Category:CORRESPONDENCE-LETTERS
MONTHYEARML20195J1741988-11-29029 November 1988 Provides Supplemental Response to Violations Noted in Insp Rept 50-518/87-01.Corrective Actions:Completion of Procedure on Prescribing Preventive Maintenance Requirements Rescheduled for 890301 ML20151E7511988-07-14014 July 1988 Responds to NRC Re Violations Noted in Insp Repts 50-518/87-01 & 50-520/87-01.Corrective Actions:Reviewed Vendors Storage & Preventive Maint Instructions Against Tech Spec 01.00.15.14.03 & Revised Topical Rept TVA-TR75-1A ML20150B9001988-03-0101 March 1988 Forwards Insp Rept 50-518/87-01 on 871216-18 & Notice of Violation.Allegation Partially Substantiated.Problem Re Practice of Allowing Nuclear safety-related Equipment to Be Downgraded & Moved Out of Storage to Weather Revealed ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML20211K5531986-12-0303 December 1986 Partial Response to FOIA Request for Records from Vendor Insp Branch,Ie,Re Tdi.Documents Identified in App C Available in Pdr.Documents in App D Available in PDR Under FOIA Number 86-656 & Requester Name ML20205F7571986-08-0808 August 1986 Forwards Insp Repts 50-518/86-01 & 50-520/86-01 on 860717- 18.No Violations or Deviations Noted ML20206H8001986-06-0909 June 1986 Forwards Request for Addl Info Required to Complete Review of Site Stablilzation Plan.Site Visit Requested 2 Wks After Receipt of Response ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20133N7321985-10-24024 October 1985 Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings ML18029A3981985-02-27027 February 1985 Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees ML20096F8471984-09-0505 September 1984 Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence ML20093F0921984-05-22022 May 1984 Responds to NRC Re Violations Noted in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Matl & Equipment Will Be Maintained Per Requirement Documents & Permanent Structures Will Be Thoroughly Inspected Annually ML20090B3551984-05-22022 May 1984 Forwards Response to Unresolved Items in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Util Prepared Preventive Maint Document Establishing Guidance for Protection,Preservation & Periodic Insp of Matls ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20073S8591983-05-0505 May 1983 Forwards Details of Deferral Plans for Hartsville Nuclear Plant A. Yellow Creek Plan Submittal Delayed Until 830513 ML20071B9741983-02-24024 February 1983 Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506 ML20069Q3661982-11-30030 November 1982 Forwards Socioeconomic Monitoring & Mitigation Rept, & Const Employee Monitoring Errata Rept ML20065S3791982-10-26026 October 1982 Informs of Discussions Re Leasing Portions of Site to Lansdowne Steel & Iron Co for 10 Yrs.Description of Site Portions Under Consideration Encl.Cp for Sites Withdrawn ML20065F8371982-09-13013 September 1982 Forwards Response to NRC Re Violations Noted in IE Insp Repts 50-518/82-08 & 50-520/82-08.Corrective Actions:Qc Investigation Rept Written to Prevent Use of Protective Coatings & PVC Conduit Covered & Stored ML20069D5161982-09-10010 September 1982 Forwards Socioeconomic Monitoring & Mitigating Rept,Sept 1981 ML20055C0611982-08-0606 August 1982 Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors ML20062H7541982-07-16016 July 1982 Forwards IE Insp Repts 50-518/82-09,50-519/82-08, 50-520/82-09 & 50-521/82-08 on 820601-04 & 28-30.No Noncompliance Noted ML20054M2121982-06-29029 June 1982 Responds to Appeal Re Denial of FOIA Request for Documents Re Atlas Machine & Iron Works,Inc.Forwards Me Resner 811109 & 820113 Memos to File ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20055A1061982-06-17017 June 1982 Forwards IE Insp Repts 50-518/82-07,50-519/82-07, 50-520/82-07 & 50-521/82-07 on 820503-14 & 21-28.No Noncompliance