|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20195J1741988-11-29029 November 1988 Provides Supplemental Response to Violations Noted in Insp Rept 50-518/87-01.Corrective Actions:Completion of Procedure on Prescribing Preventive Maintenance Requirements Rescheduled for 890301 ML20151E7511988-07-14014 July 1988 Responds to NRC Re Violations Noted in Insp Repts 50-518/87-01 & 50-520/87-01.Corrective Actions:Reviewed Vendors Storage & Preventive Maint Instructions Against Tech Spec 01.00.15.14.03 & Revised Topical Rept TVA-TR75-1A ML20150B9001988-03-0101 March 1988 Forwards Insp Rept 50-518/87-01 on 871216-18 & Notice of Violation.Allegation Partially Substantiated.Problem Re Practice of Allowing Nuclear safety-related Equipment to Be Downgraded & Moved Out of Storage to Weather Revealed ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML20211K5531986-12-0303 December 1986 Partial Response to FOIA Request for Records from Vendor Insp Branch,Ie,Re Tdi.Documents Identified in App C Available in Pdr.Documents in App D Available in PDR Under FOIA Number 86-656 & Requester Name ML20205F7571986-08-0808 August 1986 Forwards Insp Repts 50-518/86-01 & 50-520/86-01 on 860717- 18.No Violations or Deviations Noted ML20206H8001986-06-0909 June 1986 Forwards Request for Addl Info Required to Complete Review of Site Stablilzation Plan.Site Visit Requested 2 Wks After Receipt of Response ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20133N7321985-10-24024 October 1985 Forwards Proposed Cancellation Plans for Plants Officially Canceled on 840829.Requests Withdrawal of CPPR-150,CPPR-152, CPPR-172 & CPPR-173.W/two Oversize Drawings ML18029A3981985-02-27027 February 1985 Responds to RM Diggs 850117 & 0211 Ltrs Re Determination of Fees for Const Extension Requests.Util Supports NRC Determination & Will Submit Fees ML20096F8471984-09-0505 September 1984 Forwards Motion to Terminate Appellate Jurisdiction.W/O Encl.Related Correspondence ML20093F0921984-05-22022 May 1984 Responds to NRC Re Violations Noted in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Matl & Equipment Will Be Maintained Per Requirement Documents & Permanent Structures Will Be Thoroughly Inspected Annually ML20090B3551984-05-22022 May 1984 Forwards Response to Unresolved Items in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Util Prepared Preventive Maint Document Establishing Guidance for Protection,Preservation & Periodic Insp of Matls ML20084R6521984-02-24024 February 1984 FOIA Request for Computer Printout from Sept 1980 to Present of Civil Penalty Info on 27 Listed Nuclear Facilities.Sample Format Encl ML20077G6661983-07-27027 July 1983 Part 21 Rept Re Circuit Breakers Mfg Between Nov 1981 & Feb 1982.Breakers Should Be Inspected for Broken Puffer Linkage Studs.Stud Identified as Part Number 192247A.List of Circuit Breakers for Nuclear Plants Encl ML20073S8591983-05-0505 May 1983 Forwards Details of Deferral Plans for Hartsville Nuclear Plant A. Yellow Creek Plan Submittal Delayed Until 830513 ML20071B9741983-02-24024 February 1983 Reiterates 830121 Request for CP Extension Until 870901 to Permit Final Decision Re Future of Nuclear Units Based on Load Growth/Demand.Deferral Plan Details to Be Submitted by 830506 ML20069Q3661982-11-30030 November 1982 Forwards Socioeconomic Monitoring & Mitigation Rept, & Const Employee Monitoring Errata Rept ML20065S3791982-10-26026 October 1982 Informs of Discussions Re Leasing Portions of Site to Lansdowne Steel & Iron Co for 10 Yrs.Description of Site Portions Under Consideration Encl.Cp for Sites Withdrawn ML20065F8371982-09-13013 September 1982 Forwards Response to NRC Re Violations Noted in IE Insp Repts 50-518/82-08 & 50-520/82-08.Corrective Actions:Qc Investigation Rept Written to Prevent Use of Protective Coatings & PVC