Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-12, Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested1999-06-23023 June 1999 Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 3F0699-08, Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments1999-06-21021 June 1999 Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl1999-06-0404 June 1999 Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads1999-05-28028 May 1999 Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl1999-05-26026 May 1999 Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs1999-05-21021 May 1999 Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM1999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments1999-05-14014 May 1999 Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments 3F0599-07, Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 19781999-05-14014 May 1999 Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 1978 3F0599-03, Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR1999-05-12012 May 1999 Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl1999-05-12012 May 1999 Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl 3F0599-08, Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments1999-05-0303 May 1999 Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments 3F0599-09, Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 19981999-05-0101 May 1999 Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 1998 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent1999-04-30030 April 1999 Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent 3F0499-09, Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 9907301999-04-30030 April 1999 Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 990730 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements1999-04-23023 April 1999 Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl1999-04-20020 April 1999 Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin1999-04-16016 April 1999 Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin 3F0499-08, Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 19981999-04-16016 April 1999 Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 1998 1999-09-27
[Table view] Category:UTILITY TO NRC
MONTHYEAR3F0990-11, Forwards Final Status Update Re Design & Operations Verification for Instrument Air Sys Per Generic Ltr 88-141990-09-20020 September 1990 Forwards Final Status Update Re Design & Operations Verification for Instrument Air Sys Per Generic Ltr 88-14 3F0990-05, Forwards 1990 Inservice Insp Summary Rept. Rept Contains Owners Data Rept,Data Summary Sections for Class 1,2 & 3 Components,Rept for Repair & Replacements & Listing of Exams1990-09-14014 September 1990 Forwards 1990 Inservice Insp Summary Rept. Rept Contains Owners Data Rept,Data Summary Sections for Class 1,2 & 3 Components,Rept for Repair & Replacements & Listing of Exams 3F0990-08, Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure1990-09-13013 September 1990 Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure 3F0890-23, Discusses Decommissioning Financial Assurance Rept Dtd 900726.Amount Util Collecting Exceeds Amount Necessary Based on NRC Formula & Does Not Include Estimated Cost of Removal & Disposal of Nonradioactive Structures & Matls1990-08-30030 August 1990 Discusses Decommissioning Financial Assurance Rept Dtd 900726.Amount Util Collecting Exceeds Amount Necessary Based on NRC Formula & Does Not Include Estimated Cost of Removal & Disposal of Nonradioactive Structures & Matls ML20028G8251990-08-29029 August 1990 Advises That Supplemental Response to Insp Rept 50-302/89-18 Will Be Submitted by 901030 ML20059G1721990-08-24024 August 1990 Submits Info Re Change in Operator License Status.Re Rawls & Wa Stephenson Senior Reactor Licenses Should Be Terminated, Effective 900817 Due to Reassignment from Position Requiring Licenses 3F0890-15, Forwards Fitness for Duty Program Performance Data for Period of Jan-Jun 19901990-08-23023 August 1990 Forwards Fitness for Duty Program Performance Data for Period of Jan-Jun 1990 3F0890-21, Forwards Semiannual Radioactive Release Rept Jan-June 1990 for Crystal River Unit 3 & Rev 15 to Crystal River Unit 3 Odcm1990-08-23023 August 1990 Forwards Semiannual Radioactive Release Rept Jan-June 1990 for Crystal River Unit 3 & Rev 15 to Crystal River Unit 3 Odcm ML20059A0031990-08-16016 August 1990 Responds to NRC 900613 Request for Addl Info Re Util 871222 Response to Violations Noted in Insp Rept 50-302/87-30 3F0890-03, Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 31990-08-16016 August 1990 Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3 3F0890-10, Advises That Util Completed Mods to Comply w/10CFR50.62 Requirements Re Reduction of Risk from ATWS Events1990-08-16016 August 1990 Advises That Util Completed Mods to Comply w/10CFR50.62 Requirements Re Reduction of Risk from ATWS Events 3F0890-05, Forwards Addl Info Re Response to Mode 3 Loca,Per 900711 Request,Providing Background of Factors Considered During Evaluation of Tech Spec Change Request 1741990-08-10010 August 1990 Forwards Addl Info Re Response to Mode 3 Loca,Per 900711 Request,Providing Background of Factors Considered During Evaluation of Tech Spec Change Request 174 ML20058L2001990-08-0202 August 1990 Provides Current Status of Reg Guide 1.97 Activities. Pressurizer Heater Status & Main Steam Safety/Relief Valve Position Indications Completed 3F0790-10, Forwards Justification for Continued Operation Re Emergency Diesel Generator Block Loading