Noted ML20054D6501982-02-19019 February 1982 Submits Final Response Re IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Westinghouse Type Switches Used in Facilities ML20041C1091982-02-18018 February 1982 Forwards Hartsville Nuclear Plants Socioeconomic Monitoring & Mitigation Rept,Hnp SMR-10,810331, as Required by Cps. Continuing Info Will Be Provided on Semiannual Basis ML20040E8381982-01-0606 January 1982 Ack Receipt of IE Insp Repts 50-518/81-20,50-519/81-20, 50-520/81-20 & 50-521/81-20.Corrective Actions:Insp & Const Personnel Instructed to Begin Lightly Scarifying Layers on All Backfill ML20040C1361981-12-29029 December 1981 Responds to NRC 811117 Ltr Re Violations Noted in IE Insp Repts 50-518/81-18,50-519/81-18,50-520/81-18 & 50-521/81-18. Corrective Actions:Preventive Maint Requirements for RHR Pumps Will Be Performed Quarterly ML20039A2811981-12-0404 December 1981 Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl ML20040C2651981-11-16016 November 1981 Submits Final Response to IE Bulletin 81-02,Suppl 1,re Potentially Deficient Valves.No Subj Valves Installed at Plants ML20010H3481981-08-14014 August 1981 Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 ML20010A3291981-07-30030 July 1981 Forwards HNP SMR - 9, Socioeconomic Monitoring & Mitigation Rept for Apr-Sept 1980 ML20009G3291981-07-23023 July 1981 Submits Final Response to IE Bulletin 80-21,per NRC 801106 Ltr.Ge & Valve Vendors Indicate No safety-related Valves Have Parts Mfg by Malcolm Foundry Co,Inc ML20009E9871981-07-21021 July 1981 Advises That Planned Start of Excavation for Intake & Discharge in Cumberland River Will Be Delayed Until Aug 1982,per Attachment C of CP ML20009G1271981-07-15015 July 1981 Interim Deficiency Rept Re High Pressure Core Spray Component Wiring Discrepancies.Corrective Action Date for Hardware & Software Will Be 810730 Instead of 810630. Revised Vendor Drawings Have Not Been Received ML20009D7321981-07-0808 July 1981 Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Deficient Valves Are Being Supplied for Use at Facility.Addl Rept Will Be Provided by 811016 ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20009G7571981-07-0606 July 1981 Responds to NRC 810604 Ltr Re Violations Noted in IE Insp Repts 50-518/81-08,50-519/81-08,50-520/81-08 & 50-521/81-08. Corrective Actions:Procedure Revised to Include Requirement for Writing Notification of Change Rept within Three Days ML20009A4881981-07-0202 July 1981 Forwards Info Re Implementation of NUREG-0313,Revision 1,in Response to NRC 810226 Ltr.Addl Info for Hartsville & Phipps Bend Will Be Provided in Respective FSARs Tentatively Scheduled for Sept 1983 Submittal ML20009D9461981-06-15015 June 1981 Submits Third Interim Response to IE Bulletin 80-20 Re Failure of Westinghouse W-2 Control Switches.Work Continuing W/Westinghouse on Resolution of Control Switches. GE Collecting Requested Info.Final Rept Ready by 810814 ML20004E9381981-05-27027 May 1981 Submits Second Interim Response to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No Valves W/Vendor Parts Found at Plants.Final Rept,Including GE Input on NSSS Valves, Will Be Filed by 810731 ML20126L0161981-05-22022 May 1981 Forwards Addl Info Re Flammability of Suspended Ceiling Tile in Control Rooms & Replacement Panels to Be Used at Browns Ferry.Interim Rept on Hartsville & Phipps Bend Sent 810114. Info Constitutes Final Response to ML20004E6281981-05-22022 May 1981 Responds to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Mods Will Be Enriched on Engineering Change Notifications to Improve Visual Identifications ML20004E7121981-05-22022 May 1981 Forwards Final Supplemental Response to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Mod to Be Encircled on ECN to Improve Visual Identification of Affected Change Areas ML19346A1151981-05-15015 