Corrected MOR for Mar 1997 for WNP-2
ML17292A856
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/31/1997
From: Kasko B
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17292A854 List:
References
NUDOCS 9705200193
Download: ML17292A856 (2)


Text

OPERATING STATUS REPORT for WNP-2 Date: April 1, 1997 Docket: 50-397

2. Reporting Period: MARCH 1997 Outage + On-line Hours: 633.2
3. UtilityContact: Bernice Kasko (509) 377-4473
4. Licensed Thermal Power (MW, ): 3486
5. Nameplate Rating (Gross MW, ): 1199
6. Design Electrical Rating (Net MW, ): 1153
7. Maximum Dependable Capacity - summer (Gross MW,): 1153
8. Maximum Dependable Capacity - summer (Net MW, ): 1107
9. Ifchanges occur above since last report, give reasons: none
10. Power to which restricted, if any (Net MW,): none
11. Reasons for restrictions, ifany:

MONTH YEAR CUMULATIVE Report Period Hours 744.0 2,160.0 107,792.2

13. Hours Reactor Critical 633.2 2,049.2 77,921.8
14. Rx Reserve Shutdown Hours 0.0 0.0 1,730.8
15. Hours Generator On-Line 633.2 2,049.2 75,299.3 16, Unit Reserve Shutdown Hours 110.8 110.8 2,067.0
17. Gross Thermal Energy (MWH) 1,813,573 5,421,553 223,267,583
18. Gross Electrical Energy (MWH) 602,390 1,793,744 75,178,534
19. Net Electrical Energy (MWH) 578,015 1,723,807 72,032,082
20. Unit Service Factor 85.1% 94.9% 69.9%
21. Unit Availability Factor 100.0% 100.0% 71.8%

O'2.22. Unit Capacity Factor (MDC Net) 70.2% 72.1% 61.1%

23. Unit Capacity Factor (DER Net) 67.4% .69.2% 60. 1%
24. Unit Forced Outage Rate 1.9% 0.6% 9.8%

OO: 25. Forced Outage Hours 14.8 14.8 8,457.8 O'HA, OOO 'O

~IA 26. Shutdowns scheduled over the next 6 months (type, date, duration): Refueling outage

'O' A< begins 4/18/97, duration is 60 days O'M Cl Ol 27. Ifcurrently shutdown, estimated startup date: 6/19/97 IrI QO:

+@I O'O 28. Challenges to safety/relief valves: See Table Note: Cumulative Unit Capacity Factors (MDC & DER) are calculated with weighted averages.

f~ ~ P s

~ ~