September 6, 2006
SUBJECT:
FERMI POWER PLANT NRC INITIAL LICENSE EXAMINATION REPORT 050000341/2006302(DRS)
Dear Mr. Cobb:
On August 8, 2006, members of the Fermi Power Plant Training staff administered the written retake examination to two Reactor Operator (RO) applicants who had previously failed the written examination administered on March 10, 2006. The results of the examination were finalized on August 16, 2006, showing the applicants passed the written examination. The applicants previously passed the operating test administered the week of March 6, 2006, and therefore, have now passed all sections of the license examination. The enclosed report documents the results of the examination which were discussed on August 16, 2006, with Mr. Edwin Kokosky, and with other members of your staff.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). We will gladly discuss any questions you have concerning this examination.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43
Enclosures:
1.
Operator Licensing Examination Report 050000341/2006302(DRS)
w/Attachment: Supplemental Information 2.
Written Examination and Answer Key (RO Retake)
REGION III==
Docket No:
50-341 License No:
NPF-43 Report No:
050000341/2006302(DRS)
Licensee:
Detroit Edison Company Facility:
Fermi Power Plant Location:
6400 North Dixie Highway Newport, MI 48166 Dates:
August 16, 2006 Examiners:
R. K. Walton, Chief Examiner Approved by:
H. Peterson, Chief Operations Branch Division of Reactor Safety Enclosure 1
Enclosure 1
SUMMARY OF FINDINGS
ER 05000341/2006302(DRS); 08/16/2006; Fermi Power Plant; Initial License Written Retake
Examination Report.
The operator licensing written retake examination was administered by the licensee in accordance with the guidance of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
Examination Summary:
- A written retake examination was administered to two Reactor Operator (RO) applicants on August 8, 2006.
- The two applicants passed the written examination. The applicants passed the operating test administered the week of March 6, 2006, and therefore, have now passed all sections of their examination. The applicants were issued the applicable operator licenses on August 22, 2006.
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other
.1 Initial Licensing Examinations
a. Examination Scope
The licensee wrote and administered an NRC approved written retake examination on August 8, 2006. The NRC outline and written examination was written and reviewed using the guidance established in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9.
b. Findings
There were no post-examination comments from the written examination.
The applicants previously passed the operating exam that was administered during the week of March 6, 2006. The applicants were granted a waiver for the operating test.
Each applicant successfully passed the written examination.
.2 Examination Security
a. Inspection Scope
The NRC examiners briefed the facility contact on the NRCs requirements and guidelines related to examination physical security (e.g., access restrictions). The licensee implemented examination security and integrity measures (e.g., security agreements) in accordance with licensee procedures.
b. Findings
No findings were noted in this area.
4OA6 Meetings
Exit Meeting The chief examiner conducted a telephone exit meeting on August 16, 2006, with Mr. E. Kokosky and other members of the Training Department staff.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- E. Kokosky, Manager, Nuclear Training
- T. Horan, Operations Training Supervisor
- D. Coseo, Shift Engineer, Operations
NRC
- R. Walton, Chief Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None
LIST OF ACRONYMS USED
Agency-Wide Document Access and Management System
Division of Reactor Safety
NRC
Nuclear Regulatory Commission
Publicly Available Records
Reactor Operator
Senior Reactor Operator
WRITTEN EXAMINATION AND ANSWER KEY (RO Retake)
RO Retake Written Examination ADAMS Accession # ML062420268.