 Issue dateTitleTopic
ML20126L31122 July 1985Provides Further Update to 840330 Submission Re Soil Erosion Control & Stabilization Projects Per Insp Rept 50-363/80-02. Revegetation of Banks of Oyster Creek Divided Into Two Portions,W/Eastern Portion Completed in 1984
ML20087P5532 April 1984Forwards Responses to 840307 Questions Re full-term OL Conversion Environ Review. Effects of Salt Drift on Land Dwelling Vertebrates & Terrestrial Environ Program Annual Rept,Mar 1978 - Feb 1979 Encl
ML20084M29430 March 1984Updates 820728 Response to NRC Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions: Stabilization & Revegetation of Dredge Spoil Slope North of Firepond Completed on 830615
ML20083P07920 January 1983Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Soil Erosion Control Project at Barge Unloading Facility Completed
ML20076B8334 October 1982Forwards Info Resolving 14 Tech Spec Open Items Discussed at 820913 meeting.Marked-up Tech Specs Encl
ML20062H79228 July 1982Responds to NRC Ltr Re Violations Noted in IE Insp Rept 50-363/82-02.Corrective Actions:Soil Stabilization Work Began 820504 & Should Be Complete by 820830
ML20003G31227 February 1981Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Rept 50-363/80-02.Corrective Actions:Slope to Be Regraded & Contoured to Decrease Erosion Potential & Amount of Concentrated Rainwater Runoff Washing Slope
ML20003A8135 February 1981Submits Fee for Class III Request Re Delay on One Fire Protection Mod
ML20003A9044 February 1981Responds to NRC 810114 Ltr Re SEP Lead Topic Approach Proposed by SEP Owners Group.Licensee May Not Have Adequate Time to Comment on Safety Evaluation.Written Notification Will Be Provided to Request Addl TimeUltimate heat sink
ML19327A32714 July 1980Informs That IE Bulletins,Circulars & Notices Requiring Review &/Or Response for Facility Are on Hold Due to Postponement of Const Activities.Current Action Files Maintained.Schedule of Responses Will Be Forwarded
ML19309D0153 April 1980Forwards Supplementary Financial Info in Support of TMI-1 Restart Proceedings
ML19322E61411 March 1980Responds to IE Bulletin 80-03 Re Visual Insps of Charcoal Adsorber Cells.Equipment of This Type Has Not Been Purchased to Date
ML19296E0105 March 1980Responds to IE Bulletin 79-28 Re Replacement of Top Cover Gaskets on Stem Mounted Limit Switches.Namco EA180 Switches Not Installed in safety-related Equipment Inside or Outside Containment.Assigned Electrical Equipment Being Purchased
ML19294B14220 February 1980Responds to NRC 791226 Ltr Re Estimated Evacuation Time for Plume Exposure Pathway Around Util.Evacuation Time Essentially Same as Oyster Creek,Submitted on 800131. Evacuation Time Estimate of 13.9-h Conservative
ML19257C17128 November 1979Responds to NRC 791026 Ltr Re Violation Noted in IE Insp Rept 50-363/79-08.Corrective Actions:Venting of Air Bldg Per FSP-1-12,Revision 1,immediately Reinstituted.Field Personnel Instructed to Follow All Approved Procedures Until Revised
ML19256F27014 November 1979Responds to IE Bulletin 79-25, Reactor Trips at Turkey Point Units 3 & 4. No Electrical Equipment Purchased W/ Installed Westinghouse Bfd Relays.Will Request Ae to Identify Type Relays If Bfd Relays Selected
ML19256E8257 November 1979Requests Expansion of Environ Monitoring Program to Include Intensive Mortality Studies of Impinged & Entrained Organisms & Reduced Efforts Re Species Composition & Abundance Sampling
ML19210D71222 October 1979Responds to IE Bulletin 79-24, Frozen Lines. Heat Tracing & Freeze Protection Sys Design Incomplete
ML19254E83428 September 1979Responds to IE Bulletin 79-23.Emergency Diesel Generator Field Exciter Transformer Not Yet Purchased.When Equipment Is Purchased,Util Will Ensure Design & Testing Meets Items 1 & 2 of Bulletin
