MONTHYEARML0833702312008-12-0303 December 2008 Project Manager Change for the License Renewal Review for Kewaunee Power Station Project stage: Other ML0833702452008-12-0909 December 2008 Revision of Schedule for the Conduct of Review of the Kewaunee Power Station License Renewal Application Project stage: Approval ML0905300032009-03-23023 March 2009 Request to Supplement the Kewaunee Power Station License Renewal Application in Regards to the Use of the Work Control Process as an Aging Management Program Project stage: Other ML0907607862009-04-0303 April 2009 License Renewal Application Review, Request for Additional Information - Balance of Plant Scoping and Screening Project stage: RAI ML0908609462009-04-15015 April 2009 Revision of Schedule for the Conduct of Review of the Kewaunee Power Station License Renewal Application Project stage: Approval ML0911201992009-04-30030 April 2009 RAI, Review of the License Renewal Application - Scoping & Screening Methodology Project stage: RAI ML0914703822009-05-28028 May 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Kewaunee Power Station License Renewal Application Review Project stage: Other ML0911903892009-07-0707 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Leak-Before-Break Project stage: RAI ML0918109582009-07-13013 July 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Programs Project stage: RAI ML0919000812009-07-13013 July 2009 Scoping and Screening Audit Report Regarding the Kewaunee Power Station, License Renewal Application Project stage: Other ML0918805552009-07-16016 July 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Structures Scoping/Fire Protection Project stage: RAI ML0921006032009-07-28028 July 2009 LRA Review - Slides Public Meeting July 28, 2009 Project stage: Request ML0922306182009-08-0606 August 2009 Response to Request for Additional Information for the Review of the License Renewal Application - Leak Before Break/Boral Project stage: Response to RAI ML0921006122009-08-10010 August 2009 07/28/2009 Summary of Public Meeting Related to the Review of the Kewaunee Power Station License Renewal Application Project stage: Meeting ML0919004492009-08-12012 August 2009 AMP Audit Report Regarding the Kewaunee Power Station, License Renewal Application Project stage: Other ML0923200932009-08-17017 August 2009 Response to Request for Additional Information for Review of License Renewal Application - Aging Management Programs Project stage: Response to RAI ML0921205462009-08-28028 August 2009 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results Project stage: RAI ML0927100452009-09-25025 September 2009 Supplemental Information for the Review of the License Renewal Application - Changes to the Work Control Process Aging Management Program Project stage: Supplement ML0927905852009-10-13013 October 2009 Revision of Schedule for the Conduct of Review of the Kewaunee Power Station License Renewal Application Project stage: Approval ML0923900632009-10-13013 October 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - Aging Management Review Results Project stage: RAI ML0927905822009-10-14014 October 2009 Plan for the Aging Management Program Regulatory Audit Regarding the Kewaunee Power Station License Renewal Application Review Project stage: Other ML0928004412009-10-16016 October 2009 Summary of Conference Call with Dominion Energy Kewaunee Inc., to Discuss the ASME Section XI Inservice Inspection Aging Management Program Project stage: Other ML0918908362009-11-20020 November 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application Project stage: RAI ML0932302572009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Program for Neutron Absorbing Material Project stage: Other ML0932400382009-11-27027 November 2009 Summary of Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Inaccessible Cables Program Project stage: Other ML0932600032009-12-14014 December 2009 Wcp AMP Audit Report Regarding the Kewaunee Power Station License Renewal Application Project stage: Other ML0933104432009-12-16016 December 2009 