Letter Sequence Acceptance Review |
---|
TAC:MC3743, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) TAC:MC3744, (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML041980222, ML042370100, ML050590036, ML051150191, ML051160036, ML051320148, ML051430036, ML051570381, ML051660602, ML052290397, ML060530185, ML060670304, ML060680586, ML060680590, ML060680596, ML060680599, ML060720253, ML060720272, ML060720273, ML060720281, ML060720293, ML060720295, ML060720298, ML060720303, ML060720354, ML060880464, ML060880469, ML061040217, ML061660002, ML061770163, ML061840027, ML061910705, ML062050056, ML062090482, ML062090555, ML062120411, ML062130163, ML062130343, ML062200277, ML062210102, ML062220647, ML062270240, ML062360160, ML062400472, ML062510022, ML062510371, ML062510374, ML062510382, ML062510385, ML062620064... further results
|
MONTHYEARML0607202531975-05-23023 May 1975 May 23, 1975 - Final Summary Report Unit 2 Startup Project stage: Other ML0606805861975-05-23023 May 1975 May 23, 1975 - Final Summary Report Startup, Enclosure 4 Project stage: Other ML0607202721977-05-0909 May 1977 May 9, 1977 - Final Summary Report Unit 3 Startup Project stage: Other ML0606805901977-05-0909 May 1977 May 9, 1977 - Final Summary Report Startup, Enclosure 5 Project stage: Other ML0607202731992-11-30030 November 1992 a Guide for Environmental and Best Management Practices for Tennessee Valley Authority Transmission Construction and Maintenance Activities Project stage: Other ML0607202982001-03-13013 March 2001 Environmental Assessment Bear Creek Reservoirs Land Management Plan Project stage: Other ML0607202952001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan, Resource Stewardship Bear Creek Watershed Project stage: Other ML0606805992001-03-31031 March 2001 Bear Creek Reservoirs Land Management Plan Project stage: Other ML0419802222004-07-0909 July 2004 Technical Specification 436 - Increased Main Steam Isolation Valve Leakage Rate Limits and Exemption from 10CFR50, Appendix J Project stage: Other ML0423701002004-08-23023 August 2004 Browns Ferry, Ltr, Framatome Proprietary Review Project stage: Other ML0423708492004-08-23023 August 2004 (BFN) - Unit 1- Proposed Technical, Specifications (TS) Change TS - 431 - Request for License Amendment - Extended Power Uprate (EPU) Operation Probabilistic Safety Assessment (PSA) Update Project stage: Request ML0429202832004-11-18018 November 2004 Ltr, Results of Acceptance Review for Extended Power Uprate Project stage: Acceptance Review ML0431004762004-11-18018 November 2004 Ltr, Results of Acceptance Review for EPU Project stage: Acceptance Review ML0433701792004-12-29029 December 2004 RAI Re Extended Power Uprate Project stage: RAI ML0434400452004-12-30030 December 2004 RAI, Extended Power Uprate Project stage: RAI ML0500303612005-01-0606 January 2005 Ltr, Request for Information for Status of Amendment (Tac No. MC1330, MC1427, MC2305, MC3812, MC4070, MC4071, MC4072, MC4161, MC3743, MC3744) Project stage: RAI ML0505900362005-02-16016 February 2005 Enclosure 2, 02/01/2005 Conference Call with TVA Presentation Slides on TS Changes Using Method 3 for Interim Solution Project stage: Other ML0505601502005-02-23023 February 2005 Response to NRC Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0505603372005-02-23023 February 2005 (BFN) - Response to Nrc'S Acceptance Review Letter and Request for Additional Information Related to Technical Specifications Change No. TS-418 - Request for Extended Power Uprate Operation (Tac Nos MC3743 and MC3744) Project stage: Request ML0607202932005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry Nuclear Plant with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0606805962005-02-28028 February 2005 Hydrothermal Modeling of Browns Ferry with Units 1, 2, and 3 at Extended Power Uprate Project stage: Other ML0511501912005-04-19019 April 2005 Enclosure 3, Ltr, Licensing Action Status and Interdependencies Project stage: Other ML0511702442005-04-25025 April 2005 (BFN) - Unit 1 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0511702422005-04-25025 April 2005 (BFN) - Units 2, and 3 - Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS-418 - Request for Extended Power Uprate Operation Project stage: Request ML0514300362005-05-20020 May 2005 Response to Nrc'S Letter on Licensing Action Status and Interdependencies, Project stage: Other ML0513201462005-05-27027 May 2005 EPU Acceptance Review Results to Increase Maximum Authorized Power Level (TAC No. MC3743, MC3744) (TS-418) Project stage: Acceptance Review ML0515802492005-06-0606 June 2005 Response to Nrc'S Request for Additional Information Related to Technical Specifications (TS) Change No. TS - 431 - Request for License Amendment Extended Power Uprate (EPU) Operation Project stage: Request ML0516403912005-06-0606 June 2005 Response to Technical Specifications (TS) Change No. TS-418 - Request for License Amendment - Extended Power Uprate (EPU) Operation Project stage: Request ML0517902372005-06-24024 June 2005 Part 21 Notification - Critical Power Determination for G314 and GE12 Fuel with Zircaloy Spacers, 06/24/2005 Project stage: Request ML0513201482005-06-29029 June 2005 Ltr., Ind FRN Facility Operating License for EPU and Opportunity for a Hearing Project stage: Other ML0515703812005-06-29029 June 2005 Fanp, Withholding Information from Public (TACs MC3743, MC3744) Project stage: Other ML0516606022005-06-29029 June 2005 Ltr., Withholding Public Disclosure for GE Company (TACs MC3743, MC3744) Project stage: Other ML0511600362005-07-0101 July 2005 Notice of Consideration of Issuance of Amendment and Notice of Opportunity for a Hearing Regarding Extended Power Uprate (Tac No. MC3743, MC3744) Project stage: Other ML0518703902005-07-0707 July 2005 06/08/05, Meeting Summary with TVA and Framatome Regarding Fuel Analysis Methodology, Enclosure 2, Framatome Presentation Project stage: Meeting ML0520706042005-07-26026 July 2005 Notice of Meeting with Tennessee Valley Authority (TVA) BFN Units 1, 2, and 3, and Sequoyah Units 1 and 2 on Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0524204912005-08-23023 August 2005 Ltr., GE Request for Withholding Information from Public on Steam Dryer Analysis for EPU Conditions Project stage: Withholding Request Acceptance ML0522901442005-09-0202 September 2005 Summary of Meeting with the Tennessee Valley Authority Regarding Plant-Specific Resolution of Instrument Setpoint Concerns Project stage: Meeting ML0522903972005-09-0202 September 2005 TVA Handout Method 3 Issue BFN Proposed Resolution Project stage: Other ML0524303412005-10-0303 October 2005 RAI, Extended Power Uprate (TS-431) (Tac No. MC3812) Project stage: RAI ML0525104462005-10-0303 October 2005 Request for Additional Information Regarding Extended Power Uprate Project stage: RAI ML0535601862005-12-19019 December 2005 Response to NRC Round 2 Request for Additional Information Related to Technical Specifications Change No. TS-418-Request for Extended Power Uprate Operation Project stage: Request ML0535601942005-12-19019 December 2005 Response to NRC Round 2 Requests for Additional Information Related to Technical Specifications Change No. TS-431 - Request for Extended Power Uprate Operation Project stage: Request ML0535601202005-12-22022 December 2005 Request for Additional Information, Information Concerning Extended Power Uprate Project stage: RAI ML0535601772005-12-22022 December 2005 Request for Additional Information, Concerning Extended Power Uprate Project stage: RAI ML0535703412006-01-19019 January 2006 Revised Schedule for Response to Extended Power Uprate Requests for Additional Information Project stage: RAI ML0614502612006-02-0101 February 2006 Response to NRC Request EMEB-B.6 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-431- Request for Extended Power Uprate. Project stage: Request ML0603207332006-02-0101 February 2006 Response to NRC Request EMEB-B.7 from NRC Round 2 Requests for Additional Information Related to Technical Specification (TS) Change No. TS-418 - Request for Extended Power Uprate Project stage: Request ML0603901352006-02-0808 February 2006 Forthcoming Meeting with Tennessee Valley Authority, to Discuss Various Topics Regarding Tva'S Extended Power Uprate Amendment Request for the Browns Ferry Nuclear Plant, Units 1 and 2 and 3 Project stage: Meeting ML0607202812006-02-28028 February 2006 NEDO-33173, Applicability of GE Methods to Expanded Operating Domains. Project stage: Other ML0606203072006-02-28028 February 2006 Technical Specifications Change TS-418 - Response to Request for Additional Information SPSB-A.11 Regarding Extended Power Uprate - Credit for Net Positive Suction Head Project stage: Response to RAI 2005-02-28
[Table View] |
|
---|
Category:Letter
MONTHYEARML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) ML24190A1292024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints ML24185A1512024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) ML24176A1022024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 ML24141A2462024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24123A2012024-05-0202 May 2024 NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000259/2024404, 05000260-2024404, 05000296/2024404) and Request for Information ML24122A6852024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report and Offsite Dose Calculation Manual CNL-24-036, – 10 CFR 50.46 Annual Report2024-04-25025 April 2024 – 10 CFR 50.46 Annual Report ML24116A2522024-04-25025 April 2024 Site Emergency Plan Implementing Procedure Revision ML24115A1652024-04-24024 April 2024 Breaker Trip Automatically Started an Emergency Diesel Generator 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup2024-04-22022 April 2024 Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A2302024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24108A1832024-04-17017 April 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update ML24106A2572024-04-16016 April 2024 Ltr to Federally Recognized Tribes-Yahola, Kialegee Tribal Town ML24102A0422024-04-16016 April 2024 Ltr to State Recognized Tribes-Russell, Cherokee Tribe of Northeast Alabama 2024-09-03
[Table view] |
Text
May 27, 2005 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 2 AND 3 EXTENDED POWER UPRATE ACCEPTANCE REVIEW RESULTS (TAC NOS. MC3743 AND MC3744) (TS-418)
Dear Mr. Singer:
By letter dated June 25, 2004, Tennessee Valley Authority (TVA), the licensee, submitted an amendment request for Browns Ferry Nuclear Plant (BFN), Units 2 and 3. The proposed amendment would change the BFN, Units 2 and 3, operating licenses to increase the maximum authorized power level from 3458 megawatts thermal (MWt) to 3952 MWt. This change represents an increase of approximately 15 percent above the current maximum authorized power level, and is commonly referred to as an extended power uprate (EPU).
