Forwards IE Insp Repts 50-518/82-07,50-519/82-07, 50-520/82-07 & 50-521/82-07 on 820503-14 & 21-28.No Noncompliance Noted
ML20055A106
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 06/17/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20055A107 List:
References
NUDOCS 8207150482
Download: ML20055A106 (2)


See also: IR 05000518/1982007

Text

.

'

.

jeae

JUN 17 193g

,

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos. 50-518/82-07, 50-519/82-07, 50-520/82-07 and 50-521/82-07

This refers to the routine safety inspection conducted by Mr. J. F. Schapker of

this office on May 3-14, 21-28, 1982, of activities authorized by NRC

Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152, and CPPR-153 for the

Hartsville facility and to the discussion of our findings held with

Mr. W. T. Quinn, Site Construction Engineer, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

encloseo inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

talephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Lhould you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

!

4/

, F. J. Long, Acting Chief

i Reactor Project Branch 1

Division of Project and

j Resident Programs

! Enclosure:

! Inspection Report Nos. 50-518/82-07

50-519/82-07, 50-520/82-07, and

, 50-521/82-07

!

CC W/ encl:

l H. J. Green, Director of Nuclear Power

j R. T. Hathcote, Project Manager

i 8207150482 8

PDR ADOCK 0 PDR

$Oh

. .

- .

Tennessee Valley Authority 2

i

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

H. N. Culver, Chief

Nuclear Safety Review Staff ,

bcc w/ encl:

HRC Resident Inspector

Document Management Branch

State of Tennessee

l

I

RII RII RII RII

hk

Jschapker:dt

-fb

RButcher

YA

FCantrell F[JongNf

t

6/r7 /82 6//7/82 6//,7 /82 6/jg//P.?