Conduit Covered & Stored ML20069D5161982-09-10010 September 1982 Forwards Socioeconomic Monitoring & Mitigating Rept,Sept 1981 ML20055C0611982-08-0606 August 1982 Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors ML20062H7541982-07-16016 July 1982 Forwards IE Insp Repts 50-518/82-09,50-519/82-08, 50-520/82-09 & 50-521/82-08 on 820601-04 & 28-30.No Noncompliance Noted ML20054M2121982-06-29029 June 1982 Responds to Appeal Re Denial of FOIA Request for Documents Re Atlas Machine & Iron Works,Inc.Forwards Me Resner 811109 & 820113 Memos to File ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20055A1061982-06-17017 June 1982 Forwards IE Insp Repts 50-518/82-07,50-519/82-07, 50-520/82-07 & 50-521/82-07 on 820503-14 & 21-28.No Noncompliance Noted ML20054D6501982-02-19019 February 1982 Submits Final Response Re IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Westinghouse Type Switches Used in Facilities ML20041C1091982-02-18018 February 1982 Forwards Hartsville Nuclear Plants Socioeconomic Monitoring & Mitigation Rept,Hnp SMR-10,810331, as Required by Cps. Continuing Info Will Be Provided on Semiannual Basis ML20040E8381982-01-0606 January 1982 Ack Receipt of IE Insp Repts 50-518/81-20,50-519/81-20, 50-520/81-20 & 50-521/81-20.Corrective Actions:Insp & Const Personnel Instructed to Begin Lightly Scarifying Layers on All Backfill ML20040C1361981-12-29029 December 1981 Responds to NRC 811117 Ltr Re Violations Noted in IE Insp Repts 50-518/81-18,50-519/81-18,50-520/81-18 & 50-521/81-18. Corrective Actions:Preventive Maint Requirements for RHR Pumps Will Be Performed Quarterly ML20039A2811981-12-0404 December 1981 Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl ML20040C2651981-11-16016 November 1981 Submits Final Response to IE Bulletin 81-02,Suppl 1,re Potentially Deficient Valves.No Subj Valves Installed at Plants ML20010H3481981-08-14014 August 1981 Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 ML20010A3291981-07-30030 July 1981 Forwards HNP SMR - 9, Socioeconomic Monitoring & Mitigation Rept for Apr-Sept 1980 ML20009G3291981-07-23023 July 1981 Submits Final Response to IE Bulletin 80-21,per NRC 801106 Ltr.Ge & Valve Vendors Indicate No safety-related Valves Have Parts Mfg by Malcolm Foundry Co,Inc ML20009E9871981-07-21021 July 1981 Advises That Planned Start of Excavation for Intake & Discharge in Cumberland River Will Be Delayed Until Aug 1982,per Attachment C of CP ML20009G1271981-07-15015 July 1981 Interim Deficiency Rept Re High Pressure Core Spray Component Wiring Discrepancies.Corrective Action Date for Hardware & Software Will Be 810730 Instead of 810630. Revised Vendor Drawings Have Not Been Received ML20009D7321981-07-0808 July 1981 Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Deficient Valves Are Being Supplied for Use at Facility.Addl Rept Will Be Provided by 811016 ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). ML20009G7571981-07-0606 July 1981 Responds to NRC 810604 Ltr Re Violations Noted in IE Insp Repts 50-518/81-08,50-519/81-08,50-520/81-08 & 50-521/81-08. Corrective Actions:Procedure Revised to Include Requirement for Writing Notification of Change Rept within Three Days ML20009A4881981-07-0202 July 1981 Forwards Info Re Implementation of NUREG-0313,Revision 1,in Response to NRC 810226 Ltr.Addl Info for Hartsville & Phipps Bend Will Be Provided in Respective FSARs Tentatively Scheduled for Sept 1983 Submittal ML20009D9461981-06-15015 June 1981 Submits Third Interim Response to IE Bulletin 80-20 Re Failure of Westinghouse W-2 Control Switches.Work Continuing W/Westinghouse on Resolution of Control Switches. GE Collecting Requested Info.Final Rept Ready by 810814 ML20004E9381981-05-27027 May 1981 Submits Second Interim Response to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No