ML19249D86420 September 1979Responds to 790821 Ltr Re QA Program for Preservation of safety-related Equipment,Components & Structures During Suspension of Const Activities.Program Will Be in Accordance W/General Requirements of QA Plan
ML19254E06320 September 1979Responds to NRC 790823 Ltr Re Violations Noted in IE Insp Rept 50-363/79-07.Corrective Actions:Preventative Svc & Storage Program Procedures & QA Surveillance Program Procedures Revised
ML19249D52024 August 1979Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Facility Design Currently Employs Vertical Turbine Pumps in Nuclear Svc Water Sys only.As-built Vendor Data Not Yet Available
ML19249A49830 July 1979Responds to IE Bulletins 79-02 & 79-02 Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Pipe Support Base Plate Designs Are Not in Use at Plant
ML19242C70630 July 1979Responds to IE Bulletin 79-14 Re Seismic Analysis for as-built safety-related Piping Sys.No safety-related Piping Sys at Plant
ML19242A70230 July 1979Requests Deferment of NRC Action on 780831 Request for Extension of Facility Completion Date.Financial Effects Stemming from TMI-2 Incident Will Preclude Recommencement of Const
ML19242B20529 June 1979Forwards C-E 790608 Ltr Responding to IE Bulletins 78-12, 12A & 12B Re Atypical Weld Matl in Reactor Pressure Vessel Welds
ML19242B29225 June 1979Responds to IE Bulletin 79-11 Re Use of Westinghouse DB-50 & DB-75 Circuit Breakers in safety-related Sys.No Circuit Breakers of This Type Have Been Purchased
ML19241A7906 June 1979Responds to IE Bulletin 79-07.Version of Adlpipe Computer Program Which Includes Algebraic Summation Technique Has Been Used for Final Design of Support for Containment Spray SysEarthquake
ML19246B9376 June 1979Partially Responds to IE Bulletin 78-12B Re Atypical Weld matl.C-E Will Submit Generic Rept to NRC by 790608.Final Response Will Be Provided by 790629
ML19242B42029 May 1979Responds to IE Bulletin 79-03 Re Weld Defects in 304 or 312 Stainless Steel Pipe Spools.Spools Used in Containment Penetrations M-43 & M-44.Corrective Actions:Welds Radiographed & Defects Repaired
ML19289F4571 May 1979Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Purchased to Date
ML19289F4581 May 1979Responds to IE Bulletin 79-04.Swing Check Valves Not Installed in Facility
ML19289F61420 April 1979Responds to NRC 790312 Ltr Re Violations Noted in IE Insp Rept 50-363/79-02.Corrective Actions:Initiation of Program for Daily Monitoring of Equipment Pressurized W/Inert Gas
ML19289F20615 March 1979Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Rept 50-363/78-15.Corrective Actions:Theodolite Was Serviced & Two Tachometers Sent for Recalibr
ML19274D89016 January 1979Responds to NRC 781214 Ltr Re Violations Noted in IE Insp Repts 50-363/78-15.Corrective Actions:Equipment Was Recalibr & Validating Test Data Taken Following Expiration Date
ML19270F21020 December 1978Responds to NRC 781116 Ltr Re Violation Noted in IE Insp Rept 50-363/78-13.Corrective Actions:Procedure for Placement & Curing of Concrete Revised to Include Quantitative & Qualitative Acceptance Criteria
ML20147C12313 November 1978Responds to 781017 NRC Ltr Re Violation Noted in Inspec Rept 50-363/78-12.Corrective Actions:Personnel Reinspected & Retested;Inspector Assigned to Inspect Status of Concrete Curing
ML20150B67925 September 1978Responds to 780822 NRC Ltr Re Violations Noted in Inspec Rept 50-363/78-10.Corrective actions:3 Training Sessions Have Been Held w/Morrison-Knudsen Quality Dept Addressing Areas of Violation
ML20049A11331 August 1978Requests Extension of Earliest & Lastest Completion Dates for CPPR-96 from 770404 to 781004 & 830201 to 850201, Respectively