Similar Documents at Ginna |
---|
Category:Enforcement Action
MONTHYEARML20107F8342020-04-16016 April 2020 (EA-19-122) Response to Contested Notice of Violation Documented in U.S. Nuclear Regulatory Commission R.E. Ginna Inspection Report 05000244/2019010 IR 05000244/20150072015-02-24024 February 2015 Notice of Violation - Severity Level III Problem - NRC Inspection Report 05000244/2015007 IR 05000244/20120092012-11-0505 November 2012 IR 05000244-12-009; 09/10/2012 - 09/28/2012; R.E. Ginna Nuclear Power Plant; Triennial Fire Protection Inspection IR 05000244/20090062009-12-28028 December 2009 IR 05000244-09-006; on 11/02/2009 - 11/20/209; R.E. Ginna Nuclear Power Plant; Triennial Fire Protection Team Inspection IR 05000244/20090082009-11-12012 November 2009 EA-09-249, R. E. Ginna Nuclear Power Plant, LLC, Notice of Violation - NRC Inspection Report No. 05000244-09-008 ML0931602002009-11-12012 November 2009 EA-09-249, R. E. Ginna Nuclear Power Plant, LLC, Notice of Violation - NRC Inspection Report No. 05000244-09-008 IR 05000244/20085022008-04-0707 April 2008 R. E. Ginna Nuclear Power Plant - Notice of Violation, NRC Supplemental Inspection Report No. 05000244/2008502 ML0233002832002-11-26026 November 2002 EA-02-121, EA-02-142, Peach Bottom, NOV & Green and White Findings 2020-04-16
[Table view] Category:Inspection Report
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) IR 05000244/20220042023-01-31031 January 2023 LLC - Integrated Inspection Report 05000244/2022004 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 IR 05000244/20224202022-11-22022 November 2022 Security Baseline Inspection Report 05000244-2022420 Cover Letter IR 05000244/20220032022-11-0303 November 2022 LLC - Integrated Inspection Report 05000244/2022003 IR 05000244/20225012022-09-21021 September 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000244/2022501 IR 05000244/20220102022-09-13013 September 2022 Biennial Problem Identification and Resolution Inspection Report 05000244/2022010 IR 05000244/20220052022-08-31031 August 2022 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) IR 05000244/20224022022-08-0303 August 2022 Security Baseline Inspection Report 05000244/2022402 IR 05000244/20220022022-08-0303 August 2022 LLC - Integrated Inspection Report 05000244/2022002 ML22160A3962022-06-0909 June 2022 R. E. Ginna Nuclear Power Plant, LLC - Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2022010 IR 05000244/20224032022-05-24024 May 2022 R. E. Ginna Nuclear Power Plant, LLC - Cyber Security Inspection Report 05000244/2022403 (Cover Letter Only) IR 05000244/20220012022-05-0303 May 2022 R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2022001 IR 05000244/20224012022-03-0404 March 2022 LLC - Security Baseline Inspection Report 05000244/2022401 IR 05000244/20210062022-03-0202 March 2022 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006) IR 05000244/20210042022-01-20020 January 2022 R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2021004 IR 05000244/20220112021-12-16016 December 2021 R. E. Ginna Nuclear Power Plant, LLC - Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000244/2022011 IR 05000244/20210032021-11-0404 November 2021 Integrated Inspection Report 05000244/2021003 IR 05000244/20215012021-09-29029 September 2021 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2021501 IR 05000244/20210052021-09-0101 September 2021 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005 IR 05000244/20210022021-08-0303 August 2021 LLC: Integrated Inspection Report 05000244/2021002 IR 05000244/20214012021-07-0202 July 2021 R. E. Ginna Nuclear Power Plant: Security Baseline Inspection Report 05000244/2021401 IR 05000244/20210102021-06-0707 June 2021 LLC: NRC Inspection Report 05000244/2021010 IR 05000244/20210012021-05-0505 May 2021 LLC: Integrated Inspection Report 05000244/2021001 IR 05000244/20210112021-04-27027 April 2021 LLC: Temporary Instruction 2515/194 Inspection Report 05000244/2021011 IR 05000244/20200032021-04-15015 April 2021 R. E. Ginna Nuclear Power Plant, LLC: Reissued Integrated Inspection Report 05000244/2020003 IR 05000244/20200062021-03-0303 March 2021 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020006) IR 05000244/20200132021-02-17017 February 2021 R. E. Ginna Nuclear Power Plant, LLC: Design Basis Assurance Inspection (Programs) Inspection Report 05000244/2020013 IR 05000244/20200042021-02-0808 February 2021 R. E. Ginna Nuclear Power Plant, LLC: Integrated Inspection Report 05000244/2020004 IR 07200067/20200022021-01-21021 January 2021 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200067/2020002 IR 05000244/20203012020-12-0101 December 2020 R. E. Ginna Nuclear Power Plant, Initial Operator Licensing Examination Report 05000244/2020301 ML20315A3682020-11-10010 November 2020 R. E. Ginna Nuclear Power Plant, LLC - Integrated Inspection Report 05000244/2020003 2024-09-24
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] Category:Notice of Violation
MONTHYEARML19261A0832019-09-18018 September 2019 R. E. Ginna Nuclear Power Plant: Design Bases Assurance Inspection (Teams) Report 05000244/2019010 and Notice of Violation ML16262A2132016-09-20020 September 2016 LLC - Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000244/2016009 IR 05000244/20160092016-09-20020 September 2016 LLC - Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000244/2016009 IR 05000244/20150072015-02-24024 February 2015 Notice of Violation - Severity Level III Problem - NRC Inspection Report 05000244/2015007 IR 05000317/20120082012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO ML12213A1822012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group Memo IR 05000220/20120082012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO IR 05000244/20120072012-11-0101 November 2012 Notice of Violation - Constellation Energy Nuclear Group MEMO IR 05000244/20090082009-11-12012 November 2009 EA-09-249, R. E. Ginna Nuclear Power Plant, LLC, Notice of Violation - NRC Inspection Report No. 05000244-09-008 ML0931602002009-11-12012 November 2009 EA-09-249, R. E. Ginna Nuclear Power Plant, LLC, Notice of Violation - NRC Inspection Report No. 05000244-09-008 IR 05000244/20090022009-06-0808 June 2009 IR 05000244-09-002, for R. E. Ginna - Final Significance Determination of White Finding with Assessment Follow-up, and Notice of Violation IR 05000244/20085022008-04-0707 April 2008 R. E. Ginna Nuclear Power Plant - Notice of Violation, NRC Supplemental Inspection Report No. 05000244/2008502 ML0409004872004-03-30030 March 2004 IA-04-005, B. Flynn, Notice of Violation, OI Report 1-2003-021 ML0409003572004-03-30030 March 2004 EA-04-003, Ginna, Notice of Violation, OI Investigations Report 1-2003-021 ML0233002832002-11-26026 November 2002 EA-02-121, EA-02-142, Peach Bottom, NOV & Green and White Findings ML0229504172002-10-22022 October 2002 IA-02-041, Diprospero, Notice of Violation ML0227700652002-10-0404 October 2002 Final Significance Determination for White Finding EA-02-141 & Notice of Violation 2019-09-18
[Table view] |
Inspection Report - Ginna - 2015007 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION ary 24, 2015
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - NOTICE OF VIOLATION -
SEVERITY LEVEL III PROBLEM - NRC INSPECTION REPORT 05000244/2015007
Dear Mr. Pacher:
This letter provides you the NRC enforcement decision for the apparent violations documented in Inspection Report 05000244/2014005, issued to R.E Ginna Nuclear Power Plant, LLC (Ginna) on February 4, 2015 (ML15035A166)1. The apparent violations, associated with licensed reactor operator medical examinations and related NRC reporting requirements, were discussed with Ginna representatives at an inspection exit meeting on January 14, 2015, and documented in the subject inspection report.
