ML20090B355

From kanterella
Jump to navigation Jump to search
Forwards Response to Unresolved Items in IE Insp Repts 50-518/84-01 & 50-520/84-01.Corrective Actions:Util Prepared Preventive Maint Document Establishing Guidance for Protection,Preservation & Periodic Insp of Matls
ML20090B355
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 05/22/1984
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8407120453
Download: ML20090B355 (3)


Text

_ _ _ _

[k TENNESSEE VALLEY AUTHORITY

. CH ATTANOOGA, TENNESSEE 37401 400 Chestnut Street Tower II May 22, 1984 U.S. Nuclear Regulatory Commission Region II ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Enclosed is our response to the unresolved items in D. M. Verrelli's April 20, 1984 letter to H. G. Parris, transmitting Inspection Report Nos. 50-518/84-01, 50-520/84-01, regarding activities at our Hartsville Nuclear Plant. The information contained in the enclosure is the result of a discussion between A. Schwencer and f; >yd Cantrell of NRC and the TVA staff on April 6,1984. If you have any questions, please call Jim Domer at FTS 858-2725.

To the best of my knowledge, I declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure cc: Office of Nuclear Reactor Regulation (Enclosure)

Attention: Mr. Albert Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 DESIGNATED ORIGIMAR ,

pa uA . N: :2 a 1

)

8407120453 840522 PDR ADOCK 05000518 G PDR An Equal Opportunity Employer n

'. 8

+

ENCLOSURE HARTSVILLE NUCLEAR PLANT MAINTENANCE AND INSPECTION OF STRUCTURES AND EQUIPMENT .

DURING SUSPENSION OF CONSTRUCTION UNRESOLVED ITEMS 518/84-01-01 AND 520/84-01-01 In L. M. Mills' letter to H. R. Denton dated May 5, 1983, TVA committed to a limited maintenance effort for permanent plant structures. Critical items associated with permanent plant structures were to be maintained such that restart of construction of these structures at the end of the deferral period could begin without a major rehabilitation effort. In order to accomplish this, TVA prepared a pretentive maintenance document which established guidance for the protection, preservation, and periodic inspection of specified materials. This program was developed and implemented based on the original TVA Board decision on the schedule for design restart.

However, the decision for design restart has been revised by the Board and slipped to a later date.

Based on this revision to the design restart date as well as observance of minimal deterioration of structural elements at Hartsville B site, TVA has decided to alter its maintenance program of the Hartsville A site. The purpose of this letter is to inform NRC of TVA's intention to do so.

The reduced effort of preventive maintenance is based largely on what has been observed at the Hartsville B site over the past three years.-

The formal request for cancellation of the Hartsville B site construction permit was made in the L. M. Mills' letter to H. R. Denton dated March 22, 1983 Since that time, preventive maintenance and .nspection have been discontinued for that site. ~

After three years of discontinued maintenance, there has been little deterioration of structural elements at Hartsville B. TVA, therefore, is changing the preventive maintenance requirements for Hartsville A as follows.

(a) TVA will maintain all material and equipment in accordance with requirement documents with the exception of discontinuing all preventive maintenance on all structural material in storage.

(b) TVA will discontinue all preventive maintenance on permanent structures including installed material (excluding engineered equipment) and embedments for a period of three years. A thorough onsite inspection will be made annually to assess the conditions of the installed material and permanent structures and corrective steps taken as necessary.

^

A

.l - .

(c) For all stored and/or installed material, preventive maintenance will be applied to any item that is determined to present a -

safety hazard to personnel. However, site personnel safety requirements may' be achieved in some cases by~ preventing access to the area or by removing the item.

(d) Structural materials in class D storage areas are not being maintained since most are being disposed of as excess material.

The preventive maintenance program is continuing'to be controlled by issued preventive maintenance documents, A TVA Division of Engineering Design engineering inspection team will monitor and evaluate the effectiveness of the preventive maintenance program by visiting the site for detailed inspections of program results. This required annual inspection will result in inmediate corrective action for any required preventive maintenance before damage to structural integrity occurs. This more limited maintenance effort underway for permanent plant structures during the period of deferral will maintain critical items for permanent plant structures in such a way that restart of construction on these structures at the end of the deferral period may begin without a major rehabilitation effort.

The basic principles, design philosophy, nor details of deferral plans previously presented to the NRC have been changed by this reassessmsnt. TVA has every confidence that this revised program will adequately maintain the Hartsville A site for restart of design and construction. All QA requirements are being fully met by this approach.

O e

l l dI