Valves W/Vendor Parts Found at Plants.Final Rept,Including GE Input on NSSS Valves, Will Be Filed by 810731 ML20126L0161981-05-22022 May 1981 Forwards Addl Info Re Flammability of Suspended Ceiling Tile in Control Rooms & Replacement Panels to Be Used at Browns Ferry.Interim Rept on Hartsville & Phipps Bend Sent 810114. Info Constitutes Final Response to ML20004E6281981-05-22022 May 1981 Responds to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Mods Will Be Enriched on Engineering Change Notifications to Improve Visual Identifications ML20004E7121981-05-22022 May 1981 Forwards Final Supplemental Response to NRC 810114 Ltr Re Violations Noted in IE Insp Repts 50-518/80-24 & 50-520/80-24.Corrective Actions:Mod to Be Encircled on ECN to Improve Visual Identification of Affected Change Areas ML19346A1151981-05-15015 May 1981 Responds to NRC 810320 Ltr Re Violations Noted in IE Insp Repts 50-518/81-04,50-519/81-04,50-520/81-04 & 50-521/81-04. Corrective Actions:Qcirs Will Be Reviewed & Upgraded as Required & Audit Will Be Conducted by QA Unit ML19346A1161981-04-17017 April 1981 Responds to NRC 810320 Ltr Re Violations Noted in IE Insp Repts 50-518/81-04,50-519/81-04,50-520/81-04 & 50-521/81-04. Corrective Actions:Welders Restricted to Limits of Qualifications ML19347E0911981-04-0303 April 1981 Forwards Justification for Delay in Meeting 821001 Date for Having Operational Upgraded Emergency Response Facility,As Required by Item III.A.1.2 of NUREG-0737.Response for Hartsville & Phipps Bend Will Be Provided by 811009 ML19347E0051981-04-0101 April 1981 Forwards Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Valcor Valves Cited in Bulletin Are Not in Use at Plants 1988-07-14
[Table view] Category:NRC TO UTILITY
MONTHYEARML20150B9001988-03-0101 March 1988 Forwards Insp Rept 50-518/87-01 on 871216-18 & Notice of Violation.Allegation Partially Substantiated.Problem Re Practice of Allowing Nuclear safety-related Equipment to Be Downgraded & Moved Out of Storage to Weather Revealed ML20205F7571986-08-0808 August 1986 Forwards Insp Repts 50-518/86-01 & 50-520/86-01 on 860717- 18.No Violations or Deviations Noted ML20206H8001986-06-0909 June 1986 Forwards Request for Addl Info Required to Complete Review of Site Stablilzation Plan.Site Visit Requested 2 Wks After Receipt of Response ML20062H7541982-07-16016 July 1982 Forwards IE Insp Repts 50-518/82-09,50-519/82-08, 50-520/82-09 & 50-521/82-08 on 820601-04 & 28-30.No Noncompliance Noted ML20055A1061982-06-17017 June 1982 Forwards IE Insp Repts 50-518/82-07,50-519/82-07, 50-520/82-07 & 50-521/82-07 on 820503-14 & 21-28.No Noncompliance Noted ML20062E7511978-11-30030 November 1978 Forwards Amend 1 to CPPR-150,Amend 1 to CPPR-152 & Amend 1 to CPPR-153, & Notice of Issuance & Availability ML20062E3501978-11-30030 November 1978 Lists Staff Review Categories 2,3 & 4 for Consideration in Preparation of FSAR & Lic Review.W/Encl Descriptions of Categories 2,3 & 4 ML20062E4971978-11-0202 November 1978 Forwards IE Inspec Rept 50-518/78-13, 50-519/78-13, 50-520/ 78-13, 50-521/78-13 on 781010-11 During Which No Items of Noncompliance Were Noted ML20062E3871978-10-27027 October 1978 Forwards IE Inspec Repts 50-518/78-11, 50-519/78-11, 50-520/ 78-11 & 50-521/78-11 on 780926-29 During Which No Items of Noncompliance Were Noted ML20148L2441978-10-11011 October 1978 Forwards IE Inspec Repts 50-518/78-10, 50-519/78-10, 50-520/78-10 & 50-521/78-10 on 780914-15 During Which No Items of Noncompliance Were Noted ML20062C7671978-10-0404 October 1978 Forwards IE Inspec Repts 50-518/78-08,50-519/78-08 50-520/78-08 & 50-521/78-08 on 780815-31 During Which No Items of Noncompliance Were Noted 1988-03-01