Voltage Dips.Util Will Install Higher Accuracy Relays to Improve on Accuracy & Repeatability of Load Intervals1990-07-18018 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator Block Loading Voltage Dips.Util Will Install Higher Accuracy Relays to Improve on Accuracy & Repeatability of Load Intervals 3F0790-06, Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-81990-07-12012 July 1990 Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-8 ML20055D5561990-06-29029 June 1990 Forwards 890505 & s to Be Placed in Plant File 3F0690-15, Informs That Tech Spec Actions Identified in Util Addressed as Part of Tech Spec Improvement Program,Per 900518 Request for Programmed Enhancements for Generic Ltr 88-171990-06-29029 June 1990 Informs That Tech Spec Actions Identified in Util Addressed as Part of Tech Spec Improvement Program,Per 900518 Request for Programmed Enhancements for Generic Ltr 88-17 3F0690-22, Forwards Annual Financial Repts for 1989 for Orlando Utils Commission & Cities of Bushnell,Leesburg,Ocala & Tallahassee,Per 10CFR50.71(b)1990-06-27027 June 1990 Forwards Annual Financial Repts for 1989 for Orlando Utils Commission & Cities of Bushnell,Leesburg,Ocala & Tallahassee,Per 10CFR50.71(b) 3F0690-19, Responds to Deviations Noted in Insp Rept 50-302/90-15. Corrective Actions:All Reg Guide 1.97 Category 1 Instruments on Main Control Board Marked & Engineered Safeguards Matrix Indicating Lights Arranged in Unique Array1990-06-25025 June 1990 Responds to Deviations Noted in Insp Rept 50-302/90-15. Corrective Actions:All Reg Guide 1.97 Category 1 Instruments on Main Control Board Marked & Engineered Safeguards Matrix Indicating Lights Arranged in Unique Array ML20043H5781990-06-21021 June 1990 Responds to Generic Ltr 89-06, Spds. All Open Issues Identified in NRC SER & Plant SPDS Satisfies NUREG-0737, Item I.D.2 & Suppl 1 ML20044A6121990-06-21021 June 1990 Forwards Payment of Civil Penalty,Per NRC 900524 Order Based on Findings in Insp Rept 50-302/89-09 ML20043J0221990-06-21021 June 1990 Submits Info in Support of Tech Spec Change Request 175,Rev 1,Suppl 1 Re Spent Fuel Pool Storage Capacity at Plant ML20043H4151990-06-21021 June 1990 Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. 3F0690-18, Responds to Violations Noted in Insp Rept 50-302/90-09. Corrective Action:Temporary Lettering Placed on Index Plates for Consistency W/Previous Markings Immediately Following Discovery of Error1990-06-20020 June 1990 Responds to Violations Noted in Insp Rept 50-302/90-09. Corrective Action:Temporary Lettering Placed on Index Plates for Consistency W/Previous Markings Immediately Following Discovery of Error ML20043H2901990-06-15015 June 1990 Forwards Results of Refuel 7 once-through Steam Generator (OTSG) Eddy Current Insp,Per Tech Spec Section 4.4.5.5.Eight Defective Tubes & Two Administratively Plugged Tubes in OTSG a Resulted from Review of Insp Data ML20044A0641990-06-13013 June 1990 Forwards Rev 5 to Physical Security Plan,Replacing Currently Approved Rev 4 W/Amends.Rev Withheld (Ref 10CFR73.21) ML20043G2271990-06-12012 June 1990 Suppls 900604 Ltr Describing How Control Room Habitability Dose Would Be Adversely Affected by Elimination of Reactor Bldg Flood Vol Unless Overly Conservative Failure Postulations Also Changed.Quarterly Updates to Be Provided ML20043G3711990-06-12012 June 1990 Forwards 1990 Internal Cash Flow Projection for Plant Which Updates Utils Utilization of Alternative (E) ML20043G2361990-06-12012 June 1990 Forwards Info Re Fire Protection Sys Reliability for Providing Water to Intermediate Bldg Following High Energy Line Break.B&W Issued Contract to Verify Mass/Energy Release & Motor Starters & Terminal Blocks Insulated ML20043F1601990-06-0404 June 1990 Provides Supplemental Info on Reactor Bldg Flooding,Per Util 900517 Ltr Describing Resolution Plan Being Pursued.Util Has Limited Vol of Water Contributed by Borated Water Storage Tank & Sodium Hydroxide Tank to Flood Level ML20043C8721990-05-31031 May 1990 Forwards Rev 0 to Crystal River Unit 3 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.1.7 ML20043B8431990-05-24024 May 1990 Describes Alternative Testing of Reactor Bldg Spray Suction Valves BSV-1 & BSV-8,per Generic Ltr 89-04.At Least One Valve Will Be Disassembled & Inspected During Each Refueling Outage Using Alternate Insp Method ML20043B2771990-05-18018 May 1990 Advises of Mod to Original Commitment & Plans to Store Seal Ring in Original Storage Location During Plant Operations, Per 790606 Ltr.Mod Minimizes Personnel Exposure & Enhances Seal Plate Leak Tightness Due to Less Handling ML20043B0321990-05-17017 May 1990 Provides Details of Resolution Util Will Pursue Re Reactor Bldg Flooding Detailed in Encl LER 90-005.Mod Will Be Installed to Add Alarm in Main Control Room to Indicate When Flood Level Reaches Point & Operator Action Begins ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20042G7681990-05-10010 May 1990 Submits Unsatisfactory Performance Testing Incident Repts, Per 10CFR26, Fitness for Duty. Results of Three Positive Blind Test Samples Certified to Contain No Drugs ML20043A4931990-05-10010 May 1990 Forwards Executed Amend 8 to Indemnity Agreement B-54 ML20042G2101990-05-0707 May 1990 Provides Notice of MW Kirk Permanent Reassignment from Position & Requests Termination of Senior Reactor Operator License 20481-1,effective 900505 ML20042E8611990-04-26026 April 1990 Forwards Annual Financial Repts for Six Participating Owners of Plant ML20012F2941990-03-30030 March 1990 Forwards Nonproprietary Rev