Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
i REGULATORY FORMATION DISTRIBUTION SY tl (RIDS)
'AOCESSION NBR:8205280200 DOC ~ DATE! 82/05/24 NOTARIZED! NO DOCKET FACIL:50-389 St,,Lucie Planti Uniit 2< Florida Power 5 Light Cos 05000389 "AUTH ~ NAt>iE AUTHOR AFFILIATION UHRIGI R ~ E ~ Florida Power 8 'Light Co.
JR BC IP ~ N AMF- RECIPIENT AFFILIATION EI'SENHUTiD.G, Division of Licensing
SUBJECT:
Forwards summary of NRC "Seismic Qualification Review Team 8 Pump Valve Operabijity Review Team .820511'4, auditsi including .agendarfindings 8 .equipment status. Outstanding info will be provided by 820615.
DISTRIBUTION CODE: B001S COPIES RECEIVED:LTR .J[ ENCL',$ SIZE:
TITLE: PSAR/FSAR AMDTS and"Related Correspondence NOTES:
RECIPIENT .COPIES RECIPIENT COPIES ID CODE/NAP'E LTTR ENCL ID 'CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR ¹3 BC 1 0 LIC BR ¹3 LA 1 0 NERSESgV ~ 01 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 MPA 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 '3 NRR/DE/GB 28 2 2 NRR/DE/HGEB -30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MITEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 NRR/DSI/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/IiCSB 16 1 NRR/DSI/PSB 19 1 1 NRR/DS I/RAB 22 1 1 NRR D /RSB 23 1 1 NRR/DST/LGB 33 1 1 G 04 1 1 RGN2 2 2 EXTERh'AL: ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 FEMA REP 0 IY 39 1 1 LPDR 03 1, 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 iTOTAL NUMBER OF COPIES REQUIRED: LTTR 57 ENCL "52
]l II 4 if h
L .O. BOX 529100 MIAMI,F L 33'I 52 yAIJ//g FLORIDA POWER & LIGHT COMPANY Hay 24, 1982 L-82-219 Office of Nuclear Reactor Regulations Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U..S. Nuclear Regulatory Commission Wahhington, D.C. 20555
Dear Mr. Eisenhut:
Re: St. Lucie Unit No. 2 Docket No. 50-389 Minutes of S RT and PVORT Audit From May ll to Review Qualification 14, 1982 the NRC Equipment Qualification Branch, Seismic Team (SQRT) and Pump .and Valve Operability Review Team (PVORT) visited the St. Lucie Unit No. 2 Site in order to conduct an audit of the Florida Power and Light program in these areas. Attachment 1 presents the agenda for the 4 day meeting including the equipment which was audited. The audit was conducted by 3 SQRT teams and. 2 PVORT teams.
Attachment 2 presents the NRC comments regarding each piece of equipment audited and its status. Regarding the open items, FPL comm'its to submit outstanding information on all issues by June 15, 1982 or as marked in attachment 2.
Please contact us with your comments at your convenience.
Very truly yours, Robert . Uhrig Vice President Advances Systems and Technolgy REU/RAK/lej Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire 8@05380 ~ 4-PEOPLE... SERVING PEOPLE
FLORIDA PWER & LIGHT COMPAPI ST. LUCIE PROJECT UNIT NO. 2 S RT & PVORT SITE AUDIT
.:ATTACHMENT 1 AGENDA 5 11/82 5/14/82)
S RT 5/11/82 5/12/82 5/13/82 Team A" 1. MSIV I-HCV-08-1B 4. CK Valve I-V-7172 7. 4.16 Kv Switchgear 2A-3
- 2. Valve I-Mv-08-14 (RAB Pen. EL. 9') 8. 45 Kva Transformer PP-201
- 3. AFM Pump (Motor) 5. ICt< Pump (RAB EL. 43')
(Trestle) 6. Rotameter FIS-21-3A-1 (Intake Structure)
Team "B" 1. Valve FCV-3301 4. HPSI Pump/Motor 7. TE-14-3A
- 2. Valve V-3517 5. LPSI Pump/Motor (CGJ Bldg.)
- 3. Valve V-3495 (ECCS) 8. Hot Shutdown and Control (RAB-0.5') 6. Valve LCV-2110P Transfer panels (RAB EL. 19.5" (RAB EL. 43')
- 9. Battery. Racks Team "C" 1. Gravity Damper GD-7 4. Recorder 7. Contact Output Isolator
- 2. Limit Switch ZS-25-24 5. Signal Characterizer 8. Multi-Nest Power Supply (RAB EL. 62') 6. RPS Cabinet 9. Distribution Module
- 3. Transmitter PT-1107 (Control Room) (Control Room)
P PORT Team "X" 1. Valve I-MV-08-12 3. MSiV I-HCV-08 1B 5. Valve I-V-7172 (Trestle) 4. AH< Pump (Motor) (RAB Pen EL. 9')
- 2. ICW Pump (Trestle) 6. Valve I-FCV-07-1A (Intake Structure) (RAB Pen EL. 28')
-Team "Y" 1. Valve FCV-3301 3. HPSI Pump/Motor 5. Valve HCV-3648
- 2. Valve V-2650 (ECCS Room) (RCB EL. 45')
(RAB 0.5') 4. Valve V-3517 (RAB 0.5')
5/14/82 Exit Meeting
5/14/82 SORT AND PVORT AUDIT FINDINGS AND STATUS ATTACHMENT 2 ITEM DESCRIPTION OF COMMENTS STATUS
~SRT 5/11/82 TEAM A
- 1) MSIV-I- Neither. airline or bypass line has supports. This item closed b~PL HCV-08-1B letter indicating supports will be
~n in- .
