ML120650424

From kanterella
Revision as of 07:14, 12 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
End of Cycle Assessment Report 22
ML120650424
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 03/05/2012
From:
NRC/RGN-II
To:
Carolina Power & Light Co
Shared Package
ML120650415 List:
References
Download: ML120650424 (1)


Text

Page 1 of 1 Robinson 03/05/2012 08:23:38 Inspection / Activity Plan Report 22 03/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 2 05/07/2012 05/11/2012 IP 71152B Problem Identification and Resolution 2 05/21/2012 05/25/2012 IP 71152B Problem Identification and Resolution PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 2 2 05/21/2012 05/25/2012 IP 7111402 Alert and Notification System Testing 2 05/21/2012 05/25/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 2 05/21/2012 05/25/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 2 05/21/2012 05/25/2012 IP 71151 Performance Indicator Verification EB3 HS - TRIENNIAL HEAT SINK INSPECTION 1 2 06/18/2012 06/22/2012 IP 7111107T Heat Sink Performance TI-182 - TI-182 BURIED PIPING/TANK - PHASE 1 1 2 07/16/2012 07/20/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping MODS - MODIFICATIONS INSPECTION 4 2 07/23/2012 07/27/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 2 08/06/2012 08/10/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications ROB TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 4 2 09/11/2012 09/13/2012 IP 7111105T Fire Protection [Triennial]

2 10/01/2012 10/15/2012 IP 7111105T Fire Protection [Triennial]

2 10/15/2012 10/19/2012 IP 7111105T Fire Protection [Triennial]

TI-177 - TI-177 3 2 11/26/2012 11/30/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System OL EXAM - INITIAL EXAM PREP 3 2 02/11/2013 02/15/2013 V23392 ROBINSON/FEBRUARY 2013 INITIAL EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM WEEK 3 2 03/11/2013 03/15/2013 V23392 ROBINSON/FEBRUARY 2013 INITIAL EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 5 2 04/08/2013 04/12/2013 IP 7111121 Component Design Bases Inspection 2 04/22/2013 04/26/2013 IP 7111121 Component Design Bases Inspection 2 05/06/2013 05/10/2013 IP 7111121 Component Design Bases Inspection PSB1-RP - RP PUBLIC RAD SAFETY BASELINE 5 2 05/20/2013 05/24/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 2 05/20/2013 05/24/2013 IP 71124.07 Radiological Environmental Monitoring Program 2 05/20/2013 05/24/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure