ML19308D113

From kanterella
Revision as of 12:48, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards RO-77-02
ML19308D113
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/11/1977
From: Stewart W
FLORIDA POWER CORP.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19308D114 List:
References
CS-77-6, NUDOCS 8002270600
Download: ML19308D113 (1)


Text

- _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

$$ $2 rA F69%a .

( h IQ t*e

'fu,yn, ne

, D PILgCQpg ,

@M 11 January 1977 . . ,

gy CS-77-6 . .' f 'L'% ,

ca.......a. 3-0-3-a-1 J

.s Mr. Norman C. Moseley, Director Crystal River Unit 3 Of fice .of Inspection and Enforcement Docket No. 50-302 U. S. Nuclear Regulatory Commission License #DPR-72 230 Peachtree St., N.W., Suite 818 Licensee Event Report 77-2 Atlanta, Georgia 30303

Dear Mr. Moseley:

This report is submitted in accordance with Technical Specification 6.9.1

~

and Regulatory Guide 1.16, Revision 4, Section 2.b. (3), as a written Thirty (30) Day Report.

Makeup Pump 3C (MUP-3C) was started with a suction cross-over valve closed.

g The pump was stopped immediately, and no damage occurred. Redundant systeme LI were available.

Very truly yours, FLORIDA POWER CORPORATION 1  !

.j)

- C.LCib O W. P. Stewart  ;

Director, Powcr Production '

I i

I DWP/ feh Enclosure l

l

/ # 00$

Nuclear Plant Manager r%

[

V) 8 002 270 dM

_f' General Office 3201 Thirty-fourth Street South e P O Box 14042. St Petersburg, Florida 33733 813-866-5151 1