(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
NRC Cy 2004 Annual Assessment Meeting, McGuire Nuclear StationML051990261 |
Person / Time |
---|
Site: |
McGuire, Mcguire |
---|
Issue date: |
04/19/2005 |
---|
From: |
NRC/RGN-II |
---|
To: |
|
---|
References |
---|
Download: ML051990261 (17) |
|
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24302A0702024-10-28028 October 2024 Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML21236A2862021-08-30030 August 2021 License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18239A3682018-08-27027 August 2018 License Amendment Request Pre-Submittal Conference Call August 29, 2018 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17278A1342017-10-0404 October 2017 Duke Presentation for Public Meeting 09-20-17 ML16242A2382016-08-30030 August 2016 Catawba/Mcguiproposed Changes to Technical Specification 3.8.1, AC Sources - Operating. ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13218B2272013-08-0606 August 2013 Vital Battery Replacement, 08-05-13 ML13210A3002013-07-30030 July 2013 Proposed Relief Request 13-MN-002 Risk-Informed/Safety Based (Ris_B) ISI Alternative for Class 1 and 2 Piping ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12206A3252012-08-0707 August 2012 G20120513/EDATS: OEDO-2012-0436 - Briefing Book for Meeting with Duke Energy on August 7, 2012 ML12188A0712012-07-11011 July 2012 G20120473/ EDATS: OEDO-2012-0404 - Briefing Book - Briefing Package for Meeting with Duke Energy on July 11, 2012 ML12128A0522012-05-0303 May 2012 Annual Assessment Meeting, Slides ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & ML0927304602009-10-0707 October 2009 09/01/2009 Summary of Conference Call with Duke Regarding Responses to Generic Letter (GL) 2004-02. Meeting Handouts ML0833000612008-11-24024 November 2008 Meeting Slides for Category 1 Public Meeting with Duke Energy Carolinas, Regarding a Request for Additional Information on Duke'S Response to GL 200-04 ML0826708642008-09-18018 September 2008 Regulatory Conference - Service Water Strainer Backwash System ML0819903672008-07-15015 July 2008 Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion ML0719903572007-04-30030 April 2007 EOC Meeting Slides ML0611601322006-04-25025 April 2006 Slides from McGuire Nuclear Station Annual Assessment Meeting ML0519902612005-04-19019 April 2005 NRC Cy 2004 Annual Assessment Meeting, McGuire Nuclear Station ML0510103142005-04-0101 April 2005 Attachment 1, ASME Wall Tap Flow Nozzles for Mur Uprate Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0510103232005-04-0101 April 2005 Attachment 2, Bill of Material - QA Condition 4, Drawing D-4737-2A,18-900# Sch ASME PIC-6 Primary Feedwater Flow Sectionsummary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0502501572004-12-0606 December 2004 Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 ML0421903532004-07-30030 July 2004 Summary of 07/27/2004 Meeting with Duke Energy Corp. Re. Modification to Quality Assurance Program for Catawba, McGuire, and Oconee Nuclear Station, Attachment 2 - Meeting Handouts ML0421501022004-07-20020 July 2004 Presentation of 07/20/2004, Plant Performance Update Meeting (Mcguire) ML0411105312004-04-0808 April 2004 Duke Energy Corporation Meeting Handouts, Enclosure 2, Meeting Summary ML0327206212003-09-24024 September 2003 Examiner - Vendor Matrix with Phone Number ML0327206112003-09-22022 September 2003 Exam Process ML0309806272003-04-0404 April 2003 Annual Assessment Meeting for McGuire Nuclear Station ML0308002472002-12-10010 December 2002 Meeting Handouts December 10-11, 2002 Duke-FPL-NRC Meeting Racksaver Licensing ML0232403132002-11-22022 November 2002 Meeting Summary Enclosure 2 Handouts. Includes NEI Presentation Industry Comments on NRC Program Plan. ML0233301042002-10-0101 October 2002 Enclosure 2 to the 10/01/2002, Summary of Public Meeting with Duke Energy Corporation, Informal Response to McGuire Units 1 & 2 and Catawba Units 1 & 2 Safety Evaluation Report with Open Items ML0215403652002-05-23023 May 2002 Stations Meeting Handouts to Discuss Topical Report DPC-NE-1005P, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 MOX, Submittal by Duke ML0213404582002-05-16016 May 2002 Training Managers Conference Handouts ML0206300272002-02-0505 February 2002 K. Lindquist Northeast Technology Corp 02/05/2002 Meeting Presentation Badger & Racklife. 2024-04-09