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs Project stage: RAI ML0934313392009-12-16016 December 2009 Summary of Telephone Conference Call on December 9, 2009, Between Dominion Energy Kewaunee Inc., and U.S. NRC to Discuss Tables Referenced in the Work Control Process Amendment Letter Project stage: Other ML0933103602009-12-17017 December 2009 Safety Project Manager Change for the License Renewal Review for the Kewaunee Power Station Project stage: Other ML0935003062010-01-0404 January 2010 Request for Additional Information Regarding the Review of the Kewaunee Power Station License Renewal Application - AMRs Project stage: RAI ML1001104472010-01-13013 January 2010 Summary of Telephone Conference Call with Dominion Energy Kewaunee, Inc., to Discuss Duplicate RAI Number Project stage: RAI ML1002200662010-01-21021 January 2010 Response to Request for Additional Information for the Review of the License Renewal Application - Aging Management Review/Aging Management Program Project stage: Response to RAI ML1003210772010-02-16016 February 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and USNRC to Discuss Certain Request for Additional Information on Structural Items Project stage: RAI ML1006903992010-03-11011 March 2010 Request for Additional Information for the Review of the Kewaunee Power Station, License Renewal Application Project stage: RAI ML1007107412010-03-31031 March 2010 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the NRC to Discuss Certain RAI Responses on Two Mechanical Systems Project stage: RAI ML1009503792010-04-14014 April 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application Project stage: RAI ML1012504442010-05-10010 May 2010 Revision of Schedule for the Conduct of the Review of the Kewaunee Power Station License Renewal Application TAC MD9408) Project stage: Approval ML1014103222010-05-27027 May 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application Project stage: RAI ML1016003242010-06-16016 June 2010 Letter Change in Schedule for Review of the Kewaunee Power Station License Renewal Application Safety Evaluation Project stage: Approval ML1011903452010-07-15015 July 2010 Transmittal of Kewaunee Safety Evaluation Report with Open Items Related to License Renewal of Kewaunee Power Station Project stage: Approval ML1021601272010-08-0404 August 2010 Record of Conference Call - Discuss Dominion Kewaunee'S Response to Recent Steam Generator Divider Plate RAI Project stage: Other ML1025003572010-09-10010 September 2010 Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application Project stage: RAI ML1023901982010-09-16016 September 2010 08/26/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and NRC Concerning a D-RAI Pertaining to the Kewaunee Power Station License Renewal Application Project stage: RAI ML1024402012010-09-16016 September 2010 08/31/10 Summary of Telephone Conference Call Between Dominion Energy Kewaunee, Inc. and the U.S. Nuclear Regulatory Commission Concerning a Draft Request for Additional Information Pertaining to the Kewaunee Power Station License Renewal A Project stage: Draft RAI ML1030001312010-11-0404 November 2010 Letter- Transmittal of Safety Evaluation Report Related to the License Renewal of Kewaunee Power Station Project stage: Approval ML12233A7332012-08-20020 August 2012 Entergy Pre-Filed Evidentiary Hearing Exhibit ENT000562, Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy Kewaunee, Inc., Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Ap Project stage: RAI ML12340A7312012-08-20020 August 2012 Official Exhibit - ENT000562-00-BD01 - Letter from J. Daily, NRC, to D. Heacock, President, Dominion Energy Kewaunee, Inc., Request for Additional Information for the Review of the Kewaunee Power Station License Renewal Application Project stage: RAI 2009-08-12
