ML17212B629

From kanterella
Jump to navigation Jump to search
Forwards Summary of NRC Seismic Qualification Review Team & Pump Valve Operability Review Team 820511-14 Audits, Including Agenda,Findings & Equipment Status.Outstanding Info Will Be Provided by 820615
ML17212B629
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/24/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-82-219, NUDOCS 8205280200
Download: ML17212B629 (25)


Text

i REGULATORY FORMATION DISTRIBUTION SY tl (RIDS)

'AOCESSION NBR:8205280200 DOC ~ DATE! 82/05/24 NOTARIZED! NO DOCKET FACIL:50-389 St,,Lucie Planti Uniit 2< Florida Power 5 Light Cos 05000389 "AUTH ~ NAt>iE AUTHOR AFFILIATION UHRIGI R ~ E ~ Florida Power 8 'Light Co.

JR BC IP ~ N AMF- RECIPIENT AFFILIATION EI'SENHUTiD.G, Division of Licensing

SUBJECT:

Forwards summary of NRC "Seismic Qualification Review Team 8 Pump Valve Operabijity Review Team .820511'4, auditsi including .agendarfindings 8 .equipment status. Outstanding info will be provided by 820615.

DISTRIBUTION CODE: B001S COPIES RECEIVED:LTR .J[ ENCL',$ SIZE:

TITLE: PSAR/FSAR AMDTS and"Related Correspondence NOTES:

RECIPIENT .COPIES RECIPIENT COPIES ID CODE/NAP'E LTTR ENCL ID 'CODE/NAME LTTR ENCL A/D LICENSNG 1 0 LIC BR ¹3 BC 1 0 LIC BR ¹3 LA 1 0 NERSESgV ~ 01 1 1 INTERNAL: ELD/HDS2 1 0 IE FILE 1 1 IE/DEP EPDS 35 1 1 IE/DEP/EPLB 36 MPA 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EQB 13 3 '3 NRR/DE/GB 28 2 2 NRR/DE/HGEB -30 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MITEB 17 1 1 NRR/DE/QAB 21 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SEB 25 1 NRR/DHFS/HFEB40 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/OLB 34 1 1 NRR/DHFS/PTRB20 1 NRR/DSI/AEB 26 1 1 NRR/DS I/ASB 27 1 1 NRR/DSI/CPB 10 1 1 NRR/DSI/CSB 09 1 1 NRR/DSI/ETSB 12 1 1 NRR/DSI/IiCSB 16 1 NRR/DSI/PSB 19 1 1 NRR/DS I/RAB 22 1 1 NRR D /RSB 23 1 1 NRR/DST/LGB 33 1 1 G 04 1 1 RGN2 2 2 EXTERh'AL: ACRS 41 10 10 BNL(AMDTS ONLY) 1 1 FEMA REP 0 IY 39 1 1 LPDR 03 1, 1 NRC PDR 02 1 1 NSIC 05 1 1 NTIS 1 1 iTOTAL NUMBER OF COPIES REQUIRED: LTTR 57 ENCL "52

]l II 4 if h

L .O. BOX 529100 MIAMI,F L 33'I 52 yAIJ//g FLORIDA POWER & LIGHT COMPANY Hay 24, 1982 L-82-219 Office of Nuclear Reactor Regulations Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U..S. Nuclear Regulatory Commission Wahhington, D.C. 20555

Dear Mr. Eisenhut:

Re: St. Lucie Unit No. 2 Docket No. 50-389 Minutes of S RT and PVORT Audit From May ll to Review Qualification 14, 1982 the NRC Equipment Qualification Branch, Seismic Team (SQRT) and Pump .and Valve Operability Review Team (PVORT) visited the St. Lucie Unit No. 2 Site in order to conduct an audit of the Florida Power and Light program in these areas. Attachment 1 presents the agenda for the 4 day meeting including the equipment which was audited. The audit was conducted by 3 SQRT teams and. 2 PVORT teams.

Attachment 2 presents the NRC comments regarding each piece of equipment audited and its status. Regarding the open items, FPL comm'its to submit outstanding information on all issues by June 15, 1982 or as marked in attachment 2.