to 51-1176431-02, Crystal River 3 Reactor Vessel...Temp Overpressure Protection, in Support of Tech Spec Change Request 174,Suppl 1 Re Response to Generic Ltr 88-11 ML20042D8321990-03-30030 March 1990 Provides Supplemental Response to Station Blackout Rule Implementation & Affirms That Diesel Generator Target Reliability Will Be Maintained ML20012E2041990-03-23023 March 1990 Requests Temporary Waiver of Compliance Granted on Tech Spec 3.9.8.2 Re DHR Power Source Requirements ML20012D9471990-03-21021 March 1990 Requests Approval of Capsule Withdrawal Schedule in Table 3-19 of BAW-1543,Rev 3, Master Integrated Reactor Vessel Surveillance Program to Allow Plant Refuel 7 Outage Plans to Continue on Schedule.Changes Needing NRC Approval Listed ML20012D7371990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47. Util Will Implement Appropriate Sys to Protect Against Overfill Concerns ML20012C4501990-03-13013 March 1990 Forwards Listing of Insurance Policies in Place for Plant as of 900225 ML20012B4821990-03-0707 March 1990 Forwards Inservice Insp Pump & Valve Program Relief Request V-371 Proposing Alternate Acceptance Criteria Requirements for IWP-4150 for Fluctuations in Hydraulic Instrument Readings ML20012B3651990-03-0101 March 1990 Lists Five Addl Drugs Included in 10CFR26 Re fitness-for- Duty Testing Program.Specimens Identified as Positive on Initial Screening Will Be Confirmed Using Gas Chromatography or Mass Spectrometry at Listed cut-off Levels ML20012A4041990-02-27027 February 1990 Forwards 1989 Annual Rept of Personnel Exposure in Accordance w/10CFR20.407 & Tech Spec 6.9.1.5.(a) & Annual Rept of Facility Changes,Tests & Experiments in Accordance w/10CFR50.59 ML20006G1731990-02-23023 February 1990 Advises That Util Voluntarily Agrees to Participate in Emergency Response Data Sys Proposed in Generic Ltr 89-15 ML20011F2411990-02-21021 February 1990 Provides Followup on & Documents Discussion in 900116 Meeting Re Emergency Diesel Generator Loading 1990-09-20
[Table view] |
Text
{{#Wiki_filter:. .
eece ehk,e wwn a e O CM lC? t3 es oa r3 c-? c1 JQ:n, e opo&o g
sosco Florida Power C O R PO R A T IO N October 15, 1979 Mr. Walter P. Haass Chief Quality Assurance Branch Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Docket No. 50-302 Operating License No. DPR-72 Hanagement & Technical Resources
Dear Mr. Ibass:
On July 31, 1979, Florida Power Corporation responded to your letter of June 29, 1979 requesting technical qualifications of management and technical resources available to handle an event such as the Three Mile Island-2 accident.
Attached are:
- 1. Additional alphabetized " Technical Qualification" sheets for management and technical personnel, and
- 2. An updated summarization table showing:
- a. College education,
- b. Nuclear experience,
- c. Management experience,
- d. Utility experience,
- e. Nuclear General Review Committee (NGRC),
- f. Offsite Radiological Support Group (ORS),
- g. Crystal River Unit #3 plant staff, and
- h. Emergency Training Operations Group (ETO).
It should still be noted that, in addition to the information which has been provided, additional management and technical expertise, regardless of departmental lines and position, could be utilized, if needed.
}l - -
? 91018 0.3 f '7 General Office 3201 Tnirty fourtn street soutn . P O Box 14042. St Petersburg. Florida 33733 813 - 866-5151
Mr. Walter P. Haa ss Page Two October 15, 1979 Should you have any questions or need additional information concerning this subject, please contact this office.
Very truly yours, FLORIDA POWER CORPORATION
. Q,LO@-{
W. P. Stewart Manager, Nuclear Operations WPSemhF06 D47 File: 3-0-3-a-3
, - 7, ?
33 ,J I; _-
STATE OF FLORIDA COUNTY OF PINELLAS W. P. Stewart states that he is the Manager, Nuclear Operations, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
\
t - ~0 t O A W. P. Stewart Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 15th day of October, 1979.
Notary Public Notary Public, State of Florida at Large, My Commission Expires: August 8, 1983
}1 '1 i n . .
CameronNotary 3(D12)
\ 4 AAYQ, s
71),;{ 3 .-,
k,'s ,
s Jl
)
) ,
Florida Power CORPORAT'ON October 15, 1979 Mr. Walter P. Haass Chief Quality Assurance Branch Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Docket No. 50-302 Operating License No. DPR-72 Management & Technical Resources
Dear Mr. Haass :
On July 31, 1979, Florida Power Corporation responded to your letter of June 29, 1979 requesting technical qualifications of management and technical resources available to handle an event such as the Three Mile Island-2 accident.
Attached are:
- 1. Additional alphabetized " Technical Qualification" sheets for management and technical personnel, and
- 2. An updated summarization table showing:
- a. College education,
- b. Nuclear experience,
- c. Management experience,
- d. Utility experience,
- e. Nuclear General Review Committee (NGRC),
- f. Cf fsite Radiological Support Group (ORS),
- g. Crystal River Unit #3 plant staff, and
- h. Emergency Training Operations Group (ETO).
It should still be noted that, in addition to t he inf o rmation which has been provided, additional management and technical expertise, regardless of departmental lines and position, could be utilized, if needr.d.
11
~
'O" l i s *J General Office 3201 inirty founn street soutn . P O Scx 14042. st PetersDurg Fiorica 33733 813-866-515 t
i Mr. Walter P. Haass Page Two October 15, 1979 Should you have any questions or need additional information concerning this subject, please contact this office..