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20150B9001988-03-0101 March 1988 Forwards Insp Rept 50-518/87-01 on 871216-18 & Notice of Violation.Allegation Partially Substantiated.Problem Re Practice of Allowing Nuclear safety-related Equipment to Be Downgraded & Moved Out of Storage to Weather Revealed ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML20211K5531986-12-0303 December 1986 Partial Response to FOIA Request for Records from Vendor Insp Branch,Ie,Re Tdi.Documents Identified in App C Available in Pdr.Documents in App D Available in PDR Under FOIA Number 86-656 & Requester Name ML20205F7571986-08-0808 August 1986 Forwards Insp Repts 50-518/86-01 & 50-520/86-01 on 860717- 18.No Violations or Deviations Noted ML20206H8001986-06-0909 June 1986 Forwards Request for Addl Info Required to Complete Review of Site Stablilzation Plan.Site Visit Requested 2 Wks After Receipt of Response ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20062H7541982-07-16016 July 1982 Forwards IE Insp Repts 50-518/82-09,50-519/82-08, 50-520/82-09 & 50-521/82-08 on 820601-04 & 28-30.No Noncompliance Noted ML20054M2121982-06-29029 June 1982 Responds to Appeal Re Denial of FOIA Request for Documents Re Atlas Machine & Iron Works,Inc.Forwards Me Resner 811109 & 820113 Memos to File ML20055A1061982-06-17017 June 1982 Forwards IE Insp Repts 50-518/82-07,50-519/82-07, 50-520/82-07 & 50-521/82-07 on 820503-14 & 21-28.No Noncompliance Noted ML20062E7511978-11-30030 November 1978 Forwards Amend 1 to CPPR-150,Amend 1 to CPPR-152 & Amend 1 to CPPR-153, & Notice of Issuance & Availability ML20062E3501978-11-30030 November 1978 Lists Staff Review Categories 2,3 & 4 for Consideration in Preparation of FSAR & Lic Review.W/Encl Descriptions of Categories 2,3 & 4 ML20062E4971978-11-0202 November 1978 Forwards IE Inspec Rept 50-518/78-13, 50-519/78-13, 50-520/ 78-13, 50-521/78-13 on 781010-11 During Which No Items of Noncompliance Were Noted ML20062E3871978-10-27027 October 1978 Forwards IE Inspec Repts 50-518/78-11, 50-519/78-11, 50-520/ 78-11 & 50-521/78-11 on 780926-29 During Which No Items of Noncompliance Were Noted ML20148L2441978-10-11011 October 1978 Forwards IE Inspec Repts 50-518/78-10, 50-519/78-10, 50-520/78-10 & 50-521/78-10 on 780914-15 During Which No Items of Noncompliance Were Noted ML20062C7671978-10-0404 October 1978 Forwards IE Inspec Repts 50-518/78-08,50-519/78-08 50-520/78-08 & 50-521/78-08 on 780815-31 During Which No Items of Noncompliance Were Noted 1988-03-01
[Table view] |
See also: IR 05000518/1986001
Text
<-
Ohc 'w.
.
~ .
,- # $.
AUG 0 81986
Docket Nos. 50-518 and 50-520
License Nos. CPPR-150 and CPPR-152
Jennessee Valley Authority
ATTN: Mr. Steven A. White'
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-518/86-01 AND 50-520/86-01
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
A. H. Johnson on July 17-18, 1986. The inspection included a review of
activities authorized for your Hartsville facility. At the conclusion of the
inspection, the findings were discussed with . those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's ' " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
,3
NAl. SIGNED BY
Y WILUAM E. CUNE
Gary G. Zech, Director
TVA Projects
Enclosure:
NRC Inspection Report
cc w/ encl: (See page 2)
8608190322 860808
PDR ADOCK 05000518
G PDR _
I I
JEol
,
,- .
<> . .
Tennessee Valley Authority 2 AUG 0 8 286
cc w/ encl:
s/W. T. Quinn, Site Manager
d). L. Williams, Jr. , Supervisor
Licensing Section -
LM' Hellums, Project Engineer
E< W. Whitt, Director, Nuclear
Managers Review Group
RT F. Cook, Supervisor Warehouse
Services Hartsville Site
bec w/ encl:
J. N. Grace
R. D. Walker-
VH. R. Denton, NRR
Sr. L. Thompson, NRR
p,M. Taylor,IE
W. B. Hayes, OI
Sf'R. Connelly, 0IA
G. G. Zech
S. P. Weise
-
Document Control Desk
State of Tennessee
l
i
l
l
l
l
l
l
l
~
RII _, .
AJohnson:er
RII(6f2
FCantrell
.
11 e
08/4/86 08/f,/86 08 /86