ML17285B329

From kanterella
Revision as of 14:22, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for May 1990 for Washington Nuclear Plant Unit 2.W/900606 Ltr
ML17285B329
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9006180235
Download: ML17285B329 (6)


Text

ACCELERATED DISTMBUTION DEMONSTPA.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9006180235 DOC.DATE: NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, ashington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWERS,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1990 for WNP-2.W/ 00606 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 N 4DL B10 1 1 NRR/DOEA/OEAB11 1 1 XG FILE 1 1 RGN5 1 1 EXTERNAL: EGGG STUART, V. A 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 27 ENCL 27

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 June 6, 1990 U. S. Nuclear, Regulatory Commission Document Control Desk Washington, D. C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT MAY 1990 Transmitted herewith is the Monthly Operating Report as required by our, Technical Specifications 6.9.1.6.

Very Truly Your,s; C N. Powers (N/D 927M)

WNP-2 Plant Nanager,

.GNP/lc Enclosur,e cc: Nr... J. B. Mar,tin- NRC Region V Mr,. C. J. Bosted- NRC Resident Inspector, (901A)

Ms. Dottie Sherman - ANI", Farmington CT Mr.. J. T. Wheelock INPO Mr,. W. H. Lovelace - NRG; Washington D.C.

9006i80235 900531 05000397 PDR ADOCK PDC

sp II I

1 ll 4

UOCKtl NO. 50-397 UNIT NNiE WNP-2 DATE LAIT SilUTDONNS / REDUCTIONS COMPLETED BY LB HUTCHISON 19 90 TELEPflONE (509) 377-2486 REPCBT PERIOD MAY mcnth, year lt). 'D~K TT~E TKKJllb REA'HH ~ME CO 5I ~&I PBE E BEC HRENC 90-'02 4/21/90 S 744 C 4 RC FUEL XX Refueling Outage Continuing.

f SuhNABY WNP-2 remained shutdown in May for scheduled refueling outage.

TYPE METHOD SYSTEM h COMPONENT F-Forced A-Equip Failure ~ F-Admin 1-Manual Exhibit F h H S-Sched 0-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Ref ue ling H-Other 3-Auto Scram Preparation triction Entry Sheet of'ata D-Regula tory Bes 4-Continued E-Operator Training 5-Reduced Load Licensee Event Report h License Examination 9-Other (LER) File (NUREG-0161)

'AVERAGE DAILY UNIT POMER LEVEL ~

DOCKET NO.

UNIT WNP-2 DATE 6/6/90 COMPLETED BY LB HUTCHISON TELEPHONE (509) 377"2486 flONTH MAY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MwE-Net) (MwE-Net) 17.

18.

3. 19.

20.

21.

6. 22.
7. 23.
8. 24. 0
9. 25.
10. 26.

27.

12. 28.
13. 29.
14. 30.
15. 31.
16. 0 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest who1e megawatt.

These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the (or the restricted power level line). In such cases, the average daily 100'line unit power output sheet should be footnoted to explain the apparent anomaly.

  • y ~ ~ ~

OPERATING DATA REPORT WNP-2 01-Jun-90

1. DOCKET 50-397
2. REPORTING PERIOD: May-90 OUTAGE + ON-LINE HOURS 744
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

None

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
11. REASONS FOR RESTRICTIONS, IF ANY: None MONTH YEAR CUMULATIVE
12. REPORT PERIOD HOURS 744 3623 47887.2
13. HOURS REACTOR CRITICAL 0.0 2653.8 35729.1
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 0.0 2639.5 34487.4
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 0 8233337 96577777 18.

19.

20.

21.

GROSS ELECTRICAL ENERGY (MWH)

NET ELECTRICAL ENERGY (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR

-5060 0

0.04

0. 0<o 72 72

'4'2 2739380 2635133

'+o 32143330 30921276 72

'~o

'+o

22. UNIT CAPACITY FACTOR (MDC NET) 0. 0>o 66.44 59.0~
23. UNIT CAPACITY FACTOR (DER NET) 0. 04 66.14'8.74
24. UNIT FORCED OUTAGE RATE 0. 0>o 0. 0>o 8. 0<o
25. FORCED OUTAGE HOURS 0.0 0. 0 2996. 2

. 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE g DATE I DURATION)

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: 6/15/90