MONTHYEARLIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With LIC-98-0105, Monthly Operating Rept for July 1998 for Fort Calhoun Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fort Calhoun Station LIC-98-0092, Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fort Calhoun Station,Unit 1 LIC-98-0078, Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fort Calhoun Station Unit 1 LIC-98-0070, Monthly Operating Rept for Apr 1998 for Ft Calhoun Station1998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Ft Calhoun Station LIC-98-0058, Monthly Operating Rept for Mar 1998 for Fcs,Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fcs,Unit 1 LIC-98-0035, Monthly Operating Rept for Feb 1998 for Fcs,Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fcs,Unit 1 LIC-98-0016, Monthly Operating Rept for Jan 1998 for Fort Calhoun Station1998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fort Calhoun Station LIC-98-0002, Monthly Operating Rept for Dec 1997 for Fcs,Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fcs,Unit 1 LIC-97-0191, Monthly Operating Rept for Nov 1997 for Fcs,Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fcs,Unit 1 LIC-97-0179, Monthly Operating Rept for Oct 1997 for Fcs,Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Fcs,Unit 1 LIC-97-0163, Monthly Operating Rept for Sept 1997 for Fcs,Unit 11997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Fcs,Unit 1 LIC-97-0149, Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 11997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Fort Calhoun Station Unit 1 LIC-97-0137, Monthly Operating Rept for Jul 1997 for Fort Calhoun Station1997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Fort Calhoun Station LIC-97-0115, Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 11997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Fort Calhoun Station,Unit 1 ML20148L9291997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Fort Calhoun Station Unit 1 LIC-97-0081, Monthly Operating Rept for April 1997 for FCS1997-04-30030 April 1997 Monthly Operating Rept for April 1997 for FCS LIC-97-0054, Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 11997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Fort Calhoun Station Unit 1 ML20136G5911997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Fort Calhoun Station ML20134M4281997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Fort Calhoun Station Unit 1 LIC-97-0002, Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 11996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 ML20134M4341996-12-31031 December 1996 Revised Monthly Operating Rept for Dec 1996 for Fort Calhoun Station Unit 1 LIC-96-0196, Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 11996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Fort Calhoun Station Unit 1 LIC-96-0174, Monthly Operating Rept for Oct 1996 for FCS Unit 11996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for FCS Unit 1 LIC-96-0152, Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 11996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Fort Calhoun Station Unit 1 LIC-96-0134, Monthly Operating Rept for Aug 1996 for Fort Calhoun Station1996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Fort Calhoun Station LIC-96-0113, Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 11996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Fort Calhoun Station Unit 1 LIC-96-0096, Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 11996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Fort Calhoun Station Unit 1 LIC-96-0084, Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 11996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Fort Calhoun Station Unit 1 ML20117G0821996-04-30030 April 1996 Monthly Operating Rept for April 1996 for FCS ML20117G0841996-03-31031 March 1996 Revised MOR for March 1996 for FCS LIC-96-0036, Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 11996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Calhoun Station,Unit 1 LIC-96-0016, Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 11996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Fort Calhoun Station Unit 1 LIC-96-0004, Monthly Operating Rept for Dec 1995 for Fort Calhoun Station1995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Fort Calhoun Station LIC-95-0233, Monthly Operating Rept for Nov 1995 for FCS Unit 11995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for FCS Unit 1 ML20093G7571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Fort Calhoun Station Unit 1 LIC-95-0172, Monthly Operating Rept for Aug 1995 for Fort Calhoun Station1995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Fort Calhoun Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B5401999-10-0606 October 1999 Safety Evaluation Supporting Amend 193 to License DPR-40 ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data LIC-99-0096, Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fcs,Unit 1.With ML20211J9321999-09-0202 September 1999 Safety Evaluation Concluding That Licensee Proposed Alternatives Provide Acceptable Level of Quality & Safety. Proposed Alternatives Authorized for Remainder of Third ten- Yr ISI Interval for Fort Calhoun Station,Unit 1 LIC-99-0084, Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fort Calhoun Station.With ML20216E6431999-08-26026 August 1999 Rev 19 to TDB-VI, COLR for FCS Unit 1 ML20210R1961999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fcs,Unit 1 ML20210G2181999-07-27027 July 1999 Safety Evaluation Supporting Amend 192 to License DPR-40 ML20210D9951999-07-22022 July 1999 Safety Evaluation Supporting Amend 191 to License DPR-40 ML20216E6361999-07-21021 July 1999 Rev 18 to TDB-VI, COLR for FCS Unit 1 ML20210R2081999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Fcs,Unit 1 LIC-99-0065, Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fort Calhoun Station,Unit 1.With ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20210P5461999-06-0808 June 1999 Rev 0,Vols 1-5 of Fort Calhoun Station 1999 Emergency Preparedness Exercise Manual, to Be Conducted on 990810. Pages 2-20 & 2-40 in Vol 2 & Page 4-1 in Vol 4 of Incoming Submittal Not Included ML20195B4581999-05-31031 May 1999 Rev 3 to CE NPSD-683, Development of RCS Pressure & Temp Limits Rept for Removal of P-T Limits & LTOP Requirements from Ts ML20207H7401999-05-31031 May 1999 Performance Indicators Rept for May 1999 LIC-99-0053, Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 11999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fort Calhoun Station,Unit 1 ML20195B4521999-05-17017 May 1999 Technical Data Book TDB-IX, RCS Pressure - Temp Limits Rept (Ptlr) ML20206L4241999-05-10010 May 1999 Safety Evaluation Supporting Corrective Actions to Ensure That Valves Are Capable of Performing Intended Safety Functions & OPPD Adequately Addressed Requested Actions Discussed in GL 95-07 ML20206M2601999-05-0606 May 1999 SER Concluding That Licensee IPEEE Complete Re Info Requested by Suppl 4 to GL 88-20 & IPEEE Results Reasonable Given FCS Design,Operation & History LIC-99-0047, Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fort Calhoun Station Unit 1.With ML20195E8621999-04-30030 April 1999 Performance Indicators, for Apr 1999 ML20205Q5831999-04-15015 April 1999 Safety Evaluation Supporting Amend 190 to License DPR-40 ML20210J4331999-03-31031 March 1999 Changes,Tests, & Experiments Carried Out Without Prior Commission Approval for Period 981101-990331.With USAR Changes Other than Those Resulting from 10CFR50.59 ML20206G2641999-03-31031 March 1999 Performance Indicators Rept for Mar 1999 LIC-99-0034, Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fcs,Unit 1.With ML20205J8181999-02-28028 February 1999 Performance Indicators, for Feb 1999 LIC-99-0025, Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fort Calhoun Station,Unit 1.With ML20207F3291999-01-31031 January 1999 FCS Performance Indicators for Jan 1999 ML20203B0991998-12-31031 December 1998 Performance Indicators for Dec 1998 LIC-99-0026, 1998 Omaha Public Power District Annual Rept. with1998-12-31031 December 1998 1998 Omaha Public Power District Annual Rept. with LIC-99-0003, Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fort Calhoun Station.With ML20198S3771998-12-31031 December 1998 Safety Evaluation Supporting Amend 189 to License DPR-40 ML20198S4831998-12-31031 December 1998 Safety Evaluation Supporting Amend 188 to License DPR-40 ML20196G2251998-12-18018 December 1998 Rev 2 to EA-FC-90-082, Potential Over-Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment ML20198M3141998-11-30030 November 1998 Performance Indicators Rept for Nov 1998 LIC-98-0172, Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fort Calhoun Station,Unit 1.With LIC-98-0160, Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated1998-11-25025 November 1998 Special Rept:On 981113,MSL RM RM-064 Was Declared Inoperable Due to Leakage Past Isolation Valve HCV-922.Troubleshooting Has Indicated That Leakage Has Stopped & Cause of Leak Continues to Be Investigated ML20203B0721998-11-16016 November 1998 Rev 6 to HI-92828, Licensing Rept for Spent Fuel Storage Capacity Expansion ML20196E4981998-10-31031 October 1998 Performance Indicators Rept for Oct 1998 ML20196G2441998-10-31031 October 1998 Changes,Tests & Experiments Carried