Please contact us with your comments at your convenience.

Very truly yours, Robert . Uhrig Vice President Advances Systems and Technolgy REU/RAK/lej Attachment cc: J. P. O'Reilly, Region II Harold F. Reis, Esquire 8@05380 ~ 4-PEOPLE... SERVING PEOPLE

FLORIDA PWER & LIGHT COMPAPI ST. LUCIE PROJECT UNIT NO. 2 S RT & PVORT SITE AUDIT

.:ATTACHMENT 1 AGENDA 5 11/82 5/14/82)

S RT 5/11/82 5/12/82 5/13/82 Team A" 1. MSIV I-HCV-08-1B 4. CK Valve I-V-7172 7. 4.16 Kv Switchgear 2A-3

2. Valve I-Mv-08-14 (RAB Pen. EL. 9') 8. 45 Kva Transformer PP-201
3. AFM Pump (Motor) 5. ICt< Pump (RAB EL. 43')

(Trestle) 6. Rotameter FIS-21-3A-1 (Intake Structure)

Team "B" 1. Valve FCV-3301 4. HPSI Pump/Motor 7. TE-14-3A

2. Valve V-3517 5. LPSI Pump/Motor (CGJ Bldg.)
3. Valve V-3495 (ECCS) 8. Hot Shutdown and Control (RAB-0.5') 6. Valve LCV-2110P Transfer panels (RAB EL. 19.5" (RAB EL. 43')
9. Battery. Racks Team "C" 1. Gravity Damper GD-7 4. Recorder 7. Contact Output Isolator
2. Limit Switch ZS-25-24 5. Signal Characterizer 8. Multi-Nest Power Supply (RAB EL. 62') 6. RPS Cabinet 9. Distribution Module
3. Transmitter PT-1107 (Control Room) (Control Room)

P PORT Team "X" 1. Valve I-MV-08-12 3. MSiV I-HCV-08 1B 5. Valve I-V-7172 (Trestle) 4. AH< Pump (Motor) (RAB Pen EL. 9')

2. ICW Pump (Trestle) 6. Valve I-FCV-07-1A (Intake Structure) (RAB Pen EL. 28')

-Team "Y" 1. Valve FCV-3301 3. HPSI Pump/Motor 5. Valve HCV-3648

2. Valve V-2650 (ECCS Room) (RCB EL. 45')

(RAB 0.5') 4. Valve V-3517 (RAB 0.5')

5/14/82 Exit Meeting

5/14/82 SORT AND PVORT AUDIT FINDINGS AND STATUS ATTACHMENT 2 ITEM DESCRIPTION OF COMMENTS STATUS

~SRT 5/11/82 TEAM A

1) MSIV-I- Neither. airline or bypass line has supports. This item closed b~PL HCV-08-1B letter indicating supports will be

~n in- .

stalled. FPL to supply verification of support installation. Admin.

follow-up item. Airlin~

restraint design by 6/1/82; installation by 7/15/82. Bypass line restraint design by 7/23/82; installation by 8/31/82.

2) Valve I-MV-08-14 Piping where ADV Valve is mounted is missing supports. NRC FPL to verify inst notified prior to audit. at>.on of support.

Adminstrative followup item.

3) Pump AFh'ump No Comments .Closed (Motor)

(Trestle)

SORT AND PVORT AUDIT 2 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS

~SRT 5/11/82 TEAM B

1) Valve FCV-3301 1. FPL to supply bending stress information. Bending Closed stress is near allowable. Concern is about conservatism of analysis'.
2. FPL to supply pin stresses. 2. Open
2) Valve V-3517 1. Provide additional SQRT form data 1. Closed
2. Provide FEAAS6 computer code verification 2. 'Follow up
3) Valve V-3495 Conduit spacing is of concern,. (Within 5 inches of wall Closed concern is defferential movement between wall and valve) FCR supplied to NRC

3 SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS S RT 5/11/82 TEAM C

1) Gravity Damper GD-7 Model No. specified in Spec. is incorrect Revised Spec. with correct model No.

supplied to NRC 5/13/82.

