Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2, EOC-11 (Report 05000272/2010001 and 05000311/2010001)
ML110620264
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/04/2011
From: Arthur Burritt
Reactor Projects Branch 3
To: Joyce T
Public Service Enterprise Group
BURRITT, AL
References
IR-10-001
Download: ML110620264 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATlON, UN tTS 1 AND 2 (0500027 21201 0001 AND 0500031 1 12010001 )

Dear Mr. Joyce:

On February 10, 2011, the Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Salem Nuclear Generating Station (Salem), Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (Pls), in addition to inspection results and enforcement actions from January 1, 2010, through December 31, 2010. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not inciude security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Salem Units 1 and 2, operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that performance at Salem Units 1 and 2, during the most recent quarter, was within the Licensee ilesponse Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all Pls indicated that your performance wai within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2012. Routine inspections perfoimed by resident inspectors are not included in the inspection plan. The inspections iisted during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. ln accordance with 1O CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records'(PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://wrrvw.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

please contact me at 610-337-5069 with any questions you have regarding this letter.

Arthur L. Burritt, Chief Division of Reactor Projects Projects Branch 3 Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc dencl: Distribution via ListServ salem Nuclear Generating Station Inspection/ Activity Plan ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room).

Please contact me at 610-337-5069 with any questions you have regarding this letter.

Sincerely,

/RA/

Arthur L. Burritt, Chief Division of Reactor Projects\

Projects Branch 3 Docket Nos. 50-272, 50-311 License Nos. DPR-70, DPR-75 cc Mencl: Distribution via ListServ Salem l,[uclear Generating Station Inspection/ Activity Plan Distribution w/encl: J. Trapp, Rl, OEDO W. Dean. RA DRS Branch Chiefs (6)

D. Lew, DRA N. McNamara, Rl, SLO D. Roberts, DRP D. Tifft, Rr, slo J. Clifford, DRP D. Screnci, Rl, PAO P. Wilson, DRS N. Sheehan, Rl, PAO A. Burritt. DRP R. Barkley, Rl, ORA L. Cline, DRP ROPassessment Resource A. Turilin, DRP RidsNrrPMSalem Resource C. Douglas, DRP RidsDodLpll -2 Resource D. Schroeder, DRP, SRI RidsNrrDirslpab P. McKenna, DRP, Rl ROPreportsResource K. McKenzie, DRP, OA SUNSI REVIEW COMPLETE: LC (Reviewer's initials) ML110620264 DOC NAME: S:\ROP-11 EOC REVIE\ ABRANCH 3\LETTERS\SALEM - ANNUAL ASSESSMENT LETTER REVO.DOCX After declaring this document "An Otficial Agency Record" it will be released to the Public.

To receive a copy ol this document, indicate in the box: "C'= Copy w/ attachmenUenclosure 'E' = Copy dattadment/enclosure "N"= No coPY

