MONTHYEARIR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 IR 07200031/20204012020-10-21021 October 2020 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report No. 07200031/2020401 IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) IR 05000029/20160012016-05-18018 May 2016 IR 07200031-16-001 and 05000029-16-001 on 4/20/16, Yankee Atomic Electric Company, Rowe, Ma Site IR 07200031/20140012014-05-0606 May 2014 IR 07200031-14-001, on 04/14-15/14, Independent Spent Fuel Storage Installation, Yankee Atomic Electric Company, Rowe, Ma Site ML1036300432010-12-28028 December 2010 IR 07200031-10-001, on 11/30/10, Yankee Atomic Electric Company, Rowe, Ma (Transmittal Letter) IR 07200031/20100012010-12-28028 December 2010 IR 07200031-10-001, on 11/30/10, Yankee Atomic Electric Company, Rowe, Ma IR 05000029/20060012007-07-0202 July 2007 Combined IR 05000029-06-001 and 05000029-07-001, in 2006-2007, Yankee Atomic Electric Company, Rowe, Massachusetts ML0717007532007-03-16016 March 2007 Yankee Nuclear Power Station, Site Closure Project, Phase IV Final Inspection Report IR 05000029/20050022006-06-13013 June 2006 IR 05000029-05-002; on 08/01/2005 to 05/15/2006; Yankee Nuclear Power Station ML0615304212006-03-13013 March 2006 In-Process Inspection Survey Results for the Remaining Spent Fuel Pool and Northeastern Upper RCA Yard Excavations and Concrete Structures within the Excavations at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No 50-29; Rft IR 05000029/20050012005-10-18018 October 2005 IR 05000029-05-001, on 02/01/2005 - 08/31/2005, Yankee Atomic Electric Company, Rowe, Massachusetts ML0615303792005-10-12012 October 2005 In-Process Inspection Cursory Survey Results for the Primary Auxiliary Building Remaining Walls at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) IR 05000029/20040022005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) ML0513600812005-02-16016 February 2005 Confirmatory Survey Results for Class 3 Open Land Areas Outside the RCA, Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 04-007) IR 05000029/20040012004-09-20020 September 2004 IR 05000029-04-001, on 01/22/2004 - 08/05/2004, Yankee Atomic Electric Company IR 05000029/20030022004-02-12012 February 2004 IR 05000029-03-002, on 06/28/03 to 01/21/04, Yankee Atomic Electric Company, Rowe, Massachuetts ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000029/20020022003-01-27027 January 2003 IR 05000029-02-002, on 07/08/2002 - 01/03/2003, Yankee Atomic Electric Co., Rowe, Massachusetts. Decommissioning Activities IR 05000029/20020012002-08-12012 August 2002 IR 05000029-02-001, on 07/07/02, Yankee Atomic Electric Company, to Determine Whether the Decommissioning Activities Carried Out at Yankee Rowe Facility Were Conducted Safely and in Accordance with NRC Requirements IR 05000029/20010032002-03-20020 March 2002 IR 05000029/2001-003, Yankee Atomic Electric Company IR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts IR 05000029/19900141990-09-0707 September 1990 Rev 1 to Notification of Significant Licensee Meeting 90-110 on 900921 in Region I Ofc Re Insp Rept 50-029/90-14 IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19890801990-07-25025 July 1990 Ack Receipt of Re Violations Noted in Insp Rept 50-029/89-80 IR 05000029/19900061990-07-24024 July 1990 Exam Rept 50-029/90-06OL on 900619-21.Exam Results:All Three Candidates Passed Exams & Issued Licenses IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical 2023-10-04
[Table view] Category:Inspection Report Correspondence
MONTHYEARIR 05000029/20060012007-07-0202 July 2007 Combined IR 05000029-06-001 and 05000029-07-001, in 2006-2007, Yankee Atomic Electric Company, Rowe, Massachusetts ML0717007532007-03-16016 March 2007 Yankee Nuclear Power Station, Site Closure Project, Phase IV Final Inspection Report ML0615304122006-01-25025 January 2006 Report for Analysis of Concrete Samples from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2005-002) (Rfta No. 06-001) IR 05000029/20010032002-03-20020 March 2002 IR 05000029/2001-003, Yankee Atomic Electric Company 2007-07-02
[Table view] Category:Letter
MONTHYEARIR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) ML18136A5552018-04-10010 April 2018 Yankee Nuclear Power Station, and Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2017 ML18078A3012018-03-0505 March 2018 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML18075A3252018-03-0505 March 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML17108A8282017-04-0303 April 2017 Yankee Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2016 ML17090A5292017-03-31031 March 2017 Independent Spent Fuel Storage Installation (ISFSI) - Transmittal of 10 CFR 50.59, 10 CFR 72.48, and Commitment Change Annual Reports and Notifications 2023-05-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 July 2, 2007Mr. Wayne A. NortonPresident and Chief Executive Officer Yankee Atomic Electric Company 49 Yankee Road Rowe, Massachusetts 01367SUBJECT:COMBINED INSPECTION 0500029/2006001 AND 05000029/2007001,YANKEE ATOMIC ELECTRIC COMPANY, ROWE, MASSACHUSETTS
Dear Mr. Norton:
On June 5, 2007, the United States Nuclear Regulatory Commission completed an announcedinspection at your Yankee Rowe facility. The enclosed report (Enclosure 1) documents the inspection results which were discussed with Mr. Bourassa and other members of your staff on June 5, 2007.The inspection examined decommissioning activities conducted under your LicenseTermination Plan (LTP) as they related to safety, and compliance with the Commission's rules and regulations. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.The report also includes two survey reports (Enclosures 2 and 3) conducted by the Oak RidgeInstitute for Science and Education (ORISE).Based on the results of this inspection, no violations were identified. No reply to this letter isrequired.In accordance with Section 2.390 of the NRC's "Rules and Practices," Part 2, Title 10, Code ofFederal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Your cooperation with us is appreciated.
Sincerely,
/RA/Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials SafetyDocket No. 05000029; ISFSI Docket No. 07200031License No. DPR-03 July 2, 2007Mr. Wayne A. NortonPresident and Chief Executive Officer Yankee Atomic Electric Company 49 Yankee Road Rowe, Massachusetts 01367SUBJECT:COMBINED INSPECTION 0500029/2006001 AND 05000029/2007001,YANKEE ATOMIC ELECTRIC COMPANY, ROWE, MASSACHUSETTS
Dear Mr. Norton:
On June 5, 2007, the United States Nuclear Regulatory Commission completed an announcedinspection at your Yankee Rowe facility. The enclosed report (Enclosure 1) documents the inspection results which were discussed with Mr. Bourassa and other members of your staff on June 5, 2007.The inspection examined decommissioning activities conducted under your LicenseTermination Plan (LTP) as they related to safety, and compliance with the Commission's rules and regulations. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.The report also includes two survey reports (Enclosures 2 and 3) conducted by the Oak RidgeInstitute for Science and Education (ORISE).Based on the results of this inspection, no violations were identified. No reply to this letter isrequired.In accordance with Section 2.390 of the NRC's "Rules and Practices," Part 2, Title 10, Code ofFederal Regulations, a copy of this letter and its enclosure will be placed in the NRC Public Document Room (PDR) and will be accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Your cooperation with us is appreciated.