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML19260E6952019-09-24024 September 2019 Final 9/24/2019 NEIMA Meeting Slides - Kewaunee ML16190A3462016-06-28028 June 2016 Agenda and Presentation, June 28, 2016, Public Meeting with Dominion, Inc ML13150A1792013-11-19019 November 2013 Void Testing for KPS SI Void to Anderson Lin ML13204A1382013-06-25025 June 2013 2012 End-of-Cycle Slides ML13191B2632013-04-24024 April 2013 F1045 B. Watson Presentation - Decommissioning Process - PSDAR Mtg ML13112A8122013-04-22022 April 2013 Oversight Presentation, Reactor Decommissioning Inspection Program ML13112A7682013-04-22022 April 2013 Power Reactor Decommissioning Process ML13112A7632013-04-22022 April 2013 Post-Shutdown Decommissioning Activities Report ML13112A6812013-04-22022 April 2013 Public Meeting to Discuss the Decommissioning of the Kewaunee Power Station ML13112A8462013-04-22022 April 2013 PSDAR Meeting Public Participation Ground Rules ML13066A3312013-03-0707 March 2013 Regulatory Conference Presentation 3-12-2013 ML1113904092011-05-26026 May 2011 NRC EOC Slide Presentation for Public Meeting ML1013104192010-05-18018 May 2010 Draft Supplement Environmental Impact Statement Meeting Slides March 24, 2010 ML1011304432010-04-21021 April 2010 NRC Slides for Kewaunee End-Of-Cycle Meeting ML0926000182009-09-15015 September 2009 Handout 1 - GSI-191 Resolution for Kewaunee Power Station ML0926006432009-09-15015 September 2009 Handout 3 - Kewaunee Power Station, Agenda Setting Meeting 09/15/09 ML0921006032009-07-28028 July 2009 LRA Review - Slides Public Meeting July 28, 2009 ML0913301112009-05-12012 May 2009 Technical Specifications Project Meeting Handouts ML0911904992009-04-28028 April 2009 Meeting Slides, Kewaunee Power Station - Annual Assessment Meeting, Reactor Oversight Program - 2008 ML0901601222009-01-15015 January 2009 Pre-application Meeting Re. a Future Amendment to Convert the Kewaunee Technical Specifications to the ITS Format ML0830505892008-10-22022 October 2008 License Renewal Public Meeting Presentation Slides ML0809405302008-04-0101 April 2008 Meeting Slides for the Kewaunee End-of-Cycle Public Meeting, Reactor Oversight Program - 2007 ML0809405542008-04-0101 April 2008 Meeting Slides, 2007 NRC End-of-Cycle Plant Performance Assessment Meeting Kewaunee Power Station. ML0727805042007-10-0404 October 2007 Presentation Slides for Kewaunee Public Meeting ML0725306142007-09-21021 September 2007 Public Meeting Summary on the Reactor Oversight Process ML0721904612007-08-0909 August 2007 Appeal of FAQ 69.2 - Emergency Diesel Generator Fuel Oil Line Filling Failure ML0712902162007-05-0808 May 2007 Public Meeting Presentation Slides, Kewaunee Power Station Cross-Cutting Issues. ML0709403952007-03-29029 March 2007 EOC Summary Meeting Slides - 2007, Reactor Oversight Program - Cy 2006 ML0705701032007-02-26026 February 2007 Slides, Summary of January 25, 2007 ML0634604952006-11-30030 November 2006 Slides, Internal Flooding Risk Reduction Activities, from Kewaunee Regulatory Public Meeting ML0631802732006-10-25025 October 2006 Slides for Kewaunee 10/25/06 Summary Meeting ML0618405872006-06-22022 June 2006 Public Meeting Kewaunee - Dominion Presentation Slides - to Discuss Improvement Initiatives ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0604003522006-01-31031 January 2006 Enclosure 2 - Slides on Application of Dominion Safety & Core Design Methods to Kewaunee Power Station (KPS) ML0531903402005-11-0808 November 2005 Kewaunee Management Meeting - Dominion Slides ML0531903272005-11-0808 November 2005 Regulatory Conference Kewaunee Turbine Building Flooding Issues ML0531903382005-11-0808 November 2005 Notice of Meeting with Dominion, Kewaunee Flooding Regulatory Conference Slides ML0527102572005-08-0909 August 2005 EOC 2004 Slides ML0513103532005-05-10010 May 2005 Licensee Slides for Meeting to Discuss AFW Amendment Request and Internal Flooding Design Basis ML0513202602005-04-20020 April 2005 Presentation to NRC - Enclosure 2 to Acknowledgement of Receipt of Letter and Summary of Public Meeting Conducted to Discuss Commitments for the Kewaunee Nuclear Plant Letter ML0508805182005-03-17017 March 2005 NRC Meeting Presentation (Attachment 3) ML0508805102005-03-17017 March 2005 NMC Meeting Presentation (Attachment 2) ML0434900602004-11-30030 November 2004 