stalled. FPL to supply verification of support installation. Admin.
follow-up item. Airlin~
restraint design by 6/1/82; installation by 7/15/82. Bypass line restraint design by 7/23/82; installation by 8/31/82.
- 2) Valve I-MV-08-14 Piping where ADV Valve is mounted is missing supports. NRC FPL to verify inst notified prior to audit. at>.on of support.
Adminstrative followup item.
- 3) Pump AFh'ump No Comments .Closed (Motor)
(Trestle)
SORT AND PVORT AUDIT 2 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS
~SRT 5/11/82 TEAM B
- 1) Valve FCV-3301 1. FPL to supply bending stress information. Bending Closed stress is near allowable. Concern is about conservatism of analysis'.
- 2. FPL to supply pin stresses. 2. Open
- 2) Valve V-3517 1. Provide additional SQRT form data 1. Closed
- 2. Provide FEAAS6 computer code verification 2. 'Follow up
- 3) Valve V-3495 Conduit spacing is of concern,. (Within 5 inches of wall Closed concern is defferential movement between wall and valve) FCR supplied to NRC
3 SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS S RT 5/11/82 TEAM C
- 1) Gravity Damper GD-7 Model No. specified in Spec. is incorrect Revised Spec. with correct model No.
supplied to NRC 5/13/82.
Item Closed
- 2) Limit Switch 1. Model No. in report not in exact agreement with installed 1.FPL provided TMX 2S-25-24 model/drawing. clarifying that report covers
- 2. Single frequency input concern model installed.
Item closed
- 3. Test mounting details not in report 2.Closed-3.Closed
- 3) Transmitt PT-1107 1. Spacing between tubing and transmitter of concern. 1. Technical follow-up. Acceptability
- 2. Concern that there does not appear to be a correlation to be verified by between test data and specification 6/4/82.
2.Closed
SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/11/82 TEAN X
- 1. Valve I-NV-08-1 Concern on full stroking of valve to demonstrate operability Closed by Start-Up with full delta P Discussion of Test Procedure
- 2. Pump ICM No Comments Closed Note: SQRT Team is reviewing deflection.
calculations. Operability review may depend .
on results of that review.
SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/11/82 TEAM Y
- 1) Valve FCV-3301 1. Concern about maintenance program for this valve 1. Closed by GEHs description
- 2. Account for flow inducedvibration over life of valve 2. Open 3 . Hydro test &'eakage data not available 3. Open
- 2) Valve V-2650 l. Hydro test & leakage data not available l. Open
- 2. Need explanation of Preop testing to be performed on 2. Confirm that valve this valve (closing against full delta P needed) is part of periodic safeguards tes
- 3. Provide verbal confirmation of fu11 flow test on 5/13/82
- 3. Closed
SORT AND PVORT AUDIT FINDINGS AND'TATUS ITEM DESCRIPTION OF COMMENTS STATUS S RT 5/12/82 TEAM A
- 1. Valve I-V-7172 Nearby horizontal pipe supports missing. Verify when completed. Closed, pipe suppO s Check installed.
- 2. Pump ICW Qual. Report problems. NRC disagrees with methodology Open. FPL provided letter in report. Relative displacement between impeller and casing from Byron Jackson explain in question. ing method of ca1culation and effect of casing/impel ler interference. FPL to provide clarification on "casing/impeller int ference".
- 3. Rotameter FIS 3A-1 No Comments Closed
SORT AND PVORT AUDIT FINDINGS AND STATUS'TEM DESCRIPTION OF COMMENTS STATUS
~SRT Note: HPSX comments deferred to 5/13/82.
5/12/82 TEAM B
- 1. Pump LPSI Pump/Moto 1. Additional information needed for Motor Qualification 1. Open Report sections G, H, I, J
- 2. Provide computer code verification for ASME code equation for flanges 2. Follow up and also ME 9032.
- 2. Valve LCV-2110P Provide computer code verification for Wang computer code 2200 A/B Follow up
SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF CONNENTS STATUS S RT 5/12/82 TEAN C
- 1. Recorder
~
Need the required response spectrum for the location on the main control board on which recorder is installed, to compare with test response Information will available in June~
~
spectrum. '82 when it will be .
submitted to NRC.
Item is Open.
- 2. Signal No problem with this piece of equipment, however, Foxboro Provide confirmation Charact- cabinet in which characterizer is installed does not have of I.D. tag installation.
erizer I.D. tag.