Item Closed

2) Limit Switch 1. Model No. in report not in exact agreement with installed 1.FPL provided TMX 2S-25-24 model/drawing. clarifying that report covers
2. Single frequency input concern model installed.

Item closed

3. Test mounting details not in report 2.Closed-3.Closed
3) Transmitt PT-1107 1. Spacing between tubing and transmitter of concern. 1. Technical follow-up. Acceptability
2. Concern that there does not appear to be a correlation to be verified by between test data and specification 6/4/82.

2.Closed

SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/11/82 TEAN X

1. Valve I-NV-08-1 Concern on full stroking of valve to demonstrate operability Closed by Start-Up with full delta P Discussion of Test Procedure
2. Pump ICM No Comments Closed Note: SQRT Team is reviewing deflection.

calculations. Operability review may depend .

on results of that review.

SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/11/82 TEAM Y

1) Valve FCV-3301 1. Concern about maintenance program for this valve 1. Closed by GEHs description
2. Account for flow inducedvibration over life of valve 2. Open 3 . Hydro test &'eakage data not available 3. Open
2) Valve V-2650 l. Hydro test & leakage data not available l. Open
2. Need explanation of Preop testing to be performed on 2. Confirm that valve this valve (closing against full delta P needed) is part of periodic safeguards tes
3. Provide verbal confirmation of fu11 flow test on 5/13/82
3. Closed

SORT AND PVORT AUDIT FINDINGS AND'TATUS ITEM DESCRIPTION OF COMMENTS STATUS S RT 5/12/82 TEAM A

1. Valve I-V-7172 Nearby horizontal pipe supports missing. Verify when completed. Closed, pipe suppO s Check installed.
2. Pump ICW Qual. Report problems. NRC disagrees with methodology Open. FPL provided letter in report. Relative displacement between impeller and casing from Byron Jackson explain in question. ing method of ca1culation and effect of casing/impel ler interference. FPL to provide clarification on "casing/impeller int ference".
3. Rotameter FIS 3A-1 No Comments Closed

SORT AND PVORT AUDIT FINDINGS AND STATUS'TEM DESCRIPTION OF COMMENTS STATUS

~SRT Note: HPSX comments deferred to 5/13/82.

5/12/82 TEAM B

1. Pump LPSI Pump/Moto 1. Additional information needed for Motor Qualification 1. Open Report sections G, H, I, J
2. Provide computer code verification for ASME code equation for flanges 2. Follow up and also ME 9032.
2. Valve LCV-2110P Provide computer code verification for Wang computer code 2200 A/B Follow up

SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF CONNENTS STATUS S RT 5/12/82 TEAN C

1. Recorder

~

Need the required response spectrum for the location on the main control board on which recorder is installed, to compare with test response Information will available in June~

~

spectrum. '82 when it will be .

submitted to NRC.

Item is Open.

2. Signal No problem with this piece of equipment, however, Foxboro Provide confirmation Charact- cabinet in which characterizer is installed does not have of I.D. tag installation.

erizer I.D. tag.

3. RPS Cabinet 1. No I.D. Plate on cabinet 1. Closed
2. Operability proof for cabinet is not in the report. 2. Open
3. The cabinet in the field is the .actual one tested. Provide details 3. Open on cabinet and devises reconditioning.

SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/12/82 TEAM X

1. Valve 1. The NRC will consid~~

MSIV-I- informatx.on provide~

HCV-08-1B This valve is not tested under a concern.

full flow conditions. This is during the audit.

2. FP&L should continue pursuing additional type testing or model testing which may he available.

2; Pump AFW Tag on water supply to pump seal says to fillwith oil. This has been corrected 5/13/82 Closed

SORT AND PVORT AUDIT 10 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/12/82 TEAM Y 1, Pump HPSI 1. Incorrect Model No. on PVORT form . Correct No. is 5K 8110 52C57. Verify other records are correct. Correct 1. Closed PVORT form.

2. Coupling cover not secured to floor. 2. Coupling being adjusted. Will secured once

'e work is complete.

Verify by letter.

