ML17313A806

From kanterella
Revision as of 07:38, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1999 for Pvngs,Units 1,2 & 3.With 990218 Ltr
ML17313A806
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/31/1999
From: Fulton J, Overbeck G
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
035-00529-GRO-J, 35-529-GRO-J, NUDOCS 9902260038
Download: ML17313A806 (7)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9902260038 DOC.DA FACIL:STN-50-528 Palo Verde Nuclear Station,

. OTARIZED: NO DOCKET Unit 1, Arizona Publi 05000528 I

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3', Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION FULTON,J.D. Arizona Public Service Co. (formerly Arizona Nuclear Power OVERBECK,G.R. Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION for for

SUBJECT:

Mont

.With 990218 ltr. repts Jan 1999 PVNGS,Units 1,2- &

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) E NOTES: STANDARDIZED PLANT 05000528 Standardized plant. 05000529 Standardized plant. 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD4-2 PD 1 1 FIELDS,M 1 1 INTERNAL: AC 1 1 AEOD/SPD/RRAB 1 1

=LE~CENTE ~0 1 1 OC/DBA/PAD 1 1 RGN4 1 1 EXTERNAL: ZiITCO BRYCE,J H 1 1 NOAC 1 1 D

NRC PDR 1 1 0

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

o Commttment. Innovat/Nt. &et//t/

Gregg R. Overbeck Mail Station 7602 Palo Verde Nuclear Vice President TEL 602/39~148 P.O. Box 52034 Getlerating Station Nuclear Production FAX 602/3936077 Phoenix, AZ 85072-2034 035-00529-GRO/JDF February 18, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units1,2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for JANUARY 1999 Enclosed are the Monthly Operating Reports for January 1999, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.

By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.

If you have any questions, please contact Judy Fulton at (602) 250-3549.

Sincerely, G RO/JDF/cj

Enclosures:

JANUARY 1999 Monthly Operating Reports cc: E. W. Merschoff (all w/enclosures)

P. H. Harrell I INPO Records Center Utility Data Institute +g~

'tt't/022b0038 99013k PDR ADQCK 05000528 R PDR

t NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-528 UNIT NAME: PVNGS-1 DATE: 2/17/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Janua 1999

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(Net MWe): 1243

%!'8~7(PNPII"059(P!e! IINNNNN>5IIIN IltNIltfiIIII /Nil iiwj" iiillillIIIIIIl )I ilii llilliil111 IIIIII/lllNHIlill1I1Pii[IIIIIII

  • [93!>8 IljIUnit>1KGene'ratin Is Ics Htb]gi I:)

8IlR@!jRÃ~BMNNS>/%88IIII rrHou HtHt+ slReac'tor~was~Critica

+Ht tI I.H tH+H+I. H H+I"+tl +H H+

I.i I I 744.0 744.0 82,613.2 H HtHttltt a I=XCZrbz Ii I tf +IH+i!r18gig'jPd/jigjg!NggRII

!Hours,Generator'was)O Ht I+H tI H+H I HHIt8tHttttH H+t II1t + 744.0 744.0 81,374.6 HEI/LAC llew!!LN!8!NIIN! W!IIN8]Nl!(8gN)

=-Unrt II Reserve";Shut'down H '

  • Hours 0.0 0.0 0.0 Pi!,""-$8!i,"5!%%%llIN!i!iwll!i!85%Silt!Ilj!III!@%

!::¹t-ElectricalLEnergy,,Generated;:,(MHW 925,461 925,461 96,703,742 UNIT SHUTDOWNS Types'ours Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Reason> Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of January 1999.

1F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 UNIT NAME: PVNGS-2 DATE: 2/17/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Janua 1999

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(Net MWe): 1243 lllIIIIIIIIIIIIII I)l~s<<IIIIINlfflJ I[<.%f@jg

,~2[Generatin tati sties I

I.j jl.+I +l t ffhj) ji

@@Cumulative.-fgj; I<5IIIIIIII%

HoursIRe

+h+ + Htl +HWH +H 744.0 744.0 82,929.7 NNjlflljNIIggggggIIIIIlgfiljiIIIIIjg INC.4>> 1~ 0 ~ @~4 4 t&.4 1 IH 744.0 744.0 81,736.8 0.0 0.0 0.0 946,714 946,714 98,461,099 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason2 Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of January 1999.

~F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-530 UNIT NAME: PUN GS-3 DATE: 2/1 7/99 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: Janua 1999

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity (Net MWe): 1247 IIIltllt!0'l[! t]ftl11!!!!I![ll g)fiII!."t!!*<ijiI 'iIIi)>Ill!IN!!!N!I!!IN!lljll St atistlcs':I!f

<!l!I!!j!!!!!!!I!I!!>1!!l!I!!

l.IIIIII'-.HourgsR H

eac

+ +tH.

oi~was[CrI

+4+ +I t t +Pi ica

+A Nike 744.0 744.0 77,939.6

%IIIN~II5N~%/P)I)

Hour~sG 'enerator.was~On-Li'n e

~Unit.*'Reserve.ShutdowngHours

~II~I 744.0 0.0 744.0 0.0 77,079.7 0.0 0M~+@Qig@lli iNet-Electrical Energy Generate IINlim~ tNh)

935,731 935,731 93,289,608 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Types'ours Reason2 Reactor to Prevent Occurrence No reactor shutdowns occurred during the month of January 1999.

"F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training /License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

4, V

I ~