NMC Slides for 11/30/04 Public Meeting ML0416901562004-06-0202 June 2004 Public Meeting Slides, Kewaunee 2003 End-of-cycle Assessment ML0320305902003-07-18018 July 2003 Submittal of Supplemental Information & Slides from Pre-Decisional Enforcement Conference on 07/16/03 ML0319903322003-07-0303 July 2003 Point Beach/Kewaunee Meeting Summary Slides, Nuclear Management Company'S Reactor Pressure Vessel Head Replacement Project ML0315307202003-04-18018 April 2003 April 18, 2003 - RIC 2003 Presentation - F2 - Chris Bakken - Region III Breakout ML0309205232003-04-0202 April 2003 Public Meeting, Kewaunee Re EOC, Slides ML0210100402002-04-0909 April 2002 EOC Meeting Slides 2019-09-24
[Table view] |
Text
Kewaunee Power Station License Renewal Work Control Process AMP Division of License Renewal Office of Nuclear Reactor Regulation July 28, 2009
3/4Work Control Process (WCP) AMP 3/4WCP is a Plant Specific AMP 3/4WCP used for 1221 AMR Line Items 3/4LRA Submitted August 14, 2008
- NRC Letter - Request for supplemental information (March 23, 2009)
- Dominion Letter - WCP AMP Supplement (April 13, 2009) 2
Kewaunee LRA Review Status
- Scoping and Screening Audit
- Aging Management Program Consistency Audit
- AMP Audit RAIs
- Scoping and Screening RAIs
- Environmental Audit 3
Work Control Process (WCP) - Application in AMRs
- WCP used as global AMP for aging management of numerous, different material-environment-aging effect (MEA) combinations in the LRA (115)
- Staff noted WCP could be applied in one of the following manners:
- verification of the effectiveness of a preventative or mitigative AMP that has been credited for aging management (water chemistry, lube oil, fuel oil)
- for GALL-based AMR line items, either as a replacement for the AMP recommended for aging management in the corresponding AMR line item in the GALL Report or where the GALL AMR is silent on recommending an given AMP for aging management
- as the AMP credited for aging management in a plant-specific AMR
- potentially, as the basis for implementing a particular program element aspect or aspects of a GALL-based AMP in the LRA that is credited for aging management 4
Staff Review of WCP and AMRs Crediting WCP
- NRC Staff reviewed those AMR items in the LRA crediting WCP against the general aging effect identification criteria and aging management program criteria given in Sections A.1.2.1 and A.1.2.2 of NUREG 1800, Appendix A.1 (SRP-LR Branch Technical Position [BTP] RLSB-1)
- In addition, for GALL-based AMR items, the NRC Staff also reviewed the AMR items against the corresponding AMR items in the GALL Report Volumes 1 and 2 and by performing a review of he program elements for the WCP to the program elements in the GALL recommended AMP
- The staff reviewed the program elements for the WCP program against the staffs generic program element criteria and bases for AMP program elements in Section A.1.2.3 of BTP RLSB-1 5
WCP - AMR Application Issues
- When credited for preventative/mitigative AMP effectiveness - AMR basis raises questions on whether this will be done on a periodic or one-time basis and how this can be achieved if the component under review is not one of the ones that will be inspected under the program.
AMR basis raises questions on how the program element for the WCP compare to the program element activities in the GALL Program recommended for aging management in the corresponding AMR item of the GALL report.
- When credited as the AMP for management in a plant-specific AMR item or a GALL-based AMR where the GALL AMR is silent on recommending an AMP for management, ensuring that the program elements of the WCP are conservatively adequate to manage the aging effects associated with the components material and environment.
- When used as the process for implementing a given program element aspect of another GALL-based AMP in the LRA credited for aging management - AMR basis raises the question on how the implementation of the WCP will achieve this and whether it will consistent with program element criteria recommended in the GALL AMP.
6
WCP - Current Aging Management Basis
- Defined as an existing, plant-specific condition monitoring AMP for the LRA
- Uses an undefined random sampling basis for inspection
- Uses past preventative maintenance activity or surveillance test histories to draw an inference that there would be sufficient opportunities to inspect the components in the future and thus to conclude that the program is conservative
- Credited for multiple materials, aging effects, and environments
- Credits that inspection frequencies will range from once every six (6) months to once every 10 years
- Credits undefined sample expansion criteria and acceptance criteria
- Originally included only a limited operating experience discussion 7
WCP Program Element Issues
- Use of a random sampling-based AMP not consistent with the recommendations in BTP RLSB-1. Sampling needs to based on establishing justifying the sample of components that will be inspected on behalf of the population of components for each material-environment-aging effect (MEA) combination being managed by the WCP.
- Aging effects and parameters monitored as providing indication of these aging effects need to be better defined.
- Inspection methods for detecting the parameters that will be indicative of a given aging effect need to be better defined, and may need to include the crediting of either augmented visual techniques, surface examination techniques, or volumetric examination techniques, as based on pertinent relevant operating experience.
- Inspection frequencies and expansion criteria for each MEA managed under the program need to be defined.
- Acceptance criteria for each parameter monitored clearly need to be established
- Relevant operating experience needs to be factored into the establishment of the program element criteria for the AMP.
8
NRC Contact Information Samuel Hernandez Vanice Perin Project Manager Project Manager 301-415-4049 301-415-8143 samuel.hernandez@nrc.gov vanice.perin@nrc.gov http://www.nrc.gov/reactors/operating/licensing/renewal/a pplications/kewaunee.html 9
Work Control Process Work Control Process (WCP)
- Discuss the application of WCP in the LRA
- Break down the AERM managed by WCP
- Describe the alignment of the WCP with GALL (XI.M32 & M38)
- Schedule for supplemental information to facilitate on-going NRC reviews
NUREG-1801
- NUREG-1801 typically specifies that chemistry control programs are to be augmented to verify effectiveness
- NUREG-1801 recommends using a plant-specific program or a program similar to OTI (XI.M32) for the verification
- NUREG-1801 specifies that an alternative acceptable program may include routine maintenance or a review of repair or inspection records to confirm absence of aging
WCP History
- Routine maintenance is the essence of the Dominion WCP
- Based on a historical review, Dominion chose the WCP because more inspection opportunities exist compared to the OTI AMP
- Dominion provided the NRC staff (NRR, Regions I & II) extensive program information during the reviews of the North Anna, Surry and Millstone license renewal applications
WCP History
- The North Anna, Surry and Millstone SERs concluded that the WCP will provide reasonable assurance that aging will be managed in the PEO
- The KPS LRA was developed based on this past precedence
WCP Usage
- Use with Chemistry Programs:
- GALL typically requires verification of chemistry effectiveness
- However, there are several GALL items where verification of chemistry is not required by a OTI
- In these situations, Dominion conservatively applied WCP in addition to the specified chemistry AMP (except ASME Class 1)
- As a result, over 250 additional Table 2 line items in the KPS LRA utilize WCP
WCP Usage
- GALL contains several MEAPs for the various SSCs typically found at a plant
- However, KPS created unique M/E/A groups for systems and structure AMRs that created an additional (~500) LRA Table 2 line items
- In many situations, WCP was credited for managing the AERM
- WCP was also used to verify the effectiveness of the CCCW Chemistry AMP, although no effectiveness verification is recommended in GALL
WCP Usage Summary
- Industry and Plant OE demonstrates that chemistry programs are effective in mitigating aging
- However, Dominion conservatively used WCP to verify the effectiveness of all chemistry control programs (incl.