Very truly yours, FLORIDA POWER CORPORATION (d . . t W6d W. P. Stewart Manager, Nuclear Operations WPSemhF06
*D47 File: 3-0-3-a-3
,o, i , , -- >J
4 STATE OF FLORIDA COUNTY OF PINELLAS W. P. Stewart states that he is the Manager, Nuclear Operations, of Florida Power Corporation; that he is authorized on the part }
of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information and belief.
h g
vb-(- ]'s kN SU W. P. Stewart Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 15th day of October, 1979.
Notary Public Notary Public, State of Florida at Large, My Commission Expires: August 8, 1983
,o/
33
!; - t CameronNotary 3(D12)
9 TECHNCAL QUALIFICATIONS Mr. Laurence Bayer - Quality Control Specialist
- 1. Job Responsibilities Control the receipt, inspection, storage and preservation of quality materials. Insure that all quality materials released to the plant, for use, meet all applicable Company and industry requirements.
Identify and coordinate the problems resulting from, and the disposition of, non-conforming materials.
- 2. Education Bachelor of Science in Chemical Engineering, Michigan State University, E. Lansing , Michigan - 1943,
- 3. Nuclear Training None
- 4. Nuclear Experience None
- 5. Summary -
Mr. Bayer, Quality Control Specialist, started his employment with Florida Power Corporation on April 4, 1979.
He started his main career as Chief Engineer at Morris Paperboard Company in Paterson, N.J., which position he held for thirteen years.
His responsibilities included the engineering and maintenance of the mill to insure the uninterrupted continuous operation of the mill.
Following this, he worked as Project E1gineer, Field Project bbnager and Staff Proj.ct Manager with Parsone, and Whittemore Corp. , New Ycrk, N.Y. , an international engineering fi rm engaged in the construction of turn-key pulp and paper mills world-wide. Responsibilities included the design coordination, purchasing, supervision of construction and erection as well as the start-up and operation of these mill.s.
Immediately prior to assuming his position with Florida Power Corporation, he spent eight years as Consultant to the Algerian Government for the establishment of a pulp and paper industry in Algeria, working for Joseph E. Atchison Consultants, Inc., New York, N.Y. Responsibilities included the establishment of design concepts, preparation of Calls for Tender, analyzing bids, and controlling the performance of the successful contractor in the building and operation of the mills.
t
~
'q ETibbs(T.SpecLB)D88 U
~
TECHNCAL QUALIFICATIONS Mr. W. James Brown, Jr. - Manager, Power Plant Inventory Control -
Purchasing
- 1. Job Responsibilities Responsible for managing the Company's General Supplies and Spare Parts Inventory in our Power Plant Storerooms. Develop and maintain up-to-date catalogs of these parts. Establish procedures and review recommended changes to our Materials Management Information Systems for Power Plant Parts.
- 2. Education BSEC, University of Florida,1961
- 3. Nuclear Training None
- 4. Nuclear Experience None
- 5. Summary W. James Brown, Jr. was employed by Flor da Power Corporation in February 1961 immediately following gradiation. Experience with Florida Poweer has been in the areas o' u1~ iribution Engineering, Power Sales, Industrial Development, Personnel, ?roduction Cost Control and, at present, Inventory Control 1 1^ l ')
l i ETibbs(WJB)D88
TECHNICAL QUALIFICATIONS Mr. Michael H. Kleinman - Project Manager - Combustion Turbine Projects
- 1. Job Responsibilities Direct and manage the Combustion Turbine Projects as outlined in the Generation Expansion Plant; insure that these projects are completed on time and within the authorized budget, while providing units de-signed and constructed compatible with company operating requirements.
- 2. Education A. BME, New York University,1952.
- 3. Nuclear Experience A. Engineering and Construction -- For a major Engineer-Constructor, he was responsible for the installation of the piping anc mechan-ical components including field design changes at two large three- and four-loop pressurized water nuclear plants. This in-cluded direct and indirect supervision of tho mechanical crafts, planning, scheduling, and development of construction proce-dures. Participated in design activities in the engineering office during various periods while assigned to these projects during a four-year period. -
B. Startup & Testing -- For two years, he functioned as Lead Startup Engineer at a four-loop pressurized water nuclear plant, culmi-nating nine years as Startup Engineer for a major Engineer-Cnnstructor. Supervised the development of the required preoper-ational test procedures and functioned as a member of the Utili-ties Joint Test Group.
C. Quality -- Since early 1971, he assisted in the fomulation of and implemented the present FPC policy regarding its Quality Pro-gram. This program encompasses all activities related to the de-sign, procurement, construction, startup, and operation of all generating facilities. Activities associated with this function as related to Crystal River Unit 3 are the responsibility for:
- 1. Liaison with the AEC/DR0 and for FPC's compliance with 10 CFR 50, Appendix B.
- 2. Development and implementation of F'C's Quality Program and Quality Manual and other similar procedures.
- 3. Perfomin'; the managemant functions associated with the im-plementation of the Quality Surveillance level of the FPC Quality Program, such as review and audit of vendors, con-sultants, and contractor's Quality activities.
ETibbs(T.SpecMHK)DN-88 l,: _
v
Mr. M. H. Kleinman (Continued)
- 4. Fomulating and administering FPC's policy with regard to Quality functions.
- 5. Direct the mariagement of Quality Program, Quality Assurance Consultants who perform the Quality Assurance level function for FPC.
1,1 i
, s _- . .
ETibbs(T.SpecMHK)DN-88
TECHNCAL QUAI.IFICATIONS Mr. W. O. May - bbcager, Generation Projects Design
- 1. Job Responsibilities Responsible for the establishtynt of generation projects' design and performance criteria, the coordination of engineering standards, policies and procedt.res, and the coordination of engineering staffing cad training to accomplish the design for major generation projects.