2. Valve V-3517 Valve tag unsecured Closed Tag secured

SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS SQRT 5/13/82 TEAM A

1. Switchgea 1'. Justify that welded mounting is at least as strong as tested bolted Technical follow-up.~

4.16 KV-2A3 mounting.

be made.

As an action item, an additional fourth plug weld should By June 1, 1982 FPL provide justification ll and corrective action if

2. Loose transformer in switchgear cabinet should be reattached and a necessary.

sampling made to establish that other transformers are not loose. 2. Follow-Up. FPL will procedure for 'rovide QC review oftransformer mounting and results of inspection.

2. Transform r 1. Mounting in field is different from test; however, field mount is 1. Closed 45 KVA stronger PP-201
2. No model number on this piece of equipment, serial number only. 2. Confirmatory Clarify.

~ '

SORT AND PVORT AUDIT 12 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS S RT 5/13/82 TEAM B 1.. ,1. Provide SANDE computer code verification. 1. open Pump 2. Verify rigidity of pump internals. 2. Open HPSI 3. Verify, for internals, that startup load is more severe than seismic. 3. Open (From 5/12/8 4. Provide location of driver/pump foot taper pins. 4. Open

5. Provide criteria for load distribution to determine foundation bolt 5. - Open stresses.
2. TE-14-3A 1. Test by sine sweep. No natural frequencies were established. This 1. Closed (CCW Bldg information should be provided for confirmation.
2. Support of rigid conduit is too flexible. Justify design of the 2. Technical follow-up.

support. FPL provided to NRC commitment to review support design and provide verificati~by June l, l982 and r~rk by August 2, 1982.

3. Hot Shut- 1. Verify that original purchase specification had spectra included. 1. Closed dowQ Control

/ 2. Spare cable loose in cabinets. 2. Construction memo issued Transfer to tie down loose cables Panels Closed.

3. For OBE test, RRS's are not included in report. 3. Closed. TRS envelopes RRS.

SORT AND PVORT AUDIT 12A FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS

~SRT 5/13/82 TEAM B - CONT.

4. Battery 1. Test report states that Battery LC21 has a molded rib design which 1. Confirmatory Rack ~

created cracks during the battery test. Check that SL-2 uses an improved design of LC-2l,with floating ribs.

2. One thermally aged battery cracked during rack test. Check that the 2. Confirmatory battery model LC21 which cracked is not used for SL-2.

3.. Compare natural frequency of single and double bay rack tests. 3. For Info.

4. Provide qual. report for new batteries and racks. 4. Technical follow up

SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS

~SRT 5/13/82 TEAM C

1. Contact No Comments. Closed Output Isolator 2: Multy Nes No Comments. Closed Power Supply
3. Distri- No Comments. Closed bution Module (control room)

0 SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/13/82 TEAM X

1. Valve Provide confirmation that valve has been manually cycled. Confirmatory I-V-7172
2. Valve No Comments. Closed I-FCV-07-1A

SORT AND PVORT AUDIT 15 FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS PVORT 5/13/82 TEAM Y

1. Valve HCV-3648 1. Serial No. on PVORT form incorrect, correct where 1. Closed necessary.
2. Junction box is contacting pipe support but is not 2. No FPL action.

supported on pipe support. This should be looked at for possible problems be as electrical supply is not required for the safety function this is not an open item for the Audit.

3. Describe maintenance Provide procedures on certification that this valve is air supply filter. 3. Confirmatory GEMS.

Describe test or analysis to demonstrate valve closure Closed under full delta P (Pre-op, Start-Up procedure) utilizes stiff conduit supply electrical

5. Valve operator cable to operator. How is it consideredto in analysis?
5. Closed

0 SORT AND PVORT AUDIT FINDINGS AND STATUS ITEM DESCRIPTION OF COMMENTS STATUS GENERIC CONCERNS 1. Verify that input G levels specified for purchasing of valves and 1. Confirmatory line-mounted instruments are larger than the actual computed G values from piping stress analysis.

2. Provide follow-up status of seismic qualification program 2. Follow"up
a. schedule of remaining equipment
b. monthly report on seismic equipment qualification.
3. Provide verification that unqualified limit switches will not 3. Open hamper operation of safety related valves.