CCCW)
- Loss of material is the predominant aging effect that is managed by the WCP
- Many Dominion Defined AERM items are also managed by the WCP
WCP -AERM Breakdown
- AERM that credit the WCP include:
- Loss of Material
- Cracking
- Reduction of heat transfer
- Hardening and Loss of strength
- Change in Material Properties
- Loss of strength
- Loss of sealing
- The overwhelming AERM was the loss of material as shown in the following charts
Use of Work Control Process at KPS KPS LRA Summary 4837 5000 4500 4000 3500 3000 2500 1221 2000 (25.2%)
1500 746 475 1000 (15.4%) (9.8%)
500 0
Total LRA Total WCP WCP Verifies WCP Used Line Items Usage Chemistry Excluding Only Chemistry
Use of Work Control Process at KPS Total WCP Usage 1400 1221 1200 1021 (83.6%)
1000 800 600 400 151 (12.4%) 31 200 12 3 2 1 (2.5%) (1.0%) (0.2%) (0.1%)
(0.2%)
0 Total Loss of Cracking Reduction Hardening Loss of Change in Loss of material of heat and loss of sealing material strength transfer strength properties
Use of Work Control Process at KPS WCP Used for Chemistry Verification Only 800 746 700 583 (78.2%)
600 500 400 300 147 200 (19.7%)
100 16 (2.1%) 0 0 0 0 0
Total Loss of Cracking Reduction of Change in Hardening and Loss of Loss of material heat transfer material loss of sealing strength properties strength
Use of Work Control Process at KPS WCP Use Excluding Chemistry Verification 500 475 438 450 (92.2%)
400 350 300 250 200 150 100 15 12 4 3 2 1 50 (2.5%)
(3.2%) (0.8%) (0.6%) (0.4%) (0.2%)
0 Total Loss of Reduction of Hardening Cracking Loss of Change in Loss of material heat transfer and loss of sealing material strength strength properties
WCP - Going Forward
- In response to NRC feedback, WCP was re-evaluated for consistency with GALL AMPs
- WCP will be modified to encompass both:
- Inspection of Internal Surfaces (XI.M38)
- One-Time Inspection (XI.M32)
- Both GALL programs will be fully evaluated in the WCP AMP
- WCP will eliminate the opportunistic approach and perform OTI
- The WCP program will be Consistent with GALL and will no longer be considered as plant-specific
WCP - XI.M32 Overview
- Consistent with GALL, OTI will be performed to verify the effectiveness of existing station chemistry programs:
- Fuel Oil Chemistry
- Lubricating Oil Analysis
- Primary Water Chemistry
- Secondary Water Chemistry
- AERM will include loss of material, cracking, loss of strength and the reduction of heat transfer
WCP - XI.M32 Overview
- Separate sample groups will be established based on:
- Material
- Environment
- Aging Effect(s)
- Component types
- Plant OE
- Each sample group will focus on areas that are most susceptible to aging (e.g.
stagnant locations) as a leading indicator
- Inspections will also be considered for less susceptible locations as a validation
WCP - XI.M32 Overview
- Other specific OTI will be performed as determined through the alignment to XI.M32
- The program will rely on established NDE techniques, including visual, volumetric, and surface examinations that are performed by qualified personnel following procedures consistent with the ASME Code and 10 CFR Part 50, Appendix B
WCP - XI.M32 Overview
- Unacceptable inspection findings will be evaluated in accordance with the site corrective action process to determine the need for subsequent (including periodic) inspections and for monitoring and trending the results
WCP - XI.M38 Overview
- Consistent with XI.M38, the WCP will perform visual inspections of piping, piping components, and other components that are not covered by other KPS AMPs
- Internal inspections will be performed during the periodic system and component surveillances or during the performance of maintenance activities when the surfaces are made accessible for visual inspection through the work management process
WCP - XI.M38 Overview
- WCP will visually inspect for the following:
- Loss of material
- Reduction of heat transfer
- For elastomers, the WCP will manage:
- Change of material properties (elastomers)
- Cracking (elastomers)
- Loss of sealing (elastomers)
Dominion Actions
- Realign WCP to encompass GALL XI.M32 and XI.M38 AMPs
- Define OTI to verify the effectiveness of the chemistry control programs where delineated by the GALL
- Identify additional OTI inspections for unique M/E/A
- Incorporate remaining inspections into WCP-XI.M32
Summary
- WCP will be considered Consistent with GALL and no longer plant-specific
- The supplemental information will amend information in KPS LRA -
Appendix A and B
- Dominion will provide supplemental information related to the WCP no later than September 25, 2009