- 2. Education Bachelor of Mechanical Engineering, University of Florida - 1953 Master of Engineering, University of South Florida - 1976 Coteses only:
Georgia Tech - Public Utilities Executive Course, 1969 Florida Power - Professional Management Seminar, 1968 Ceneral Electric - Numerical Methods and Computer Applications, 1963
- 3. Nuclear Training A. B&W Nuclear Plant Indoctrination Course - I week, 8 hours / day, 1968. Included study and review of all aspects of nuclear plant design and operation.
B. "MIT Water Cooled Nuclear Power Reactor Safety" Course - 3 weeks, 8 hours / day.
- 4. Nuclear Experience A. Engineering 1967-68. Control Engineer and Staff Engineer responsible for the design review and construction coordination for mechanical and control systems on all power plant additions, including the establishment of design criteria of Florida Power's nuclear project.
1968-71. Manager of Power Engineering Department and Assistant Nuclear Project !bnager. Florida Power Corporation. Respo nsible f or the direction of engineering activities, scheduling and cost control activities, enviroamental activities , training activities, and quality program activities related to all cajor generation projects, including Crystal River 3 Nuclear Project.
)3
,,9 i '
ETibbs (WAS)D88 > -
Mr. W. O. May (Cont 'd)
- 4. Nuclear Experience B. Quality 1967-68. As Control engineer and Staff Engineer, responsible for quality related design requirements of Crystal River #3 relative to control systems for this project.
1968-71. As >bnager of Power Engineering and Assistant Nuclear Project bbnager, responsible for establishment of the overall quality program design for Crystal River #3 as reflected in the Preliminary Safety Analysis Report.
C. Testing 1967-71. Responsible for developmental work related to testing requirements and testing programs for Crystal R'.ver #3.
D. Other 1971-77. As Ibnager of Economic Research, participated in corporate strategic plans relative to the evaluation of the economics of nuclear power generation as an alternative to fossil base load generation for Florida Power's projected energy
. requirements.
- 5. Summary Mr. >by's experience on a nuclear project (Crystal River #3) is preceded by 14 years (prior to 1967) of experience in the design, construction, startup and testing of 10 Florida Power Corporation steam electric generating plants.
a '
l1
. . . a ETibbs (WOM)D88N
TECHNICAL QUALIFICATIONS Mr. C. R. Pope - Production Administrative Service Manager
- 1. Job Responsibilities Direct, Control and Administer
- 2. Education Three years - University of Florida 1951-1953 - 1955-1956.
- 3. Non-Nuclear Experience Class Time
- 1. Julf 1958 - March 1962 Intermediate Clerk 192 weeks
- 2. February 1962 - January 1963 Senior Clerk 52 weeks
- 3. February 1963 - March 1971 Chief Clerk 416 weeks 660 weeks 12.69 yr.
- 4. April 1971 - August 1974 Administrative Supervisor CR #3
- 5. September 1974 - June 1976 Administrative Manager - Generation Test
- 6. September 1976 - present Production Administrative Service Manager
- 4. Summary Mr. C. R. Pope, Production Administrative Service Manager, graduated from Orlando High School in 1951 and attended the University of Florida, majoring in Business /dministration. He attended vat *ous training schools while in the U. S. Army and served as an instructor in Chemical, Biological, and Radiological Warfare at Fo rt Benning, Georgia. In 1958 he was employed by Florida Power Corporation as an Intermediate Clerk in the Eastern Division's Engineering Department.
He progressed through the various stages of responsibility until in
. 1963 he was named Chief Clerk. As such, he was responsible for building services, clerical operations, security, accounting functions, and record keeping in one of the company's largest divisions. On April 7,1971, Mr. Pope was named Administrative Supervisor CR #3. While their, he was involved in staffing, organizing, and planning the Administrative Sectica of the Nuclear ETibbs (T.SpecCRP)DN88
~
j i '* 4 i , - r
Mr. C. R. Pope (Cont'd)
- 4. Summary (Cont'd)
Plant. In September of 1974 he assumed the duties of Administrative Manager Generation Test De par tment. The f unction of this position was to plan, schedule, supervise and direct the duties and training of testing personnel involved in administrative services, document control and test data collection.
Mr. Pope was promoted to his present position of Production Administrative Service Manager in July 1976. In this position he provides the oversight, direction and management of the Production Department administrative and cost control function.
,4 -
J an ETibbs (T.S pecCRP)D88
TECHNICAL QUALIFICATIONS
[+ . Donald W. Richmond - Director of Safety and Security
- 1. Job Responsibilities
- 1. To provide safety training and engineering for all operating departments of Florida Power Corporation.
- 2. Provide security service on a system-wide basis -- includic.g Crystal River #3.
- 3. Coordinate all liaison with law enforcement agencies in the event of an emergency.
6 Qualifications Licensed Professional Engineer in Safety, Certificate #0647, State of California.
Electric utility industry experience since 1949. First position was in the Transmission and Distribution Construct' 'n area in Phil adel phia , PA, in 1948.
- 3. Nuclear Training None
- 4. Nuclear Experience No formal nuclear experience, but is knowledgeable of power plant operation, construction, and maintenance.
- 5. Summa ry Has been saployed at Florida Power Corporation since 1956; served as journeyman-lineman in Distribution Department prior to becoming Registered Safety Engineer. Entered field of safety officially in 1964; has held tie posizion of Director since 1968.
