ML082461002

From kanterella
Revision as of 14:26, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Inspection / Activity Plan, 09/01/2008 - 12/31/2009, Report 22
ML082461002
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 09/02/2008
From:
NRC/RGN-II/DRP/RPB4
To:
Shared Package
ML082460989 List:
References
Download: ML082461002 (2)


Text

Page 1 of 2 Robinson 09/02/2008 16:50:55 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type TI-171 - B.5.B PHASE 2&3 3 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/08/2008 09/12/2008 Generic Safety Inspectio EB3ISI - INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 10/06/2008 10/10/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK1 2 2 IP 7112101 Access Control to Radiologically Significant Areas 10/13/2008 10/17/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/13/2008 10/17/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/13/2008 10/17/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/13/2008 10/17/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/13/2008 10/17/2008 Baseline Inspections PSB1-RP - RAD PROTECTION OCCUPATIONAL WK2 2 2 IP 7112101 Access Control to Radiologically Significant Areas 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections 2 IP 7112202 Radioactive Material Processing and Transportation 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 10/20/2008 10/24/2008 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 10/20/2008 10/24/2008 Baseline Inspections EB3TI172 - EB3 TI-172 RCS DM BUTT WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/17/2008 11/21/2008 Generic Safety Inspectio PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 2 IP 7112101 Access Control to Radiologically Significant Areas 12/15/2008 12/17/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTIO PUBLIC BASELINE INSP 4 2 IP 7112101 Access Control to Radiologically Significant Areas 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 01/12/2009 01/16/2009 Baseline Inspections 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 01/12/2009 01/16/2009 Baseline Inspections 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 01/12/2009 01/16/2009 Baseline Inspections OL RQ - REQUAL INSPECTION 2 2 IP 7111111B Licensed Operator Requalification Program 03/02/2009 03/06/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 05/18/2009 05/22/2009 Baseline Inspections 2 IP 7111401 Exercise Evaluation 05/18/2009 05/22/2009 EP Baseline Inspection 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 05/18/2009 05/22/2009 EP Baseline Inspection 2 IP 71151-EP02 ERO Drill Participation 05/18/2009 05/22/2009 Baseline Inspections 2 IP 71151-EP03 Alert & Notification System 05/18/2009 05/22/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Robinson 09/02/2008 16:50:55 Inspection / Activity Plan Report 22 09/01/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 2 IP 71151-EP03 Alert & Notification System 05/18/2009 05/22/2009 Baseline Inspections EB3-HS - HEAT SINK 1 2 IP 7111107B Heat Sink Performance 06/01/2009 06/05/2009 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 2 V23310 ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/06/2009 07/10/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 3 2 V23310 ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 07/27/2009 07/31/2009 Not Applicable OL EXAM - INTIAL EXAM - WEEK2 2 2 V23310 ROBINSON/JULY 2009 EXAM AT POWER FACILITIES 08/10/2009 08/14/2009 Not Applicable EB1-MODS - MODIFICATIONS-10CFR50.59 4 2 IP 7111117B Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 09/28/2009 10/02/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.