Responds to IE Bulletin 79-05C, Nuclear Incident at TMI- Suppl. Forwards Analysis Summary in Support of Early Rc Pump Trip & Other Info Describing Actions Taken
ML19208D735
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/24/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19208D736 List:
References
IEB-79-05C, IEB-79-5C, NUDOCS 7909290452
Download: ML19208D735 (3)


Text

m

.

,

a.

.

.

.ll ,.

'

,O*

.f., .

I

, , ,. p 3 . , ,,

-

V L.

Florida Po.OnAl'O%wer Com August 24, 1979 File: 3-0-3-a-3

'rir. J.P. O'Reilly, Director U.S. Nuclear Regulatory Comission Office of Inspection and Enforcement, Suite 3100 101 Marietta Street Atlanta, GA 30303

SUBJECT:

Crystal River Unit 3 Docket No. 50-302 Operating License No. I'R-72 I.E. Bulletin 79-05C

Dear Mr. O'Reilly:

Enclosed is our response to short term action Items 1, 2 and 3 and long term action Item 1 of I.E. Bulletin 79-05C.

Please contact this office if you require any additional information.

Very truly yours, ORGAPOWERCORPORT:.sN

.( s' (

W. P. Stewart Manager, Nuclear Operations Enclosure WPShewR05 D3 cc: Director Office of Insepetion and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Director Office of Nuclear Reactor Regulation . 054 0 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 -

7909298 Y ggg OFFICIAL Mj~

~

General Office 3201 Turty-fourth s:reet soutn . P O Box 14042. st Petersburg. Ferica 33733 e 813-866 5151

Response to I.E. Bulletin 79-05C Short-Term Actions I tem 1. In the interim, until the design change required by the long-term action of this Bulletin has been incorporated, institute the following actions at your facilities:

A. Upon reactor trip and initiation of HPI caused by low reactor coolant system precsure, immediately trip all operating RCPs.

b. Provide two licensed operators in the control room at all times during operation to accomplish this action and other immediate and followup actions required during such an occurence. For facilities with dual control rooms, a total of three licensed operators in the dual control room at all times meets the requirements of this Bulletin.

Response

The action requested in I tems 1. A and 1.B. have been implemented at Crystal River Unit 3.

Iten 2 Perform and submit a report of LOCA analyses for your plants for a range of small break sizes and a range of time lapses between reactor trip and pump trip. For each pair of values of the parameters, determine the peak cladding temperature (PCT) which results. The range of values for each parameter nust be wide enough to assure that the maximum PCT or, if appropriate, the region containing PCTs greater than 2200 degrees F is identified.

Response

The enclosed report " Analysis Summary In Support of an Early RC Pump Trip" is being submitted in response to Item 2. This report contains a Section 3, " Impact Assessment of a RC Pump Trip on non-LOCA Events", which is included to allow the development of non-LOCA guidelines as required by I tem 3. Also additional work is presently underway by B&W which will be subritted by FPC on September 14, 1979 as additional information to complete our response to Item 2.

I tem 3 Based on the analyses done under Item 2 above, develop new guidelines for operator action, for fath LOCA and non-LOCA transients, that take into account the impact of RCP trip requirements. For Babcock & Wilcox designed reactors, such guidelines should include appropriate requirements to fill the steam generators to a higher level, following RCP trip, to promote natural circulation flow.

Response

The enclosed report, " Guidelines for Operator Action" is being submitted in response to Item 3.

Baynard (Resp 79-05C) .

Page 2 Long-Term Action I Item 1: Propose and submit a design which will assure automatic tripping of the operating RCPs under all circumstances in which this action may be needed.

Response

A short term modification design and schedule are attached. Babcock and Wilcox is working on a long-term conceptual design. Florida Power Corporation will submit this design and proposed schedule for implementation by October 31, 1979.

Baynard (Resp 79-05C)

'