Sincerely,
/RA/Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials SafetyDocket No. 05000029; ISFSI Docket No. 07200031License No. DPR-03DOCUMENT NAME: C:\FileNet\ML071860234.wpdSUNSI Review Complete: LKauffmanAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
"C" = Copy w/o attach/encl "
E" = Copy w/ attach/encl "
N" = No copyOFFICEDNMS/RI NDNMS/RIDNMS/RINAMELKauffmanRLorsonDATE07/2/0707/2/07OFFICIAL RECORD COPYACCESSSION NO. ML071860234 W. Norton2
Enclosures:
1.NRC Region I Inspection Report No. 05000029/2006001 and05000029/20070012.In-Process Inspection Survey Results for Selected Inside and OutsideOpen Land Area Survey Units at the Yankee Nuclear Power Station, Rowe, Massachusetts [Docket No. 50-29; RFTA No. 05-008], dated August 17, 2006 [ADAMS A
REGION IINSPECTION REPORTInspection Nos.05000029/2006001 and 0500029/2007001Docket No.05000029 License No.DPR-03 Licensee:Yankee Atomic Electric Company (YAEC)
Facility:Yankee Rowe Plant (Yankee Rowe)
Location:49 Yankee Road Rowe, Massachusetts 01367Inspection Dates:June 20-22, 2006August 21-25, 2006 September 25-27, 2006 October 24-26, 2006 February 20, 2007 June 5, 2007Inspectors:David Everhart, Health Physicist, Division of Reactor SafetyLaurie A. Kauffman, Health Physicist, Decommissioning Branch Mark Roberts, Senior Health Physicist, Decommissioning BranchApproved By:Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials Safety ii
EXECUTIVE SUMMARY
Yankee Atomic Electric CompanyNRC Combined Inspection Report Nos. 05000029/2006001 and 05000029/2007001The report covered a twelve-month period of inspection by three Region I health physics inspectors. The inspectors examined decommissioning activities conducted under your License
Termination Plan (LTP) as they related to safety, and compliance with the Commission's rules and regulations. The report includes evaluations of your decommissioning activities related to:
organization; management oversight; the audit and surveillance program; the corrective action program; the independent spent fuel storage installation (ISFSI); the decommissioning performance and final status survey programs; the radiation protection program; and, the radioactive waste transportation program. The report also includes two Oak Ridge Institute for Science and Education (ORISE) Reports regarding confirmatory inspections conducted in Juneand October 2006. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Facilities Management and Control*The YAEC staff maintained an adequate audit and surveillance program, and correctiveaction program. (Section 1.1)*The YAEC security personnel maintained an adequate program for surveillance andmonitoring of the ISFSI and stored spent fuel. (Section 1.2)Decommissioning Performance and Status Review*The YAEC staff conducted decommissioning activities in accordance with the approvedLicense Termination Plan (LTP) requirements and adequately implemented sampling and survey procedures and protocols to support the final status survey program.
(Section 2.0)Plant Support*The YAEC radiation protection staff implemented an effective program to control andlimit occupational radiation exposures. The YAEC staff effectively implemented the radioactive waste transportation program. The YAEC staff implemented and maintained the Radiological Environmental Monitoring Program (REMP) in accordance with the Offsite Dose Calculation Manual (ODCM) requirements. (Sections 3.1, 3.2, and 3.3)
Enclosure
REPORT DETAILS
Summary of Facility StatusThe Yankee Nuclear Power Station (YNPS) is owned by Yankee Atomic Electric Company(YEAC). The YEAC began operations in 1960, and in February 1992 permanently ceased operations and commenced decommissioning activities. In June 2002, YEAC commenced operation of the Independent spent fuel storage installation (ISFSI), and in June 2003 all fuel was transferred to the ISFSI pad. In March 2007, YEAC submitted a letter of intent concerning the phased release of land from the Part 50 license. As of June 2007, YEAC completed all decommissioning activities per the License Termination Plan (LTP).1.0Facilities Management and Control1.1Audit, Surveillance, and Corrective Action Program
a. Inspection Scope
(IP 40801)The inspectors reviewed audit report (YR-06-A06-01) of the Final Status Survey (FSS)Program and License Termination Plan. The inspectors evaluated YAEC's surveillance report of the free release program and several condition reports (CRs) to assess YAEC's ability to identify, resolve, and prevent the recurrence of conditions that could degrade the safety or quality of decommissioning activities. The inspectors reviewed the CRs for issues related to the following: the FSS program, the safeguards program, the radiation protection program, and the transportation of radioactive waste program.b.Observations and FindingsNo findings of significance were identified.