Out Without Prior Commission Approval. with USAR Changes Other than Those Resulting from 10CFR50.59 LIC-98-0154, Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fort Calhoun Station,Unit 1.With ML20154M4881998-10-19019 October 1998 Safety Evaluation Supporting Amend 186 to License DPR-40 ML20154N2411998-10-19019 October 1998 Safety Evaluation Supporting Amend 187 to License DPR-40 LIC-98-0136, Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fort Calhoun Station,Unit 1.With ML20155G4261998-09-30030 September 1998 Performance Indicators for Sept 1998 ML20154A1251998-08-31031 August 1998 Performance Indicators, Rept for Aug 1998 LIC-98-0122, Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fort Calhoun Station Unit 1.With ML20238F7231998-08-17017 August 1998 Owner'S Rept for Isis ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency 1999-09-30
[Table view] |
Text
. >
AVERAGE DAILY UNIT POWER LEVEL s DOCKET NO. 50-285 UNIT Fort Calhoun DATE Octnhor 10. 1979 COMPLETED BY B. J. Hickle TELEPl!ONE 402-536-441)_
MONTil September, 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 47A 7 17 436.1 2 427.9 18 435.2 3 429.7 19 435.6 4 427 0 20 435.7 5 426.7 21 435.4 6 427.1 22 436.8 7 ,
42R.5 23 436.9 8 428.7 24 437.6 9 411 I .25 415.7 10 411 R 26 414 7 11 dan A 27 454.9 12 431.3 28 433.8 13 434.1 29 434.1 14 416 4 30 433.2 15 435.7 3g 16 415 7 INSTRUCTIONS On this format. list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
1154 149 WI77) 7910160
OPERATING DATA REPORT DOCKET NO. 50-285 DATE October 10, 1979 CONIPLETED BY B. J. Hickle TELEP110NE 402-536-4413 OPERATING STATUS Fort Calhoun Station Unit No. 1 N"te5
- 1. Unit Name:
- 2. Reporting Period. September, 1979
- 3. Licensed Thermal Power (51Wt): ___l420
- 4. Nameplate Rating (Gross SIWE): 502
- 5. Design Electrical Rating (Net 51We): 457
- 6. Stasimum Dependable Capacity (Gross 51We): 48l
- 7. 51asimum Dependable Capacity (Net alWe): 457
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted. lf Any (Net 51We): N/A
- 10. Reasons For Restrictions.If Any: N/A This 51onth Yr..to Date Cumulative II. Ilours in Reporting Period 720.0 6_551.0 '52.728.0
- 12. Number Of flours Reactor Was Critical 720.0 6.506.5 42,471.5
- 13. Reactor Reserve Shutdown flours 0.0 0.0 1.136.0
- 14. liours Generator On-Line 720.0 6,466.5 41,532.6
- 15. Unit Resene Shutdown flours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (51Wil) 1.013.878.5 8.936,526.3 50,584,949.6 .
- 17. Grow Electrical Energy Generated (51Wil) 327&_M _. 2.980.059.9 16.784.321.6 Iti. Net Electrical Energy Generated (31Wil) 311.612.1 2,833,379.5 15,854,785.2
- 19. Unit Senice Factor 100.0 98.7 78.8
- 20. Unit Availability Factor 100.d _ 98.7 78.8
- 21. Unit Capacity Factor (Using SIDC Net) 44 7 44_6 66.4
- 22. Unit Capacity Factor (Using DER Net) 94.7 94.6 65.8
- 23. Unit Forced Outage Rate 0.0 1_3 4.4
- 24. Shutdowns Scheduled Oser Next 6 51onths (Type. Date.and Duration of Each):
.lanuary 1. 1980 - Refueling Outage - Two Month Duration October 26, 1979 - Inspection of S.G. to Piping Welds - Approximately Ten Days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: _J /A
- 26. Units in Test Status lPrior to Commercial 0peration): Forecast Achiesed INilI A L CRITICA LITY IN111AL ELECTRICITY CO\1\1ERCI AL OPER ATION 11$.1 i50 <"/77)
jDr . h e -
6a m, m. .
Z vsm "r
c,
- 2. R :z E. o-n 9 a m a 2
n u
=.O. m. m.c. o. m. >. x Ty.pe 1
- c c>.
o.o 2 ooa x x r.m wc=
sif 2 3 O T c 5' E. S
- gEag5g E 5' E z;- 2. g'3 Durat. ion 4 . D -4 Q " g E
-- (Hours)
S ' r,7' E. x *T
" " 3. 0 5. E:
~E S E. HC vg 2a Reason 3
.x
.o.-
r.ac c.
m
.x o
E. 6 Er Method of E 5 Shutting E ghD Down Reactor 3 :'i 6M
!- x C 0- m m -4 E- x r- o e
= o 4cn75' o x
A t Eg v 2 a a o "
x z >
dr 2 w c
- gv m @
P""~E System @ x
@i E E O.
3 3 0 Code 4 g 5 5 3
ME C/) C 5 8' Q Component - C
-mu n "aB 3- e Code 5 e" d o
2 m
O S
y -g o e < c *4 m *'3 0 en- n
=>a e rFm Z E
~*
= ~ m"c.E ~CS u MN x m,3 E qH m n 3-3uO -
xO n -
- e. me o C >oh2H m cat
=
" m C.
c" Q g bComm MF9N xEC. .
C
e
- " awe e c- o c+ N r.
4 T3 LE G3* U, W
e CT O O U1 CD
- C,r. _I. 1 Cu b O " 3 0 4 7'" OO
% ~ -a C m W G 3 O
^
c" N
. e g
Refueling Infornution Fort Calhoun - Unit No. 1 -
Report for the nonth ending September 30. 1979. .
- 1. Scheduled date for next refueling shutdown. - January 1, 1980
- 2. Scheduled date for restart following refueling. March 1, 1980
- 3. Will refueling or resunption of operation thereaf ter require a technical specification change or other license anund: Tent? Yes
- a. If answer is yes, what, in general, will these be?
Stretching power to 1500 fiWth is planned in conjunction with the change in fuel supplier to Exxon.
