps in Nuclear Svc Water Sys only.As-built Vendor Data Not Yet Available | |
ML19249A498 | 30 July 1979 | Responds to IE Bulletins 79-02 & 79-02 Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Pipe Support Base Plate Designs Are Not in Use at Plant | |
ML19242C706 | 30 July 1979 | Responds to IE Bulletin 79-14 Re Seismic Analysis for as-built safety-related Piping Sys.No safety-related Piping Sys at Plant | |
ML19242A702 | 30 July 1979 | Requests Deferment of NRC Action on 780831 Request for Extension of Facility Completion Date.Financial Effects Stemming from TMI-2 Incident Will Preclude Recommencement of Const | |
ML19242B205 | 29 June 1979 | Forwards C-E 790608 Ltr Responding to IE Bulletins 78-12, 12A & 12B Re Atypical Weld Matl in Reactor Pressure Vessel Welds | |
ML19242B292 | 25 June 1979 | Responds to IE Bulletin 79-11 Re Use of Westinghouse DB-50 & DB-75 Circuit Breakers in safety-related Sys.No Circuit Breakers of This Type Have Been Purchased | |
ML19241A790 | 6 June 1979 | Responds to IE Bulletin 79-07.Version of Adlpipe Computer Program Which Includes Algebraic Summation Technique Has Been Used for Final Design of Support for Containment Spray Sys | Earthquake |
ML19246B937 | 6 June 1979 | Partially Responds to IE Bulletin 78-12B Re Atypical Weld matl.C-E Will Submit Generic Rept to NRC by 790608.Final Response Will Be Provided by 790629 | |
ML19242B420 | 29 May 1979 | Responds to IE Bulletin 79-03 Re Weld Defects in 304 or 312 Stainless Steel Pipe Spools.Spools Used in Containment Penetrations M-43 & M-44.Corrective Actions:Welds Radiographed & Defects Repaired | |
ML19289F457 | 1 May 1979 | Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Purchased to Date | |
ML19289F458 | 1 May 1979 | Responds to IE Bulletin 79-04.Swing Check Valves Not Installed in Facility | |
ML19289F614 | 20 April 1979 | Responds to NRC 790312 Ltr Re Violations Noted in IE Insp Rept 50-363/79-02.Corrective Actions:Initiation of Program for Daily Monitoring of Equipment Pressurized W/Inert Gas | |
ML19289F206 | 15 March 1979 | Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Rept 50-363/78-15.Corrective Actions:Theodolite Was Serviced & Two Tachometers Sent for Recalibr | |
ML19274D890 | 16 January 1979 | Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Repts 50-363/78-15.Corrective Actions:Equipment Was Recalibr & Validating Test Data Taken Following Expiration Date | |
ML19270F210 | 20 December 1978 | Responds to NRC 781116 Ltr Re Violation Noted in IE Insp Rept 50-363/78-13.Corrective Actions:Procedure for Placement & Curing of Concrete Revised to Include Quantitative & Qualitative Acceptance Criteria | |
ML20147C123 | 13 November 1978 | Responds to 781017 NRC Ltr Re Violation Noted in Inspec Rept 50-363/78-12.Corrective Actions:Personnel Reinspected & Retested;Inspector Assigned to Inspect Status of Concrete Curing | |
ML20150B679 | 25 September 1978 | Responds to 780822 NRC Ltr Re Violations Noted in Inspec Rept 50-363/78-10.Corrective actions:3 Training Sessions Have Been Held w/Morrison-Knudsen Quality Dept Addressing Areas of Violation | |
ML20049A113 | 31 August 1978 | Requests Extension of Earliest & Lastest Completion Dates for CPPR-96 from 770404 to 781004 & 830201 to 850201, Respectively |