In a letter dated November 18, 2004, and during a teleconference held on February 17, 2005, the U.S. Nuclear Regulatory Commission (NRC) staff provided the results of its acceptance review and described the areas where additional information was required to complete the application. TVA responded in letters dated February 23, and April 25, 2005. The NRC staff has reviewed the information provided and determined that sufficient information has been provided to begin the technical review of your application.
The EPU review standard, associated topical reports, and other related EPU regulatory guidance, indicates that unique features require the submission of site-specific information at a level of detail consistent with the complexity of the issues. A core analysis that provides fuel-dependent analyses that demonstrate, at the EPU condition, the core and fuel performance will satisfy all safety and regulatory requirements is needed. It is the NRC staffs understanding that Unit 2 will be fueled with a mix of Framatome ATRIUM-10 and General Electric GE14 fuel types and Unit 3 will be fueled with a full core of Framatome ATRIUM-10 fuel at the time of EPU implementation. In addition, as discussed with your staff on February 10, 2005, the results of a site-specific operating cycle core safety analysis (supplemental reload licensing report), which should be bounding for the first cycle of EPU operation, should be provided as soon as it becomes available, but no later than 6 months prior to your planned EPU implementation dates.
K. Singer In your letter dated June 25, 2004, you stated that you intend to implement the power uprate, if approved, on Unit 2 in the spring of 2007, and on Unit 3 in the spring of 2008. The NRC staff understands that these dates are your need dates and will endeavor to complete review of your application by the spring of 2007. If our understanding of your need date is incorrect, or if your need date changes, please send written notification to the staff promptly.
If you have any questions, please contact the BFN, Units 2 and 3, Project Manager, Ms. Eva Brown, at (301) 415-2315.
Sincerely,
/RA/
Edwin M. Hackett, Director Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-260 and 50-296 cc: See next page
ML051320146 NRR-106 OFFICE PDII-2/PM PDII-2/LA NRR/ADPT/DSSA/SR PDII-2/SC PD-II/D NAME MChernoff for EBrown via e-mail BClayton FAkstulewicz MMarshall EHackett DATE 5/26/05 5/26/05 5/16/2005 5/26/05 5/27/05
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 2 AND 3 EXTENDED POWER UPRATE ACCEPTANCE REVIEW (TAC NOS. MC3743 AND MC3744)
DATE: May 27, 2005 Distribution:
PUBLIC JFair PDII-2 R/F JTatum OGC LMarsh/JLyons ACRS EMarinos EBrown DThatcher MChernoff SWeerakkody BClayton (hard copy) HLi EHackett RPettis JStang MStutzke LRhaghavan NIqbal TChan BSheron DTrimble RJenkins RDennig SKlementowiz DRoberts CHinson LLund RPederson GGeorgiev MRubin JBongarra NTrehan EThrom RMatthew JTappert SCoffin FAkstulewicz MKhanna MMasnik DFischer GThomas MYoder MMarshall LLambrois KManoly EImbro SJones SCahill, RII CWu SShaeffer, RII TScarborough
Mr. Karl W. Singer BROWNS FERRY NUCLEAR PLANT Tennessee Valley Authority cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Fredrick C. Mashburn Nuclear Operations Senior Program Manager Tennessee Valley Authority Nuclear Licensing 6A Lookout Place Tennessee Valley Authority 1101 Market Street 4X Blue Ridge Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 Mr. Larry S. Bryant, General Manager Nuclear Engineering Mr. Timothy E. Abney, Manager Tennessee Valley Authority Licensing and Industry Affairs 6A Lookout Place Browns Ferry Nuclear Plant 1101 Market Street Tennessee Valley Authority Chattanooga, TN 37402-2801 P.O. Box 2000 Decatur, AL 35609 Mr. Michael D. Skaggs Site Vice President Senior Resident Inspector Browns Ferry Nuclear Plant U.S. Nuclear Regulatory Commission Tennessee Valley Authority Browns Ferry Nuclear Plant P.O. Box 2000 10833 Shaw Road Decatur, AL 35609 Athens, AL 35611-6970 General Counsel State Health Officer Tennessee Valley Authority Alabama Dept. of Public Health ET 11A RSA Tower - Administration 400 West Summit Hill Drive Suite 1552 Knoxville, TN 37902 P.O. Box 303017 Montgomery, AL 36130-3017 Mr. John C. Fornicola, Manager Nuclear Assurance and Licensing Chairman Tennessee Valley Authority Limestone County Commission 6A Lookout Place 310 West Washington Street 1101 Market Street Athens, AL 35611 Chattanooga, TN 37402-2801 Mr. Kurt L. Krueger, Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609