ML091520495

From kanterella
Revision as of 05:12, 14 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
05/19/2009 Summary of Annual Assessment Meeting with PPL Susquehanna, LLC to Discuss the Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station Units 1 and 2 for the Calendar Year 2008
ML091520495
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/01/2009
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML091520495 (7)


Text

June 1, 2009 LICENSEE: PPL SUSQUEHANNA, LLC FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MAY 19, 2009, ANNUAL ASSESSMENT MEETING WITH PPL SUSQUEHANNA, LLC On May 19, from 2:30 pm to 5:30 pm, an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center in Berwick Pennsylvania, between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC (PPL). The NRC requested the meeting with PPL management to discuss the NRC=s assessment of the safety performance of the Susquehanna Steam Electric Station Units 1 and 2 for the calendar year 2008.

The NRC presented and discussed its assessment of the safety performance of Susquehanna for the period of January 1 through December 31, 2008. The NRC presentation included information on the Reactor Oversight Process (ROP), summary of national performance assessment results, and the results of NRC=s performance assessment for Susquehanna. As part of this regulatory performance meeting, PPL presented its perspective regarding the plant=s performance during 2008 and operational goals for 2009.

Members of the public, representatives of the Pennsylvania Department of Environmental Protection, and PPL employees observed the meeting. At the end of the meeting between the NRC and PPL, public attendees were offered the opportunity to communicate with the NRC regarding PPLs performance at Susquehanna and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML090620789. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML091050041. The NRC slides can be located in ADAMS with an Accession Number of ML091520130. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Additionally, during the meeting the NRC indicated that another Public Meeting would be held on July 6, 2009, to discus the status of the safety conscious work environment (SCWE) at the site. The SCWE meeting notice with the attached agenda can be found in ADAMS with Accession Number of ML091480583 Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet NRC Slides

2 Questions Submitted by Member of Public

2 LICENSEE: PPL SUSQUEHANNA, LLC FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2

SUBJECT:

SUMMARY

OF MAY 19, 2009, ANNUAL ASSESSMENT MEETING WITH PPL SUSQUEHANNA, LLC On May 19, from 2:30 pm to 5:30 pm, an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center in Berwick Pennsylvania, between the Nuclear Regulatory Commission (NRC) and PPL Susquehanna, LLC (PPL). The NRC requested the meeting with PPL management to discuss the NRC=s assessment of the safety performance of the Susquehanna Steam Electric Station Units 1 and 2 for the calendar year 2008.

The NRC presented and discussed its assessment of the safety performance of Susquehanna for the period of January 1 through December 31, 2008. The NRC presentation included information on the Reactor Oversight Process (ROP), summary of national performance assessment results, and the results of NRC=s performance assessment for Susquehanna. As part of this regulatory performance meeting, PPL presented its perspective regarding the plant=s performance during 2008 and operational goals for 2009.

Members of the public, representatives of the Pennsylvania Department of Environmental Protection, and PPL employees observed the meeting. At the end of the meeting between the NRC and PPL, public attendees were offered the opportunity to communicate with the NRC regarding PPLs performance at Susquehanna and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML090620789. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML091050041. The NRC slides can be located in ADAMS with an Accession Number of ML091520130.

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Additionally, during the meeting the NRC indicated that another Public Meeting would be held on July 6, 2009, to discus the status of the safety conscious work environment (SCWE) at the site. The SCWE meeting notice with the attached agenda can be found in ADAMS with Accession Number of ML091480583 Sincerely, /RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution J. Clifford, DRP J. Bream, DRP S. Collilns, RA P. Krohn, DRP F. Jaxheimer, DRP, SRI M. Dapas, DRA R. Fuhrmeister, DRP P. Finney, DRP, RI D. Lew, DRP A. Rosebrook, DRP S. Farrell, DRP, OA SUNSI Review Complete: JRB (Reviewer=s Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 9 EOC\SSES 2008 AAM Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE R1/DRP R1/DRP NAME ARosebrook/AAR PKrohn /PGK DATE 06/ 01/09 06/ 01/09

3 OFFICIAL RECORD COPY