ML17292B403

From kanterella
Revision as of 12:59, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for May 1998 for WNP-2.W/980608 Ltr
ML17292B403
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1998
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-096, GO2-98-96, NUDOCS 9806150186
Download: ML17292B403 (7)


Text

CATEGORY REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESS10N NBR:9806150186 DOC.DATE: 98/05/31 NOTAR1ZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION KASKO,B. Washington Public Power Supply System SMITH,G.O. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1998 for WNP-2.W/980608 ltr. C, DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: A TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

Ei RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL  ;-g G PD4-2 PD 1 1 POSLUSNY,C 1 1 INTERNAL:

Oi 1 1 AEOD/SPD/RRAB 1 1 XL~NTER Ol 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC NRC PDR 1 1 D

'

C M

E i N

T, NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Ih (4-l 1

I

~ ~

)

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ Richland, Washington 99352-0968 June 8, 1998 G02-98-096 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT MAY 1998 Transmitted herewith is the Monthly Operating Report for the month of May 1998 as required by Technical Specification 5.6.4..

Respectfully, G. O. Smith Plant General Manager Mail Drop 927M cc: EW Merschoff - NRC RIV C Poslusny, Jr. - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston & Strawn INPO ANI Library Utility Data Institute

'

DL Williams - BPA / 399 a g 1

~ ~

~ +'l~

a.

cd&~'806iMi86 98053i PDR ADOCK 050003'PT R PDR

A h

gl I'

1

I I

~

OPERATING STATUS REPORT for WNP-2 Date: June 1, 1998 Docket: 50-397

2. Reporting Period: MAY 1998
3. Utility Contact: Bernice Kasko (509) 377-4473
4. Design Electrical Rating (Net MW,): 1153
5. Maximum Dependable Capacity - summer (Net MW,): 1107 MONTH YEAR CUMULATIVE
6. Hours Reactor Critical 0.0 2,396.0 84,641.3
7. Hours Generator On-Line 0.0 2,352.5 81,851.5
8. Unit Reserve Shutdown Hours 0.0 0.0 3,037.5
9. Net Electrical Energy (MWH) -6,756 2,563,673 78,977,530
10. Challenges to safety/relief valves: None

UNIT SHUTDOWNS DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: June 1, 1998 COMPLETED BY: B Kasko TELEPHONE: (509) 377M73 REPORT PERIOD: MAY 1998 Type F: Forced Duration No. Date S: Scheduled (Hours) Reason (1) Method (2) Cause and Corrective Action To Prevent Recurrence 98-02 4/17/98 744.0 Plant entered annual refueling and maintenance outage (R-13) on April 17, 1998

SUMMARY

The plant entered the month in the annual planned refueling/maintenance outage which began on April 17, 1998 1 REASON 2 METHOD A- utpment Failure E - Operator Training Sc 1 - Manua B - Maintenance or Test License Examination 2 - Manual Scram

-

C Refueling F - Administration 3 - Auto Scram D - Regulatory Restriction -

G Operational Error 4 - Continued H - Other 5 - Reduced Load 9 - Other

V U

<y