Member of the American Society of Safety Engineers, American Society of Industrial Security Agents, and American Law Enforcement Officers' Association. Also serves on the Board of Directors of the National Safety Council, West Coast Chapter, Clearwater, FL.
- a 11 <
l , a J ETibbs(T.SpecDWR)DN-88
TECHNCAL QUALIFICATIONS Mr. W. A. Szelistowski - Project Manager, Mid-80's Coal Project
- 1. Job Responsibilities l The function of this position is the management of the licensing, design, procurement, construction and testing of two 800 MW coal-fired ge-eiating units scheduled for operation in the Mid-80's.
- 2. Edt cation Bachelor of Science, Electrical Engineering, Milwaukee School of Engineering - 1956.
Courses only:
University of Florida - Management D,velopment Program.
- 3. Nuclear Training A. B&W Nuclear Plant Indoctrination Course - I week, 8 hours / day, 1968. Included study and review of all aspects of nuclear plant design and operation.
B. "MIT Water Cooled Nuclear Power Reactor Safety" Course - 3 weeks, 8 hours / day.
- 4. Nuclear Experience A. Engineering 1967-1971. As Senior Power Engineer was in charge of electrical and control engineering criteria, design parameters and review of all system designs. ,
1971-1974. As Director of Generation Engineering was responsible for all areas of Engineering Design and equipment procurement for Cry: cal River Unit 1/ 3.
B. Quality 1967-1971. As Senior Power Engineer was responsible for all quality aspects of Crystal River Unit #3 relating to the electrical and control portions of the project.
1971-1974. As Director of Generation F- .neering had the overall responsibility for quality program - related to Crystal River Unit #3 Engineering.
11 *7 i . . ,
ETibbs (WAS)D88
Mr. W. A. Szelistowski (Cont'd)
C. Testing 1967-1974. Ilad the management responsibility for the setting up of the test programs for Crystal River Unit i!3.
D. Other Past member of the IEEE Nuclear Science Group, Power Engineering Society, that are responsible for reviewing and approving standards applicable to the utility industry.
Past member Sub-Committee II of the J.C.N.E.S. that are developing qualification standards for nuclear plant equipment and systems. Registered Professional Engineer in the State of Florida.
- 5. Summary Mr. Szelistowski's direct nuclear experience is preceded by 11 years (prior to 1967) involvement in design, construction, startup and testing of seven Florida Power Corporation steam-electric generating plants. He was responsible for the engineering ef forts involved on two major (fossil) generating units for Florida Power Corporation.
{1 _'U7 i, ,
ETibbs (WAS)D88
TECilNCAL QUALIFICATIONS
!!r. W. R. Watts , Jr. - Manager, Power Plant !bterials
- 1. Job Responsibilities Primary f unctions of this position are to direct the procurement of materials and services, as well as the inventory control and storage of material required for the nuclear plant.
- 2. Education Bachelor of Science in Industrial Management, Georgia Tech, 1961; Master of Business Administration, liniversity of South Florida, 1967.
- 3. Nuclear Training Ile has received corporate level training on the Florida Power Corporation Quality Program, and has par:1cipated and directed training sessions on Quality Operating Procedures for the purchasing a nd s to rage of quality material.
- 4. Nuclear Experience 1975-1977 - Purchasing Agent with responsibility for procurement of variety of utility materials, including supplies for Crystal River #3.
1977-Present - Manager, Power Plant Materials
- 5. Summary
!!r. Watts was employed with Florida Power Corporation in 1970. Prio r to this, he worked as a Contract Administrator for Honeywell, Inc.,
St. Pete rsburg, Florida, gaining several years experience in the procurement field.
Af ter a variety of field assignments for Florida Power, he assumad a Purchasing Agent position in the Purchasing Department where his responsibilities included obtaining procurement data for initial supplies for Crystal River #3 nuclear plant, and establishment of procedures for procurement of maintenance parts to be carried on the Material Management Information System (MMIS).
In his present assignment, he has directed the implementation and necessary updating of the Company Quality Operating Procedures which cover procurement of materials and supplies for the nuclear plant, as well as the receipt of aaterials and storage at the plant site.
1
')
. /
ETibbs(T. S pecWRW)D83
TECHNICAL QUaulFICATIONS Mr. Sidney G. Webber - Senior Risk Analyst
- 1. Job Responsibilities Respnsibilities of this position as they relate to this particular NRC Review and the nuclear facility are to supervise the processing of property and liability claims, assist in the measurement of risks associated with the operation of the plant, and maintaining liaison with insurance company engineers relating to plant inspection, and the follow-up on all inspection recommendations to ensure implementation.
- 2. Edu-As 4 . o af Arts Degree - Business Administration - St. Pe te rsburg Jr. Lu ge.
Bachelor of Arts Degree - Accounting - University of South Florida.
Graduate Studice - Business, Administration - University of South Florida.
- 3. Experience Accountant with the Plant Accounting Department of Florida Power Corporation - 4 years. In present position since July 1979.
ETibbs(T.SpecSGW)D84 51 >,
Table 1 Page 1 of 13 Nuclear Mgmt. Utility Plant Name BS MS PhD Exper. Ex pe r. Exper. NGRC ORS Staff ETO Agee, J. W. EE 11 Al berdi, J. ME 7. 0 21 X Allegood, R. L. X Allen, II. L. ME 23 Allen, L. E. ME 1 9-1/2 Averett, M. W. NS NE 4 4 Bairagdar, M. M. ME 10 ;
10 Baker, J. A. Special 1 X Ed.
Baker, K. B. EE 5 5 Baker, T.L.