May 1981 Responds to NRC 810320 Ltr Re Violations Noted in IE Insp Repts 50-518/81-04,50-519/81-04,50-520/81-04 & 50-521/81-04. Corrective Actions:Qcirs Will Be Reviewed & Upgraded as Required & Audit Will Be Conducted by QA Unit ML19346A1161981-04-17017 April 1981 Responds to NRC 810320 Ltr Re Violations Noted in IE Insp Repts 50-518/81-04,50-519/81-04,50-520/81-04 & 50-521/81-04. Corrective Actions:Welders Restricted to Limits of Qualifications ML19347E0911981-04-0303 April 1981 Forwards Justification for Delay in Meeting 821001 Date for Having Operational Upgraded Emergency Response Facility,As Required by Item III.A.1.2 of NUREG-0737.Response for Hartsville & Phipps Bend Will Be Provided by 811009 ML19347E0051981-04-0101 April 1981 Forwards Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Valcor Valves Cited in Bulletin Are Not in Use at Plants 1988-07-14
[Table view] Category:EXTERNAL CORRESPONDENCE
MONTHYEARML20062J3091980-10-0101 October 1980 Forwards Hartsville Nuclear Plant Primary Water Quality Monitoring Rept ML19312D8621980-04-23023 April 1980 Comments on TVA Decision to Remove Impact Mitigation Program from General Manager Ofc to Community Development Ofc.Requests Return of TVA Hartsville Program Coordinator to Ofc of General Manager.Cites Legal Obligation of Fes ML19257D5261980-01-18018 January 1980 Forwards NPDES Permit Mod for facility,791108 Ltr Requesting State Certification Be Incorporated Into Modified Permit & 781221 Ltr Issuing State Certification ML19208D4271979-09-18018 September 1979 Forwards EPA & Tn Dept of Public Health Joint Public Notice Announcing Mod of NPDES Permit Application ML19208A0111979-09-0707 September 1979 Forwards Draft NPDES-TN0027740 Intended for Issuance Per Federal Water Pollution Control Act,As Amended ML20148B1661978-10-0505 October 1978 Advises That Div of Water QC Will Issue Certificate of Natl Pollution Discharge Elimination Sys Permit Subj to Certain Qualifying Conditions Re Discharge Limitations & Monitoring Requirements 1980-04-23
[Table view] Category:EXTERNAL LETTERS ROUTED TO NRC
MONTHYEARML20062J3091980-10-0101 October 1980 Forwards Hartsville Nuclear Plant Primary Water Quality Monitoring Rept ML19312D8621980-04-23023 April 1980 Comments on TVA Decision to Remove Impact Mitigation Program from General Manager Ofc to Community Development Ofc.Requests Return of TVA Hartsville Program Coordinator to Ofc of General Manager.Cites Legal Obligation of Fes ML19257D5261980-01-18018 January 1980 Forwards NPDES Permit Mod for facility,791108 Ltr Requesting State Certification Be Incorporated Into Modified Permit & 781221 Ltr Issuing State Certification ML19208D4271979-09-18018 September 1979 Forwards EPA & Tn Dept of Public Health Joint Public Notice Announcing Mod of NPDES Permit Application ML19208A0111979-09-0707 September 1979 Forwards Draft NPDES-TN0027740 Intended for Issuance Per Federal Water Pollution Control Act,As Amended ML20148B1661978-10-0505 October 1978 Advises That Div of Water QC Will Issue Certificate of Natl Pollution Discharge Elimination Sys Permit Subj to Certain Qualifying Conditions Re Discharge Limitations & Monitoring Requirements 1980-04-23
[Table view] |
Text
.
k' jso s% ,
( ,
d -
N (QJ UNITED STATES ENVIRONMENTAL PROTECTION AGENCY g
%%8 REGION IV 345 COURTLAND STREET ATLANTA. GEORG!A 30308 ,
4E-WE 3 ,
JAN 181980
-/
Dr. Mohamed T. El-Ashry Director Environmental Quality Tennessee Valley Authority Forestry Building Norris, Tennessee 37828 Re: Modification of NPDES Permit # TN0027740 (Hartsville Nuclear Plant)
Dear Sir:
Enclosed is the National Pollutant Discharge Elimination System (NPDES) permit modification for the above referenced facility. This action constitutes issuance of a final permit under Title 40, Code of Federal Regul'ations, Section 124.61 (44 FR 32936, June 7,1979) .