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24302A0702024-10-28028 October 2024 Duke Energy Presubmittal Meeting on Adoption of Westinghouse Analysis PAD5/FSLOCA/AXIOM (EPID L-2024-LRM-0121) on October 28, 2024 ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 ML23087A2972023-04-17017 April 2023 Annual Assessment Meeting Presentation ML22325A3142022-11-30030 November 2022 November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) ML22251A2352022-09-14014 September 2022 Presentation Slides for September 14, 2022, Observation Public Meeting ML22109A2122022-04-20020 April 2022 Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation ML22067A1992022-03-0303 March 2022 Annual Assessment Meeting Presentation ML21322A3262021-11-29029 November 2021 Duke Energy November 29, 2021 Pre-Submittal Public Meeting Slides for EOF Relocation Licensing Amendment Request ML21236A2862021-08-30030 August 2021 License Amendment Request for Revision 1 of DPC-NE-1007-P, Conditional Exemption of the End-of-Cycle (EOC) Moderator Temperature Coefficient (Mtc) Measurement Methodology ML21089A1732021-03-30030 March 2021 EOC Slides Final ML21081A1242021-03-22022 March 2021 EOC Slides Final ML20125A2312020-05-0404 May 2020 EOC Slides ML19318F2912019-11-18018 November 2019 Duke Energy Presentation for the Pre-submittal Meeting on November 18, 2019, Regarding the RPV Stud Examination Relief Request ML19214A0562019-08-0707 August 2019 Presentation: Duke Energy Presubmittal Meeting - August 7, 2019 ML18089A0532018-03-30030 March 2018 Summary of Public Meeting with McGuire Nuclear Station ML17278A1342017-10-0404 October 2017 Duke Presentation for Public Meeting 09-20-17 ML16210A0372016-07-28028 July 2016 16-MN-003 1RN884 Pipe Layout Drawing MC-1418-14.41-02 Info Only ML16082A0682016-03-21021 March 2016 Summary of Meeting with the Public Concerning the Annual Assessment of McGuire Nuclear Station, Units 1 and 2 ML15230A5942015-08-10010 August 2015 MNS Ice Condenser Door LAR Presentation - 08/12/15 ML15106A0222015-04-15015 April 2015 Summary of Meeting with Public to Discuss Annual Assessment of McGuire Nuclear Station, Units 1 and 2, in Huntersville, North Carolina ML15099A5872015-04-14014 April 2015 Duke Energy Slides for April 14 Meeting on NFPA-805 for Catawba, McGuire and Robinson ML14136A1302014-05-15015 May 2014 End of Cycle Meeting Summary Memo ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13308A0072013-11-0101 November 2013 Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection. ML13218B2272013-08-0606 August 2013 Vital Battery Replacement, 08-05-13 ML13210A3002013-07-30030 July 2013 Proposed Relief Request 13-MN-002 Risk-Informed/Safety Based (Ris_B) ISI Alternative for Class 1 and 2 Piping ML13127A0802013-04-18018 April 2013 Fleet Fire Protection Program NFPA 805 National Fire Protection Association NFPA 805 Pre-LAR Application for CNS, MNS, RNP ML12128A0522012-05-0303 May 2012 Annual Assessment Meeting, Slides ML11125A0122011-05-0404 May 2011 Summary of Public Meeting with Duke Energy Carolinas, LLC, McGuire, to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for the Period of 01/01/10 - 12/31/10 ML11097A0272011-04-14014 April 2011 Summary of Meeting with Duke Energy Carolinas, LLC, on Upcoming Submittal of License Amendments Regarding Implementation of National Fire Protection Association Standard 805, (TACs ME5767 & ME5768, Catawba 1 & 2 ME5769 & ME5770 Mcguire 1 & ML1034807072010-12-14014 December 2010 Public Meeting Summary - Duke Quality Assurance Program Discussion Meeting ML0833000612008-11-24024 November 2008 Meeting Slides for Category 1 Public Meeting with Duke Energy Carolinas, Regarding a Request for Additional Information on Duke'S Response to GL 200-04 ML0826708642008-09-18018 September 2008 Regulatory Conference - Service Water Strainer Backwash System ML0826708692008-09-18018 September 2008 Nuclear Service Water (Rn) Strainer ML0819903672008-07-15015 July 2008 Handouts from Duke Energy & NRC Meeting - NQA-1 Based QA Program Conversion ML0819805012008-04-22022 April 2008 Annual Assessment Public Meeting; Reactor Oversight Program - Cy 2007, April 22, 2008 ML0734403862007-10-25025 October 2007 Enclosure 3 - McGuire Nuclear Station Regulatory Conference - Foreign Material Found in the Unit 2 ECCS Sump ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0617400102006-05-19019 May 2006 Technical Information Meeting ML0611601322006-04-25025 April 2006 Slides from McGuire Nuclear Station Annual Assessment Meeting ML0519902612005-04-19019 April 2005 NRC Cy 2004 Annual Assessment Meeting, McGuire Nuclear Station ML0510103142005-04-0101 April 2005 Attachment 1, ASME Wall Tap Flow Nozzles for Mur Uprate Summary of Meeting with Duke Energy Corp on Measurement Uncertainty Recapture Power Uprate (Tac No. MC6239, MC6240) ML0502501572004-12-0606 December 2004 Meeting Presentation Slides to 12/06/2004 Summary of Meeting with Duke Energy Corporation to Discuss Appendix R Reconstitution and Transition to NFPA 805 ML0418906002004-04-15015 April 2004 NRC CY2003 Annual Assessment Meeting ML0403506912003-08-27027 August 2003 DRS Open Items Status ML0403502122003-08-13013 August 2003 DRS Open Items Status ML0403506872003-08-0505 August 2003 DRS Open Item Status ML0313301472003-04-29029 April 2003 Plant Performance Update Meeting for McGuire Nuclear Station ML0309806272003-04-0404 April 2003 Annual Assessment Meeting for McGuire Nuclear Station ML0232901842002-11-20020 November 2002 Slides for 11/4/2002 Lrsc Meeting 2024-04-09