The February 4, 2015, NRC letter transmitting the inspection report notified you that the apparent violations were being considered for escalated enforcement in accordance with the NRC Enforcement Policy, and provided you the opportunity to address the apparent violations by attending a pre-decisional enforcement conference (PEC), or by providing a written response before we made our final enforcement decision. In the letter we also informed you that we had sufficient information regarding the apparent violations and Ginnas corrective actions to make an enforcement decision without the need for a PEC or a written response. In a telephone call on February 9, 2015, Tom Harding, Manager, Site Regulatory Assurance informed Dan Schroeder, Branch Chief that Ginna did not require a PEC nor intend to send a written response.
Therefore, based on the information developed during the inspection, the NRC has determined that violations of NRC requirements occurred. These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding them are described in detail in the subject inspection report, and in the NRCs February 4, 2015, letter.
Designation in parentheses refers to an Agency-wide Documents Access and Management System (ADAMS) accession number. Documents referenced in this letter are publicly-available using the accession number in ADAMS. The first violation involved Ginnas submittal of information to the NRC in an October 8, 2008, NRC licensed senior operator application that was not complete and accurate in all material respects. Specifically, the application did not specify that the applicant had a medical condition that required a restriction to take medication for hypertension. Based, in part, on this inaccurate information, the NRC issued an initial license that did not contain the necessary restriction.
The second violation involved Ginnas failure to notify the NRC within 30 days of a permanent disability of a licensed senior operator. Specifically, Ginnas staff was informed in July 2008 that the operator was taking medication for hypertension. Ginna did not report this condition to the NRC when they submitted NRC Form 396 as part of the licensed senior operator application in October 2008, and during subsequent biennial requalification medical examinations in 2010 and 2012. Ginna also did not request an amended license with a condition to account for the medical issue until July 2014.
The NRC has concluded that both violations occurred as a result of the contract medical personnels failing to follow Ginnas prescribed processes. Accordingly, these violations have been categorized collectively as a Severity Level (SL) III problem to emphasize the importance of providing suitable training, oversight, and focus on licensed operator medical requirements.
In accordance with the NRC Enforcement Policy, a base civil penalty in the amount of $70,000 is considered for a SL III problem involving a power reactor licensee. Because your facility has not been the subject of escalated traditional enforcement actions within the last 2 years, the NRC considered whether credit was warranted for Corrective Action in accordance with the civil penalty assessment process in Section 2.3.4 of the Enforcement Policy. The NRC has concluded that credit is warranted for Ginnas corrective actions. Specifically, the inspectors confirmed during the inspection that Ginna: (1) requested the NRC amend the operators license to include a restriction for the use of prescribed medication for hypertension (on August 28, 2014, the NRC issued the amended license with the new restriction); (2) initiated a Root Cause Evaluation that included an extent of condition review of all operators to determine if there are any further unknown medical conditions; (3) trained licensee medical personnel on NRC medical restriction requirements; and (4) implemented a process to audit medical records annually.
Therefore, to encourage prompt and comprehensive correction of violations, and in recognition of the absence of previous escalated traditional enforcement action, I have been authorized, after consultation with the Director, Office of Enforcement, not to propose a civil penalty in this case. However, significant violations in the future could result in a civil penalty.
The NRC has concluded that information regarding: (1) the reasons for the violations; (2) the actions planned or already taken to correct the violations and prevent recurrence; and (3) the date when full compliance was achieved, is already adequately addressed on the docket in either Inspection Report 05000244/2014005 or in this letter. Therefore, you are not required to respond to this letter unless the description therein does not accurately reflect your corrective actions or your position. In that case, or if you choose to provide additional information, you should follow the instructions specified in the enclosed Notice.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room and in the NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. If personal privacy or proprietary information is necessary to provide an acceptable response, please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information.
If you request withholding of such information, you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g., explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.390(b) to support a request for withholding confidential commercial or financial information).
The NRC also includes significant enforcement actions on its Web site at (http://www.nrc.gov/reading-rm/doc-collections/enforcement/actions/).
Sincerely,
/RA/
Daniel H. Dorman Regional Administrator Docket No. 50-244 License No. DPR-18 Enclosure: Notice of Violation cc w/enclosure: Distribution via ListServ