In accordance with ,40 CFR 124.61, this modification will become effective on the effective date noted in the modification provided that no request for an evidentiary or panel hearing is granted by the Agency. In the event that such a request is granted, the contested provisions of the modification will be stayed and will not become effective until the administrative review process is completed. All uncontested provisions of the modification will be effe-tive and enforceable in accordance with the provisions of 40 CFR 124.61(e) .
If you vish to request an evidentiary hearing or a panel hearing, you must submit such request (an original and two copies) to the Regional Hearing Clerk within thirty (30) days from the receipt of this letter. The request will be timely if mailed by certified mail within the thirty (30) day time period.
For the request to be valid, it must conform to the requirements of 40 CFR 124.74.
A summary of these requirements is enclosed.
Information on procedures and legal matters pertaining to an evidentiary or panel hearing request eay be obtained by contacting 'fr. James L. Zimmerman, Attorney, EPA Legal Branch, at 404/881-3506.
Sincerely yours, Sanford W. Harvey, Jr.
h I Director Enforcement Division 1866 250 Enclosures cc: See Attached 8002040 SW
cc: , Mr. Elmo Lunn
~ Tennessee Dept. of Public Health Asst. Director of Environmental Projects U. S. Nuclear Regulatory Commission Mr. Kenneth E. Black, Regional Director U. S. Fish and Wildlife Service
. O e
1866 251
REQUIREMENTS FOR EVIDENTIARY / PANEL W ARING REQUEST Evidentiary Hearing (40 CFR 124.74)
- 1. Requests must be made within 30 days following date of issuance of final permit.
- 2. Regaests must contain:
(a) the name, mailing address, and t elephone number of the person mailing the request (b) a clrar and concise factual statement of the nature and scupe of the int erest of the requester (c) the names and addresses of all persons whom the requester represents (d) a stat ement by the requester that upon motion of any part y, or upon request of the Presiding Officer and without cost or expense to any other party, the requester shall make available to appear and testify the following:
(i) the requester (il) all persons represented by the requester, and (iii) all officers, directors, employees, consult ant s and agents of the requester and the persons represented by the requester.
(e) a statement of each legal or factual question alleged to be at issue and thier relevance to the permit decision together with a designa-tiun of the specific factual areas to be adjudical ed (f) an estimat e of the hearing time necessar y for the adjudicat ion (g) specific references to the contested permit terms and condi-tions as well as suggested revised or alternate permit terms and conditions, (not excluding permit denial) which, in the judgement of the request er, would be required to implement the purposes and policies of the Clean Wat er Act.
(h) in the case of challenges to the application of control or treatment technologies identified in the st atement of basis or the fact sheet ,
identification of the basis for the objection, and the alternative technologies which the requester believes are necessary to meet the requirements of the Clean Water Act.
1866 252
2
- (i) specific identification of each of the discharger's oblications which should be stayed if tne request is grant ed. If the request cont est s mc e than one permit term or condition then each obligation which is proposed to be stayed must be referenced to the particular contested term warranting the stay.
Panel Hearing (40 CFR 124.111)
The form and content of a request for a panel hearing is the same as for an evidentiary nearing, except that the permittee may specifically include a request that the hearing be conducted under the non-adversary procedures of subpart I of the regulations.
' Note: for new source & new dischargers, if the request is granted, the applicant will be considered without a permit pending final agency action.
.