)FFICE mml RI/DRP RI/DRP

{AME -Cline/ LC ABurritU ALB

)ATE )2t28 t11 03to1 111 OFFICIAL RECORD COPY

Page 1 of2 Salem 0310112011 14:19:41 Inspection / Activity Plan Report 22 0110112011 - 0613012012 No. of Staff Title on Site 71124 - HP TNSPECTTON 1,2 O1lO3l2O11 0110712011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 1,2 O1lO3l2O11 O1l07l2o1'l lP 71124.02 Occupational ALARA Planning and Controls I,Z O1lO3l2O11 0110712011 lP 71124.04 Occupational Dose Assessment 7111121 - CDBI 1,2 01t24t2011 0112812011 lP 7111121 Component Design Bases lnspection 1,2 0210712011 o211112011 tP 7111121 Component Design Bases Inspection 1,2 0211412011 o2t1Bt201'l tP 7111121 Component Design Bases Inspection EP PROGR - EP PROGRAM INSPECTION I, Z 03t1412011 03t18t2011 lP 7111402 Alert and Notification System Testing I,Z 03t14t2011 03t18t2011 lP 7111403 Emergency Preparedness Organization Staffing and Augmentation System I,Z 03t14t2011 03t18t2011 tP 7111404 Emergency Action Level and Emergency Plan Changes 1,2 0311412011 03t18t2011 tP 7',t11405 Corection of Emergency Preparedness Weaknesses and Deficiencies I,Z o311412011 0311812011 tP 71 151-EP01 Drill/Exercise Performance 1,2 0311412011 03t18t2011 tP 71151-EPO2 ERO Drill Participation t.z o311412011 o3t18t2011 tP 71151-EP03 Alert & Notification System O912EXM . OPERATOR LICENSING INITIAL EXAMS I o&t15t2011 08t19t2011 UO183O FY11- SALEM, INITIAL OL EXAM 1 ogt19t2011 0912312011 UOl83O FY11- SALEM, INITIAL OL EXAM 71124 - HP 2 o4t18t2011 04t22t2011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 2 o4t18t2011 04t22t2011 lP 71124.02 Occupational ALARA Planning and Controls 2 o4t18t2011 0412212011 lP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 7111'IO8P .U2INSERVICEINSPECTION 2 o4t18t2011 0412912011 lP 7111108P Inservice Inspection Activities - PWR 71152 - Pt&R I,Z 0612712011 07t01t2011 lP 711528 ldentification and Resolution of Problems 1,2 07t11t2011 07t15t2011 lP 711528 ldentification and Resolution of Problems 7111118 . SALEM REQUAL INSPw/P/F RESULTS t,z o8t22t2011 0812612011 lP 71111118 Licensed Operator Requalification Program 71124 - REMP 1,2 07125t2011 0712912011 lP 71124.07 Radiological Environmental Monitoring Program 71124 - HP 1,2 1013112011 1110412011 lp 2S1Sl17g Verification of Licensee Responses to NRC Requirement for lnventories of Materials Tracked in NSTS 1,2 10t31t2011 1110412011 lP 608S5.i Operation of an Independent Spent Fuel Storage Installation at Operating Plants FhGleport does noffirclude INPO and OUTAGE activities. l.

I Tnis report shows only on-site and announced inspection procedures. E

+----1-:::=Tr-a'mFffi =.=:='-:F.41-

Page2ot 2 Salem 0310112011 14:19:41 lnspection / Activity Plan Report 22 o1loll2011 - 0613012012 Unit No. of Staff Number on Site 71124 - HP I

1013112011 1110412011 lP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 10t31t2011 11t04t2011 lP 71124.02 Occupational ALARA Planning and Controls 1 10t31t2011 11t04t2011 lP 71124.05 Radiation Monitoring Instrumentation 7111108P . U1 INSERVICE INSPECTION 11t07t2011 111'1812011 lP 71 108P 1 1 Inservice Inspection Activities - PWR 71124 .RADWASTE I,Z 1210512011 12t09t2011 lP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation TRI FI - TRIENNIAL FIRE PROTECTION INSPECTION 1,2 01t23t2012 01t27t2012 tP 71 1110ST Fire Protection firiennial]

1,2 02t06t2012 02t10t2012 lP 71 1110ST Fire Protection friennial]

71124.06 - PUB RAD SAFEW. RETS 1,2 01/3012012 02to3t2012 lP 71124.05 Radiation Monitoring Instrumentation 1,2 01t30t2012 02t03t2012 lP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 71124 -OCCRDASAFEW 1,2 03t12t2012 03t16t2012 lP 71124.01 Radiological Hazard Assessment and Exposure Controls I,Z 03t12t2012 03t16t2012 lP 71124.02 Occupational ALARA Planning and Controls 1,2 03t12t2012 03t1612012 lP 71124.05 Radiation Monitoring Instrumentation EP EX - EP EXERCISE EVALUATION 1,2 05t21t2012 05t2st2012 lP 7111401 Exercise Evaluation I,Z 05t21t2012 05t25t2012 lP 7111404 Emergency Action Level and Emergency Plan Changes 71124 -OCCRADSAFEW 1.2 06t11t2012 06t15t2012 lP 71124.02 Occupational ALARA Planning and Controls 1,2 06t11t2012 06t15t2012 tP 71124.03 In-Plant Airbome Radioactivity Control and Mitigation 1,2 06t11t2012 0611512012 lP 71124.04 Occupational Dose Assessment 1.2 06t11t2012 0611512012 lP 71124.05 Radiation Monitoring nstrumentation I

1r nrs report does not include INPO and OUTAGE activities.