Ball, A. M. E 9 Barbour, C. G. 6 6 Barrett, J. E. ME 6 6 X X Baumgardner, J. S. EE 1 5 Bayer, L. CE Baynard, P. Y. --
Chem. & Bus.Adm. Nuclear 6 6 X X X
!!a th Chem.
Beat ty , J r. , G. P. ME 13 4 21 X X X Becker, G. A. i. , ME 6 1 1 ;
RBrigh t (Ex pe r)D79 - - -
Table I Page 2 of 13 Nuclear Mgmt. Utility Plant Name BS MS PhD Exper. Exper. Exper. NCRC ORS Staff ETO Bennet, C. A. X Bingliam, T. R. Business Black, D. B. Indus- 7 7 tr ial Boldt, G. L. E 11 6 X Bonner, R. C. EE 9 2 11 X Borgerson , R. K. ,
X Bourne, T. A. Account- X ing Breaux, P. L. 9 29 X X Breedlove, P. D. X B riglit , R. M. NE 8 8 X X Br illi, C. 11 11 ,
X llros clie , IIL, L. A. ME 2 5 Brown, Jr., U. J. EE Buckner, J. L. X Buell, D. T. ME 9 Burns, Jr., R. S. ME E 6 4 21 Campbe11, D. l.- CE 8 8 1 i Riir igh t (Ex pe r)D79 rO .
Table I Page 3 of 13 Nuclear Mgmt. Utility Plant Name BS !!S PhD Ex pe r. Exper. Exper. NCRC ORS Staff ETO Cannon, 11. I.
Carr, R. E.
Carter, R. P. Manage- 6 3 ment Cason, J. A. 3-1/2 27 Clapp, J. C. Archi- 6 6 tecture Clark, B. W. X Clardy, J. B. Chemistry 12 1 22 X Claar, C. L. X Clauson, R. E. ME 18 4 X Clauss, R. J. Business 4 6 Colby, J. E. E 9 9 Collins, M. E. NE 4-1/2 4-1/2 X X Coo pe r , J. 9 9 X X Crane, B. E. ME 9-1/2 9-1/2 X X Crockett, D. C. E 13 Cronin, J. F.
Cross, W. A. -'
NE 7 5 X X s i RBright(Exper)D79 ; ,
va
Table I Page 4 of 13 Nuclear Mgmt. Utility Plant Name BS MS PhD Exper. Ex pe r. Ex pe r. NCRC ORS Staff ETO Dagostino, P. EE 7 5 Dawson, J. E. ME 4 5 21 Dean, P. E. BA - -
Dorrie, R. S. Construc- 7 9 tion Doyel, C. B.
Du Bo i s , Q. B. NS NE 10 6 9 X X Phys ics Dudley, W. E.
Dumas, Jr., 11. E.
Elder, K. M. ASE ME 2 4 Embach , i!. M. 9 29 X X Evertz, III, 11. A. Business 17 X Farless, D. !!. 7-1/2 22 X Feldhusen, R. L. -
5 X Fergusson, D. E. EE i-1/2 Flynn, D. 1. 10 22 l
?
Foley, M. B. __ E Business 12 Forte, C. M. ME 3 1
RBr iglit (Ex pe r)D79 j
Table 1 Page 5 of 13 Nuclear Mgmt. Utility Plant Name BS MS PhD Exper. Exper. Exper. NCRC ORS Staff ETO Fraze, R. O. ME ME 6 9 Freitag, J. D. Engr. Business 1/2 X Admin.
Friend, A. E. EE 10 12 X Fuller, R. E. X Froats, E. E. CE 11 7 16 Garrison, G. N. 31 Cates, R. W. 21 Goaring, C. G. ' X Colden, W. L. X Gomez, A. L. EE 20 22 Good, E. M. EE 13 15 Griffith, P. E. 17 11 X X llancock, J. A. Physics NE 16 X X liarrison, J. L. ,Architec- Biochem. 5 5 X X ture liebb, G. P. 15 15 X X liebb, Jr. , M. F. _ _ ,
BEE 21 liedlund , R. C. 22 i .
RBr igh t (Ex pe r)D79 >
t.i
Table I Page 6 of 13 ,
Nuclear Mgmt. Utility Plant Name BS MS PhD Ex pe r. Ex pe r. Exper. NCRC ORS Staff ETO llenry, P. C. EE E 7 20 lienson , M. C. 4 X lierbert, W. II. X llerring, R. A. 2 X
!!icks, J. C. Metal- 5-1/2 X lurgy liiggins , !!. E. ME 5 llines, Jr., A. II. ME 28 Ilocket t , J r. , O. 11. CE 17 Ilobbs, Jr., J. C. NE EE 16 15 X 1101 t , J . E. EE 1 llo r ton , C. O. 28 liudson, F. O. 35 X llurley, L. D. ME X Jackson, E. C. 12 21 Johnson, S. W. ME 4 g X Johnson, W. C.