- 3. RPS Cabinet 1. No I.D. Plate on cabinet 1. Closed
- 2. Operability proof for cabinet is not in the report. 2. Open
- 3. The cabinet in the field is the .actual one tested. Provide details 3. Open on cabinet and devises reconditioning.
SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/12/82 TEAM X
- 1. Valve 1. The NRC will consid~~
MSIV-I- informatx.on provide~
HCV-08-1B This valve is not tested under a concern.
full flow conditions. This is during the audit.
- 2. FP&L should continue pursuing additional type testing or model testing which may he available.
2; Pump AFW Tag on water supply to pump seal says to fillwith oil. This has been corrected 5/13/82 Closed
SORT AND PVORT AUDIT 10 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/12/82 TEAM Y 1, Pump HPSI 1. Incorrect Model No. on PVORT form . Correct No. is 5K 8110 52C57. Verify other records are correct. Correct 1. Closed PVORT form.
- 2. Coupling cover not secured to floor. 2. Coupling being adjusted. Will secured once
'e work is complete.
Verify by letter.
- 2. Valve V-3517 Valve tag unsecured Closed Tag secured
SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS SQRT 5/13/82 TEAM A
- 1. Switchgea 1'. Justify that welded mounting is at least as strong as tested bolted Technical follow-up.~
4.16 KV-2A3 mounting.
be made.
As an action item, an additional fourth plug weld should By June 1, 1982 FPL provide justification ll and corrective action if
- 2. Loose transformer in switchgear cabinet should be reattached and a necessary.
sampling made to establish that other transformers are not loose. 2. Follow-Up. FPL will procedure for 'rovide QC review oftransformer mounting and results of inspection.
- 2. Transform r 1. Mounting in field is different from test; however, field mount is 1. Closed 45 KVA stronger PP-201
- 2. No model number on this piece of equipment, serial number only. 2. Confirmatory Clarify.
~ '
SORT AND PVORT AUDIT 12 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS S RT 5/13/82 TEAM B 1.. ,1. Provide SANDE computer code verification. 1. open Pump 2. Verify rigidity of pump internals. 2. Open HPSI 3. Verify, for internals, that startup load is more severe than seismic. 3. Open (From 5/12/8 4. Provide location of driver/pump foot taper pins. 4. Open
- 5. Provide criteria for load distribution to determine foundation bolt 5. - Open stresses.
- 2. TE-14-3A 1. Test by sine sweep. No natural frequencies were established. This 1. Closed (CCW Bldg information should be provided for confirmation.
- 2. Support of rigid conduit is too flexible. Justify design of the 2. Technical follow-up.
support. FPL provided to NRC commitment to review support design and provide verificati~by June l, l982 and r~rk by August 2, 1982.
- 3. Hot Shut- 1. Verify that original purchase specification had spectra included. 1. Closed dowQ Control
/ 2. Spare cable loose in cabinets. 2. Construction memo issued Transfer to tie down loose cables Panels Closed.
- 3. For OBE test, RRS's are not included in report. 3. Closed. TRS envelopes RRS.
SORT AND PVORT AUDIT 12A FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS
~SRT 5/13/82 TEAM B - CONT.
- 4. Battery 1. Test report states that Battery LC21 has a molded rib design which 1. Confirmatory Rack ~
created cracks during the battery test. Check that SL-2 uses an improved design of LC-2l,with floating ribs.
- 2. One thermally aged battery cracked during rack test. Check that the 2. Confirmatory battery model LC21 which cracked is not used for SL-2.
3.. Compare natural frequency of single and double bay rack tests. 3. For Info.
- 4. Provide qual. report for new batteries and racks. 4. Technical follow up
SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS
~SRT 5/13/82 TEAM C
- 1. Contact No Comments. Closed Output Isolator 2: Multy Nes No Comments. Closed Power Supply
- 3. Distri- No Comments. Closed bution Module (control room)
0 SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/13/82 TEAM X
- 1. Valve Provide confirmation that valve has been manually cycled. Confirmatory I-V-7172
- 2. Valve No Comments. Closed I-FCV-07-1A
SORT AND PVORT AUDIT 15 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/13/82 TEAM Y
- 1. Valve HCV-3648 1. Serial No. on PVORT form incorrect, correct where 1. Closed necessary.
- 2. Junction box is contacting pipe support but is not 2. No FPL action.
supported on pipe support. This should be looked at for possible problems be as electrical supply is not required for the safety function this is not an open item for the Audit.
- 3. Describe maintenance Provide procedures on certification that this valve is air supply filter. 3. Confirmatory GEMS.
Describe test or analysis to demonstrate valve closure Closed under full delta P (Pre-op, Start-Up procedure) utilizes stiff conduit supply electrical
- 5. Valve operator cable to operator. How is it consideredto in analysis?
- 5. Closed
0 SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS GENERIC CONCERNS 1. Verify that input G levels specified for purchasing of valves and 1. Confirmatory line-mounted instruments are larger than the actual computed G values from piping stress analysis.
- 2. Provide follow-up status of seismic qualification program 2. Follow"up
- a. schedule of remaining equipment
- b. monthly report on seismic equipment qualification.
- 3. Provide verification that unqualified limit switches will not 3. Open hamper operation of safety related valves.