Kewaunee Power Station Annual Assessment M

ti 1

Meeting Reactor Oversight Program - 2009 Nuclear Regulatory Commission - Region III Kewaunee, Wisconsin April 21, 2010

Purpose of Todays Meeting

  • A public forum for discussion of the licensees performance in 2009
  • NRC will address the performance 2

issues identified in the annual assessment letter

  • Licensee will be given the opportunity to respond and inform the NRC of new or existing programs to maintain or improve performance

Agenda

  • Introduction
  • Review of Reactor Oversight Process
  • National Summary of Plant Performance Di i

f Pl P

f R

l 3

  • Discussion of Plant Performance Results
  • Licensee Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address public questions

Region III Organization Mark Satorius Regional Administrator Cynthia Pederson Deputy Regional Administrator Steven West Director Division of Reactor Projects Anne Boland Director Division of Reactor Safety 4

Gary Shear Deputy Director Kenneth OBrien Deputy Director Michael Kunowski Branch Chief Regional Specialists Kewaunee Power Station Resident Inspectors Robert Krsek Kevin Barclay Project Engineer John Jandovitz

Our Mission

nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.

Some Nuclear Facts 104 nuclear power plants supply about 20 percent of the electricity in the U.S.

Nuclear materials are used in medicine for diagnosis 6

in medicine for diagnosis and cancer treatment.

Nuclear materials are widely used in industry, such as in density gauges, flow measurement devices, radiography devices, and irradiators.

The NRC Regulates

  • Nuclear reactors - commercial power reactors, research and test reactors, new reactor designs
  • Nuclear materials - nuclear reactor fuel, radioactive materials for medical, industrial, and academic use 7
  • Nuclear waste - transportation, storage and disposal of nuclear material and waste, decommissioning of nuclear facilities
  • Nuclear security - physical security of nuclear facilities and materials from sabotage or attacks

What We Dont Do

  • Regulate nuclear weapons, military reactors, or space vehicle reactors 8
  • Own or operate nuclear power plants
  • Regulate some radioactive materials, such as X-rays and naturally occurring radon

How We Regulate

  • Establish rules and regulations
  • Issue licenses
  • Provide oversight through inspection, f

t d

l ti f

9 enforcement, and evaluation of operational experience

  • Conduct research to provide support for regulatory decisions
  • Respond to events and emergencies

Assurance of Plant Safety

  • Require defense-in-depth
  • Require long-term maintenance of equipment 10
  • Require continual training of operators
  • Verify compliance with regulations

What We Do - Nuclear Waste

  • The NRC regulates:

- Storage of spent reactor fuel in fuel pools or dry storage casks and 11 casks, and

- Any national spent fuel storage site, such as the proposed Yucca Mountain site.

What We Do - Nuclear Security

  • NRC Requires:

- Well-armed and well-trained security forces,

- Surveillance and perimeter patrols, 12 perimeter patrols,

- State-of-the-art site access equipment and

controls,

- Physical barriers and detection zones, and

- Intrusion detection systems and alarm stations.

NRC Performance Goals

  • Safety: Ensure adequate protection of public health and safety and the environment.

13

  • Security: Ensure adequate protection in the secure use and management of radioactive materials.

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Performance Indicator Results Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Performance Indicator Results Strategic Performance Areas 14 Significance Threshold Action Matrix Significance Threshold Regulatory Response Significance Threshold Action Matrix Significance Threshold Regulatory Response

Examples of Baseline Inspections

  • Equipment Alignment

~80 hrs/yr

  • Triennial Fire Protection

~250 hrs every 3 yrs

  • Operator Response

~125 hrs/yr E

P d

80 h

/

15

~80 hrs/yr

  • Rad Release Controls

~110 hrs every 2 yrs

  • Worker Radiation Protection

~95 hrs/yr

  • Corrective Action Program

~250 hrs every 2 yrs

  • Corrective Action Case Reviews

~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

Increases NRC oversight Yellow:

Increases NRC oversight Red:

Increases NRC oversight 16 Red:

Increases NRC oversight Inspection Findings Green:

Very low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance 17 Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status as of 12/31/2009 Licensee Response 79 Regulatory Response 24 Degraded Cornerstone 1

18 Degraded Cornerstone 1

Multiple/Repetitive Deg. Cornerstone 0

Unacceptable 0

Total 104

National Summary

  • Performance Indicator Results (total for CY 2009)

- Green 7039

- White 18

- Yellow 0

19

- Yellow 0

- Red 0

  • Total Inspection Findings (total for CY 2009)

- Green 879

- White 7

- Yellow 0

- Red 0

Kewaunee Assessment Results January 1 - December 31, 2009

  • Overall, Kewaunee Power Station operated in a manner that preserved 20 operated in a manner that preserved public health and safety and fully met all cornerstone objectives and plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix.

Kewaunee Inspection Activities January 1 - December 31, 2009

  • The inspections were performed by the Resident Inspectors and Regional Inspectors including specialists in 21 Inspectors, including specialists in engineering, security, emergency preparedness, and radiation protection
  • There were 23 Green Inspection Findings in 2009
  • There was a refueling outage during the 3rd and 4th quarters of 2009.

Kewaunee Inspection Activities January 1 - December 31, 2009

  • A supplemental 95001 inspection on June 29, 2009, reviewed the corrective actions of a White Emergency Preparedness Finding f

f 22 found in the third quarter of 2008.

  • The inspection revealed no additional findings of safety significance and closed the White Emergency Preparedness inspection finding.

Kewaunee Annual Assessment Summary January 1 - December 31, 2009

  • Kewaunee Power Station operated in a manner that preserved public health 23 p

p and safety

  • All cornerstone objectives were met
  • NRC plans baseline inspections at Kewaunee for 2010

Licensee Response and Remarks Mr. Stephen Scace 24 Mr. Stephen Scace Site Vice-President Kewaunee Power Station

Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.

25

  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern 26

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

NRC Representatives Steven West, Director, Division of Reactor Projects

- (630) 829-9600 Gary Shear, Deputy Division Director, DRP

- (630) 829-9601 Peter Tam, Project Manager, NRR

- (301) 415-1451 27

(

)

Robert Krsek, Senior Resident Inspector - Kewaunee

- (920) 388-3156 Kevin Barclay, Resident Inspector - Kewaunee

- (920) 388-3156 John Jandovitz, Senior Project Engineer

- (630) 829-9763 Michael Kunowski, Branch Chief

- (630) 829-9618

NRC Representatives Christine Lipa, Chief, Decommissioning Branch (ISFSI)

- (630) 829-9834 Viktoria Mitlyng, Public Affairs Officer

- (630) 829-9662 Prema Chandrathil, Public Affairs Officer

- (630) 829-9663 28

(

)

Steve Burton, Senior Resident Inspector - Point Beach

- (920) 755-2309 Rob Ruiz, Resident Inspector - Point Beach

- (920) 755-2309 NRC Region III Office Switchboard

- (630) 829-9500 (800) 522-3025

Reference Sources

  • Reactor Oversight Process

- http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/in dex.html 29 Public Electronic Reading Room

- http://www.nrc.gov/reading-rm.html Public Document Room 800-397-4209 (Toll Free)