Ka r rh , C. J. 4 6 cs RBrigh t(Ex pe r)D79
Table I Page 7 of 13 Nuclear Mgot. Utility Plant Name BS MS PhD Ex pe r. Exper. Ex pe r. NGRC ORS Staff ETO Katterhenry, A. A. EE NE 19 19 X Kelley, L. C. 13 3 X Kempe r , W. E. 12 6 X Keppeler, J. G. ME 8 X Klein, W. R. EE NE 11 11 X Kleinman, M. 11. ME 13 10 X Kraiker, J. R. 8-1/2 21 X X Kulik, J. EE . 3 LaBorde, D. J. EE -
7 Leigh, A. B. ME 2 27 Lucas, II. B. 9 !4 X X Lucas, I. B. X Lutkehaus, T. C. EE 9 18-1/2 X McClure, III, J. A.
McGee, J. A. X McKee, P. F. NE ME 11 15 X X McLaughlin , R. L. Physics 7 7 X RBrigh t (Ex pe r)D79 ; 3
'4
Table 1 Page 8 of 13 Nuclear Mgmt. Utility Plant Name BS MS PhD Exper. Ex pe r. F2pe r. NGRC ORS Staff ETO Mack, J. E. CE 5 6 X Maloney, J. V. ME Business 8
!!arsliall, B. J. EE 38 Marshall, G. W.
Mathew, !!. W. X May, W. O. ME t. 4 11 13 Megahan, F. N. Chemistry 16 17 Miller, !!. S. Chemistry 5
!! iller , T. A. 19 6 X X Miller, T. S.
Montemayor, R. 4 2 26 Moore, C. C. IE E 8 22 Morea, E. M. ME 3 3 Morneault, A. W. EE 9 12 Morrison , J r. , D. A 16 16 X
!!ount , T. N. X Neiser, R. W. _ Law 1 13 RBr igh t (Ex pe r)D79 '
L
Table 1 Page 9 of 13 Nuclear Mgmt. Utility Plant Name BS MS PhD Ex pe r. Ex pe r. Exper. NCRC ORS Staff ETO Nelson, A. T.
Nichols, W. R. 19 21 X Nisula, W. W. CE 5 7 Nusbickel, Jr., D. C. EE 10 2 10 0'Brien, W. S. ME NE 5 16 Obmann, R. G. Math 14 X Odom, R. E X Ohanian, M. J. X Olson, D. D. X Ormston, A. J. ME 15 40 0'Shea, D. !! X Pachos, C. CE 11 24 Padilla, A. A. ME i 4 ,
Parker, J. L. liigh X School .
Parnelle , Jr. , R. E. Forestry ME 4 10 Parrish , J. J. x Pedrick, IV, D. W. _.- X 5 X RBr igh t(Ex pe r)D79 ,
}
y
Table I Page 10 of 13 Nuclear Mgmt. Utility Plant Name BS MJ PhD Ex pe r. Exper. Exper. NCRC ORS Staff ETO Perkins, G. D. 11 17 X X Perrey , II. M. 13 2 Peterson, N. A. E 3-1/2 Pe yi ng haus , R. R. X Pittman, W. C. 6 11 X Pluebell, F. W. 7 21 X X Pope , C. R. 5 21 Porter, D. E. EE 5 10 X Reeder, 11. E. 9 31 X X Reilly, III, W. P. EE 7 Richmond, D. W. O 11 23 Robinson , Jr. , M. X Rogers, R. E.
Rottloff, R. II. E 7 7 Rowland, D. J. ME 18 ? 18 Ruppel, J. G. EE 1 6 Ruszala, G. 11. 15 12 15 X RBr igh t(Ex pe r)D79 d
Table I Page 11 of 13 ,
Nuclear Mgmt. Utility Plant Name BS EL> PhD Expe r. Exper. Ex pe r. NCRC ORS Staff ETO Schmiedel, R. P. E 2 6 Shook, D. A. EE 9 12 X Simpson, E. C. X X Smith, R. 11. ASEE 15 13 Smith, T. L. BA-Mass 6 X Comm.
Sn i ge s , C. R.
S pa ke , N. B. IE 5 23 Stanbrough, S. L. 12-1/2 Stewart, W. P.
Stocky, D. G EE 29 Sudduth, N. L. 20 Sullivan, W. J. Business 17 X Swyers, W. A. ME 10 Szellstowski, W. A. EE 12 8 23 Takami, R. S ME 6 Taylor, B. A. _
EE 6 6 Thompson, D. L. Math 5 3 X RBr igh t (Ex pe r)D79
Table 1 Page 12 of 13 e
Nuclear Mgmt. Utility Plant Name BS MS PhD Ex pe r. Exper. Exper. NCRC ORS Staff ETO ,
Tierney, D. J. Chem. E 5 Tittle, L. B. ME 4-1/2 5 X X Triplett, T. E. Indus- 7 5 X t rial Turner, L. G. ME 9 Ulm, S. F. EE 3 5 Vattamattam, J. V. CE 1 11 Vogt, A. P. X Vogel, K. O. EE 5 11 X Voigts, D. K. Biology Zoology Zoology 1 X Ward, W. D. X Wareham, J. G.
Watsey, S. E 22 Watts, Jr., W. R. IM r, 9 3 9 Wayble, T. II. 8 21 X X Webber, S. G. A 4 4 Welch, E. E. __
EE 5 3 X Weller, III, G. !!. EE 7 X West, D. W. ME 5 5 15 RBright(Exper)D79 IJ
Table 1 Page 13 of II'.
Nuclear Mgmt. Utility Plant Name BS MS PhD Ex pe r. Ex pe r. Exper. NCRC ORS Staff ETO ,
Westafer , G. R. ME NE 9 9 X X Widell, R. C. HE 6 1 Williams, C. M. X Williamson, R. II. Business 2 Wright, J. R. 25 25 X W
i w^
RBr ight (Ex pe r)D79 j}}