- b. If answer is no, has the reload fuel design and core configuration been revieaed by your Plant Safety Review Comnittee to deter-mine whether any unreviewed safety questions are associated with the core reload.
- c. If no such review has taken place, when is it scheduled? -
Stretch Power Application
- 4. Scheduled date(s) for submitting proposed licensing -Site Related Information, action and support formation. July, 1979 - Submitted
-Core Related Analysis
- 5. Inportant licensi. 3 considerations associated with and Tech. Spec. Changes, refueling, e.g., new or different fuel design or November, 1979 supplier, unreviewed design or performance analysis nothods, significant changes in fuel design, nea operating procedures.
First use of Exxon fuel in Fort Calhoun.
Stretching power from 1420 filth to 1500 fUth.
- 6. The nu:rber of fuel assenblies: a) in the core 133 assemblies b) in the spent fuel pool 157 c) spent fuel pool storage capacity 483 d) planned spent fuel pool "
storage capacity 483
- 7. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity. 1985 Prepared by '
M_ Date October 3,1979
/ .
llS4 152
CMAHA PUBLIC POWER DISTRICT Fort Calhoun Station Unit No, 1 September 1979 Monthly' Operations Report I. OPERATIONS
SUMMARY
Fort Calhoun operation continued at essentially 100% power for the month of September. No significant power reductions occurred during the =onth of September.
The change to ec=plete six shift operation was completed durin6 the conth of September. This change vil] allow the entire shift to devote one week in six to training.
Preparations for a potential unit outage in late October continued.
The operations staff participated in the review of fire protection todifications, response to several NRC information requests and the implementation of Three Mile Island reco==endations.
A Nuclear Regulatory Cor: mission audit was conducted during Septe=ber with no ite=s of nonec=pliance identified in the operations area.
The employ =ent of a fire watch team made up of part-time personnel is continuing with the tre.ining of initial fire watch team members to begin in early October.
Fort Calhoun operations is participating in radiation protection refresher courses during the month of September.
A. PERFORMANCE CHARACTERISTICS LER Number Deficiency NONE B. CHRIGES IN CPERATING METHODS NONE C. RESULTS OF SURVEILLANCE TESTS AND INSPECTIONS Surveillance tests as required by the Technical Specifications Section 3.0 and Appendix B, vere performed in accordance with the ennual surveillance test schedule. The following is a su==ary of the surveillance tests which results in Operations Incidents and are not reported elsewhere in the report:
Operations Incident Deficiency OI-839 ST-ERM Lost = ilk sa=ples J J sc ,4 c
is3
, 8 Monthly Operations Report September 1979 Page Two E CHANGES, TESTS AND EXPERIMENTS CARRIED OUT WITHOUT COMMISSION APPROVAL Procedure Description MR FC-78-52A Site Cc=pletion Report for Halon System for Control Room Walk-in Cabinet / completed as designed.
SP-FAUD-1 Fuel Assembly Uplift Detection Test - c11 loopa indicate sufficient assurance of re-quired dowward force on fuel assemblies.
SP-VA-80 Hydrogen Purge System Test - operability of the Hydrogen Purge System verified.
SP-RPS-5 Excore Detector Sy= metric Offset Recalibration/
all results nor=al.
MR FC-79-13 Warehouse Sprinkler Addition / completed as designed.
M.0. 1661 EHC Jumper to eliminate trip on loss of 125 V.D.C./ completed as designed.
M.0. 65 Ground PR's/ completed as designed.
E. RESULTS OF IZAK RATE TESTS NCNE F. CHANGES IN PLANT OPERATING STAFF NONE G. TRAINING Training included operations training on radiation protection at Fort Calhoun Station, vaste disposal, potable water and emer6ency procedures. Plant maintenance received training on vaste disposal systems and packaging and solenoid valve training. Radiation protection classes vere held for District personnel and contract personnel .
H. CHANGES, ."C'"3 AND EXPERIEITS REQUIRING NUCLEAR REGULATORY COMMISSICN AUTHORIZATION PURSUANT TO 10CFR50.59 NONE } ".
\ \ f Approved by
{'
Wt-Uv\ C
)
anager-Fort Calhoun Station irs 4 iS4
Menthly Operations Report September 1979 Page Three II. MAIITE'iMICE (Significant Safety Related)
I M. O. # Date i Description '
Ccrrective Action 20622 9-11-79 FH-12 Adjust and inspect trolley /
bridge drive 1612 9-13-79 CH hA Bottle oiler on the pump is Replaced oil seals leaking 2009 9-18-79 CH-1B Packing Leak Replace packing 1998 9-17-79 RWH-86, RWH-97 has 1cose clevis Tightened one elevis and shortened the other.
1999 9-17-79 RWH-100 nissing 1/2" nut on Replaced nut clevis IiS4 i55