[Table view] |
Text
NRC CY2004 Annual Assessment Meeting McGuire Nuclear Station Huntersville, North Carolina April 19, 2005
Purpose of Todays Meeting z A public forum for discussion of McGuires performance z NRC will address McGuires performance issues identified in the annual assessment letter z McGuire Management will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance
Agenda z Introduction z Review of Reactor Oversight Process z National Summary of Plant Performance z Discussion of Plant Performance Results z McGuire Management Response and Remarks z NRC Closing Remarks z Break z NRC Available to Address Public Questions
Region II Organization William Travers Regional Administrator Loren Plisco Deputy Regional Administrator Victor McCree Charles Casto Director Division of Reactor Projects Director Division of Reactor Safety Len Wert Harold Christensen Deputy Director Deputy Director Michael Ernstes Branch Chief Regional Specialists McGuire Project Engineers Resident Inspectors Robert Carroll Joe Brady Brian Anderson Shakur Walker
NRC Performance Goals PRIMARY GOALS Ensure protection of the public health and safety and the environment Ensure the secure use and management of radioactive materials OTHER GOALS
- Ensure openness in NRC regulatory process
- Ensure that NRC actions are effective, efficient, realistic, and timely
- Ensure excellence in NRC management to carry out the NRCs strategic objective
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response
Examples of Baseline Inspections z Equipment Alignment ~92 hrs/yr z Triennial Fire Protection ~200 hrs every 3 yrs z Operator Response ~125 hrs/yr z Emergency Preparedness ~80 hrs/yr z Rad Release Controls ~100 hrs every 2 yrs z Worker Radiation Protection ~100 hrs/yr z Corrective Action Program ~250 hrs every 2 yrs z Corrective Action Case Reviews ~60 hrs/yr
McGuire Nuclear Station Inspection Activities (Jan 1 - Dec 31, 2004) z Approximately 4800 hours0.0556 days <br />1.333 hours <br />0.00794 weeks <br />0.00183 months <br /> of inspection related activities z Engineering and Maintenance Inspections (i.e. ISI and modifications) z Emergency Preparedness Inspection z Operator Licensing Exams and Requalification Inspection z Radiation Protection Inspections z Spent Fuel Material Control and Accounting Inspection z Reactor Pressure Vessel Lower Head Inspection z Reactor Containment Sump Blockage Inspection z Problem Identification and Resolution Inspection
Performance Thresholds Safety Significance Green: Very low safety issue White: Low-to-moderate safety issue Yellow: Substantial safety issue Red: High safety issue NRC Inspection Efforts Green: Only Baseline Inspections White: May increase NRC oversight Yellow: Increased NRC oversight Red: Increased NRC oversight and other NRC actions
Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions
National Summary of Plant Performance Status at End of CY 2004 Licensee Response 78 Regulatory Response 21 Degraded Cornerstone 0 Multiple/Repetitive Degraded Cornerstone 3 Unacceptable 0 Total 102*
- Davis-Besse is under a special inspection process (IMC 0350)
McGuire Nuclear Station Assessment Results (Jan 1 - Dec 31, 2004) z Plant performance was within the Licensee Response Column of the NRCs Action Matrix z All inspection finding were classified as very low safety significance (Green) z All Performance Indicators were Green
McGuire Nuclear Station Annual Assessment Summary (Jan 1 - Dec 31, 2004) z Duke Energy operated McGuire Nuclear Station in a manner that preserved public health and safety z All cornerstone objectives were met
McGuire Nuclear Station Inspection Activities (Jan 1 - Dec 31, 2005) z Baseline Inspections z Safety Issue Inspections of Pressurizer Penetration Nozzles and Steam Space Piping Connections z ISFSI Inspection z Operator Licensing Examinations
McGuire Management Response and Remarks
Contacting the NRC z Report an emergency (301) 816-5100 (call collect) z Report a safety concern:
(800) 695-7403 Allegation@nrc.gov z General information or questions www.nrc.gov Select What We Do for Public Affairs
Reference Sources z Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html z Public Electronic Reading Room http://www.nrc.gov/reading-rm.html z Public Document Room 1-800-397-4209 (Toll Free)