Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20240122024-11-0101 November 2024 Commercial Grade Dedication Inspection Report 05000341/2024012 IR 05000341/20245012024-10-0808 October 2024 – Emergency Preparedness Inspection Report 05000341/2024501 ML24276A2032024-10-0303 October 2024 FEMA Level 1 Finding Transmittal Letter ML24268A0992024-10-0101 October 2024 Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance IR 05000341/20240132024-09-30030 September 2024 Phase 2 Post Approval License Renewal Report 05000341/2024013 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24257A1652024-09-13013 September 2024 FEMA Region 5 Fermi 2 Nuclear Power Plant Level 1 Finding September 2024 ML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20244042024-08-21021 August 2024 Public-Fermi Power Plant, Unit 2 - Material Control and Accounting Program Inspection Report 05000341/2024404 IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 – Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000341/20213012021-07-13013 July 2021 NRC Initial License Examination Report 05000341/2021301 IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 IR 05000341/20173012017-05-31031 May 2017 NRC Initial License Examination Report 05000341/2017301 (Meb) IR 05000341/20153012015-10-0707 October 2015 Examination Report 05000341/2015301; 08/24/2015 - 09/03/2015; DTE Energy Company, Fermi Power Plant, Unit 2, Initial License Examination Report; (Meb) IR 05000341/20133012013-10-29029 October 2013 Er 05000341-13-301(DRS); 09/09/2013 - 09/24/2013; Detroit Edison Company, Fermi Power Plant, Unit 2, Initial License Examination Report IR 05000341/20123012012-04-12012 April 2012 Er 05000341-12-301(DRS); 03/19/2012-03/30/2012; Detroit Edison Company, Fermi Power Plant, Unit 2. Initial License Examination Report IR 05000341/20103012010-10-29029 October 2010 Er 05000341-10-301(DRS), on 08/30/2010 - 09/17/2010, Fermi Power Station, Unit 2, Initial License Exam Report IR 05000341/20093012009-04-29029 April 2009 Er 05000341-09-301(DRS), on 3/16/2009 - 3/26/2009, Detroit Edison Company, Fermi Power Plant, Unit 2, Initial License Examination Report IR 05000341/20063022006-09-0606 September 2006 Er 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written Retake Examination Report IR 05000341/20063012006-05-0101 May 2006 Er 05000341-06-301(DRS); Fermi Power Plant, Unit 2; Initial License Examination Report IR 05000341/20043012004-11-0505 November 2004 Er 05000341-04-301(DRS); 09/20/2004-09/24/2004; Fermi Power Plant, Unit 2; Initial License Examination Report IR 05000341/20033022003-08-20020 August 2003 Er 05000341/2003-302(DRS); Detroit Edison Company; 07/07/03; Fermi 2 Nuclear Power Station. Initial License Examination Report NRC-02-0059, Preparation and Scheduling of Operator Licensing Examinations2002-07-10010 July 2002 Preparation and Scheduling of Operator Licensing Examinations 2021-07-13
[Table view] |
Text
September 6, 2006Mr. Donald K. CobbAssistant Vice President Nuclear Generation Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166SUBJECT:FERMI POWER PLANTNRC INITIAL LICENSE EXAMINATION REPORT 050000341/2006302(DRS)
Dear Mr. Cobb:
On August 8, 2006, members of the Fermi Power Plant Training staff administered the writtenretake examination to two Reactor Operator (RO) applicants who had previously failed the written examination administered on March 10, 2006. The results of the examination werefinalized on August 16, 2006, showing the applicants passed the written examination. Theapplicants previously passed the operating test administered the week of March 6, 2006, andtherefore, have now passed all sections of the license examination. The enclosed report documents the results of the examination which were discussed on August 16, 2006, withMr. Edwin Kokosky, and with other members of your staff.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andits enclosure will be available electronically for public inspection in the NRC Public DocumentRoom, or from the Publicly Available Records (PARS) component of NRC's document system(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
D. Cobb-2-We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/Hironori Peterson, ChiefOperations Branch Division of Reactor SafetyDocket No. 50-341License No. NPF-43
Enclosures:
1.Operator Licensing Examination Report 050000341/2006302(DRS)
w/Attachment: Supplemental Information2.Written Examination and Answer Key (RO Retake)
REGION IIIDocket No:50-341License No:NPF-43Report No:050000341/2006302(DRS)
Licensee:Detroit Edison Company Facility:Fermi Power Plant Location:6400 North Dixie HighwayNewport, MI 48166Dates:August 16, 2006 Examiners:R. K. Walton, Chief Examiner Approved by:H. Peterson, ChiefOperations Branch Division of Reactor SafetyEnclosure 1 Enclosure 1 2
SUMMARY OF FINDINGS
ER 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written RetakeExamination Report.The operator licensing written retake examination was administered by the licensee inaccordance with the guidance of NUREG-1021, "Operator Licensing Examination Standards forPower Reactors," Revision 9.Examination Summary
- A written retake examination was administered to two Reactor Operator (RO) applicantson August 8, 2006.*The two applicants passed the written examination. The applicants passed theoperating test administered the week of March 6, 2006, and therefore, have now passedall sections of their examination. The applicants were issued the applicable operatorlicenses on August 22, 2006.
3
REPORT DETAILS
4.OTHER ACTIVITIES (OA)4OA5Other.1Initial Licensing Examinations
a. Examination Scope
The licensee wrote and administered an NRC approved written retake examination onAugust 8, 2006. The NRC outline and written examination was written and reviewedusing the guidance established in NUREG-1021, "Operator Licensing ExaminationStandards for Power Reactors," Revision 9.
b. Findings
There were no post-examination comments from the written examination. The applicants previously passed the operating exam that was administered during the week of March 6, 2006. The applicants were granted a waiver for the operating test.
Each applicant successfully passed the written examination..2Examination Security
a. Inspection Scope
The NRC examiners briefed the facility contact on the NRC's requirements andguidelines related to examination physical security (e.g., access restrictions). The licensee implemented examination security and integrity measures (e.g., security agreements) in accordance with licensee procedures.
b. Findings
No findings were noted in this area. 4OA6MeetingsExit MeetingThe chief examiner conducted a telephone exit meeting on August 16, 2006, withMr. E. Kokosky and other members of the Training Department staff. ATTACHMENT:
SUPPLEMENTAL INFORMATION
1Attachment
1SUPPLEMENTAL INFORMATIONKEY POINTS OF CONTACTLicensee
- E. Kokosky, Manager, Nuclear Training
- T. Horan, Operations Training Supervisor
- D. Coseo, Shift Engineer, Operations
NRC
- R. Walton, Chief ExaminerITEMS OPENED, CLOSED, AND DISCUSSEDOpened, Closed, and DiscussedNone
2Attachment
2LIST OF ACRONYMS
USEDADAMSAgency-Wide Document Access and Management SystemDRSDivision of Reactor Safety
NRCNuclear Regulatory Commission
PARSPublicly Available Records
ROReactor Operator
SROSenior Reactor Operator
WRITTEN EXAMINATION AND ANSWER KEY (RO Retake)RO Retake Written Examination ADAMS Accession # ML062420268.Enclosure 2