Summary of Meeting with Omaha Public Power District to Discuss Resubmittal of Measurement Uncertainty Uprate for Fort Calhoun Station
ML050880143
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 04/29/2005
From: Wang A
NRC/NRR/DLPM/LPD4
To:
Omaha Public Power District
Wang A, NRR/DLPM, 415-1445
Shared Package
ML050880159 List:
References
Download: ML050880143 (5)


Text

April 29, 2005 LICENSEE: Omaha Public Power District (OPPD)

FACILITY: Fort Calhoun Station, Unit 1

SUBJECT:

SUMMARY

OF MEETING TO DISCUSS RESUBMITTAL OF THE MEASUREMENT UNCERTAINTY UPRATE FOR FORT CALHOUN STATION On March 3, 2005, the Nuclear Regulatory Commission (NRC) staff conducted a closed meeting with OPPD to discuss its resubmittal of the measurement uncertainty uprate (MUR).

A list of attendees is attached. The non-proprietary version of the presentation slides are in ADAMS under Accession No. ML050630097.

During the implementation of the MUR in January 2004, OPPD experienced discrepancies in the main feedwater flow readings from the CROSSFLOW system. As a result OPPD was not able to implement the CROSSFLOW system and requested to have the authorized power level returned to the level prior to the approval of the MUR amendment. OPPD with its contractors have resolved the problems with the use of the CROSSFLOW system at the Fort Calhoun Station. OPPD discussed its proposed solution to the discrepancies found in the flow measurements. OPPD stated it will resubmit the MUR amendment in late March 2005. The amendment will justify a new power level based on the revised analysis and testing performed on the CROSSFLOW system. OPPD noted that they believe the new proposal, in general, will be bounded by the previous approval, and therefore the NRC staff review can be limited only to the proposed changes from the previous amendment request. The NRC staff noted that this approach seems reasonable but they will need the submittal to make that determination.

As a result of the meeting the NRC staff requested several actions of OPPD to support our review.

The staff requested that OPPD provide the following:

1. Provide the CROSSFLOW feedwater flow uncertainty calculation for NRC review.
2. The license amendment request (LAR) should include an explanation of the phrase "fully developed flow" as noted in CENPD-397-P-A, Revision 1, as it has been replaced by the phrase stable flow where the fluid is also subcooled and isothermal.
3. The LAR should include the basis for concluding that the requested 1.5 percent uprate is bounded by analyses previously submitted and approved.

Omaha Public Power District In addition the NRC staff agreed to provide the following:

1. Verify that a global bounding statement for a 1.5 percent uprate will be acceptable.
2. Verify that OPPD's implementation of ISA S67.04.02 (Method 3) was adequately addressed in the previous request for additional information responses and the safety evaluation report for Amendment 224. (Note: these documents were References 5, 6, and 7 in the draft LAR).

The NRC staff thanked OPPD for the presentation and asked OPPD to keep us informed of the progress of the amendment.

/RA/

Alan Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285

Attachment:

List of Meeting Attendees cc w/att: See next page

Omaha Public Power District In addition the NRC staff agreed to provide the following:

1. Verify that a global bounding statement for a 1.5 percent uprate will be acceptable.
2. Verify that OPPD's implementation of ISA S67.04.02 (Method 3) was adequately addressed in the previous request for additional information responses and the safety evaluation report for Amendment 224. (Note: these documents were References 5, 6, and 7 in the draft LAR).

The NRC staff thanked OPPD for the presentation and asked OPPD to keep us informed of the progress of the amendment.

/RA/

Alan Wang, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-285 DISTRIBUTION:

PUBLIC TMensah

Attachment:

List of Meeting Attendees PDIV-2 Reading RTadessee RidsNrrPMAWang RidsRgn4MailCenter(MHay) cc w/att: See next page RidsOgcRp SMiranda RidsAcrsAcnwMailCenter EMarinos RidsNrrDlpm(TMarsh/JLyons) IAhmed RidsNrrDlpmPdiv(HBerkow) CGrimes RidsNrrLALFeizollahi JCalvo Non-Prop. Slides: ML050630097 Prop. Slides: ML050630092 Meeting Notice: ML050490282 PKG: ML050880159 ACCESSION NO.: ML050880143 NRC-001 OFFICE PDIV-2/PM PDIV-2/LA PDIV-2/SC EEIB/SC NAME ABWang:sp LFeizollahi RGramm EMarinos DATE 4/04/05 3/30/05 4/29/05 4/29/05 OFFICIAL RECORD COPY

Ft. Calhoun Station, Unit 1 cc:

Winston & Strawn Mr. Daniel K. McGhee ATTN: James R. Curtiss, Esq. Bureau of Radiological Health 1400 L Street, N.W. Iowa Department of Public Health Washington, DC 20005-3502 401 SW 7th Street, Suite D Des Moines, IA 50309 Chairman Washington County Board of Supervisors Mr. R. T. Ridenoure P.O. Box 466 Division Manager - Nuclear Operations Blair, NE 68008 Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

Mr. John Hanna, Resident Inspector Post Office Box 550 U.S. Nuclear Regulatory Commission Fort Calhoun, Nebraska 68023-0550 P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Sue Semerera, Section Administrator Nebraska Health and Human Services Systems Division of Public Health Assurance Consumer Services Section 301 Cententiall Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. John B. Herman Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.

P.O. Box 550 Fort Calhoun, NE 68023-0550

CLOSED MEETING WITH OMAHA PUBLIC POWER DISTRICT (OPPD)

LIST OF ATTENDEES March 3, 2005 OPPD S. Gambhir J. Gasper T. Matthews Westinghouse C. T. French J. McInerney AMAG V. Askari A. Lopez NRC C. Grimes J. Calvo E. Marinos A. Wang I. Ahmed S. Miranda Attachment