The audit and surveillance activities performed by YAEC staff were sufficiently detailedand thorough to identify areas of declining performance. The staff maintained an effective program for reporting potential safety issues by generating CRs when deficiencies were noted, and by entering the CRs into the corrective action program for resolution. The inspectors determined that the reviewed CR issues did not impact safety and were properly dispositioned.c.ConclusionsThe YAEC staff maintained an adequate audit and surveillance program, and correctiveaction program.
2Enclosure1.2Independent Spent Fuel Storage Installationa.Inspection Scope (IP 60855)The inspectors reviewed procedures, maintenance and surveillance records, andinterviewed selected independent spent fuel storage installation (ISFSI) operations personnel. The inspectors toured the ISFSI, observed shift rounds, and discussed ISFSI operations, security and safeguards issues with the ISFSI Manager and ISFSI Shift Manager.b.Observation and FindingsNo findings of significance were identified.
The inspectors noted that the vertical concrete casks were in good material condition,the ventilation openings were unobstructed, and the perimeter fence was intact and properly posted. The inspectors verified that the control room systems were operable.
The inspectors noted that the ISFSI Shift Supervisor (ISS) implemented routine maintenance and surveillance activities in accordance with the associated procedures.
c. Conclusions
The YAEC personnel maintained an adequate program for surveillance and monitoring of the ISFSI and stored spent fuel.2.0Status of Decommissioning Performance and Inspection of Final Status Surveysa.Inspection Scope (IPs 71801 and 83801)The inspectors evaluated the status of decommissioning activities and the FSS programto verify that the licensee was conducting decommissioning activities in accordance with the License Termination Plan (LTP). The inspectors conducted site tours and discussed the FSS activity schedule. The inspectors and the NRC's contractor, Oak Ridge Institute of Science and Education (ORISE), performed independent inspections in June and October 2006.b.Observations and FindingsNo findings of significance were identified.
The inspectors reviewed selected YAEC Survey Unit (SU) survey plans and soilsampling procedures. The inspectors noted that the survey plans contained adequate guidance to conduct the surface scans and to ensure reproducible representative soil samples consistent with industry practice. The inspectors noted that YAEC's FSS Program was essentially complete. The FSS reports have been submitted to the NRC for final review.On June 21-22, 2006, ORISE performed an in-process survey of selected inside openland areas (NOL-04-01 and NOL-05-01) and outside open land areas (OOL-09-01, OOL-09-02, OOL-07-02, and OOL07-03). These surveys included gamma surface scans and soil sampling within these SUs. On October 24, 2006, ORISE performed 3Enclosureradiological surveys for the industrial area and selected OOL area survey units(OOL-03-02, 00L-05-05, OOL-05-06, OOL-05-09, OOL-05-10, and OOL-08-07). The surveys included gamma surface scans in the industrial area and the selected SUs.
The soil samples from both ORISE surveys, were analyzed by the NRC's contract laboratory, ORISE. The gamma spectroscopy results for the soil samples were below the derived concentration guideline levels specified in the LTP. The details of the ORISE analyses are contained in the enclosed ORISE Reports.c.ConclusionsThe YAEC staff conducted decommissioning activities in accordance with the LTPrequirements and adequately implemented sampling and survey procedures and protocols to support the FSS program.3.0Plant Support3.1Radiation Protectiona.Inspection Scope (IP 83750)The inspectors reviewed the licensee's radiation protection program in order todetermine the licensee's capability to monitor and control radiation exposure to employees and to determine the adequacy of the Radiation Protection (RP) program.b.Observations and FindingsThe inspectors noted that the RP staff had implemented the free release program,which included conducting surveys of tools and equipment prior to release from the site.
The inspectors selected and reviewed survey records and verified that no detectable activity above background was identified on any tools and equipment prior to release from the site.c.ConclusionsThe YAEC RP staff implemented an effective program to control and limit occupationalradiation exposure.
4Enclosure3.2Radiological Environmental Monitoring Program (REMP) and Radioactive EffluentControl Program (RECP)a.Inspection Scope (IP 84750)The inspectors evaluated the Annual Radioactive Effluent Release Report and theAnnual Environmental Monitoring Operating Report, and the analytical results, to verify that the REMP and RECP were implemented as required by the Quality Assurance Plan (QAP) and the Offsite Dose Calculation Manual (ODCM). The review included changes to the ODCM, which included significant reductions in the REMP and the elimination of the RECP. The inspectors evaluated the direct external dose from fixed sources of radioactive materials by comparing the 2006 environmental thermoluminescent dosimeter (TLD) data for the offsite indicator, control, and outer ring locations. The inspectors compared these data with the on-site ISFSI TLD results and verified that there was no measurable station-related direct radiation dose at or beyond the site boundary. The inspectors verified that the total dose to the maximum off-site individual for 2006 was below the EPA dose limit (25 mrem/year) criteria in 40 CFR 190.b.Observations and FindingsNo findings of significance were identified.
The inspectors noted that following the completion of the ISFSI in June 2003, the spentfuel pool (SFP) water inventory was processed by filtration and demineralization systems, and was released to the environment as a controlled liquid waste discharge in accordance with the ODCM. The SFP water was the final major source of station process water requiring processing as part of site decommissioning. The inspectors noted that YAEC made no gaseous or liquid effluent releases from June 2003 to June 2007. The inspectors noted that YAEC eliminated the RECP based on the completion of decommissioning activities.The inspectors noted that YAEC reduced the REMP in October 2006. The program wasreduced to measure only direct dose through implementation of the environmental TLD program.c.ConclusionsThe YAEC staff implemented and maintained the Radiological Environmental MonitoringProgram (REMP) in accordance with the Offsite Dose Calculation Manual (ODCM)requirements.
5Enclosure3.3Transportation of Radioactive Wastea.Inspection Scope (IP 86750)The scope of this inspection area was to evaluate YAEC's program for transportation ofradioactive waste and to determine whether the YEAC staff properly processed, packaged, stored, and shipped radioactive materials. The inspectors reviewed the radioactive waste shipments, which included dry active waste and low-level radioactive demolition debris. The inspectors observed the YEAC staff conduct surveys and prepare shipments for transport.b.Observations and FindingsNo findings of significance were identified.
The selected radioactive waste shipment records included completed copies ofcharacterization reports, waste manifest shipping papers, emergency response information, survey record forms, and related documentation (i.e. shipment inspection plans and truck inspection records). The YAEC staff met the applicable radiation and transportation requirements for the shipments reviewed.c.ConclusionsThe YAEC staff effectively implemented the radioactive waste transportation program.4.0Exit Meeting SummaryOn June 5, 2007, a summary of the inspection findings for the entire inspection period waspresented to the Mr. J. Bourassa and members of your staff. The inspectors confirmed that proprietary and safeguards information were not included in this inspection report. Attachment:Supplemental Information A-1Attachment
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Licensee
- G. Babineau, YAEC Radiation Protection Manager
- R. Benner, YAEC Director of Decommissioning
- J. Bourassa, YAEC Director of Site Closure and Project Support
- J. Connell, YAEC ISFSI RPM & QA
- M. Erickson, YAEC FSS Project Manager
- J. Lenois, Connecticut Yankee ISFSI Manager
- R. Mitchell, YAEC ISFSI Manager
- G. van Noordennen, YAEC Regulatory Affairs Manager
- F. Williams, YAEC ISFSI Operations ManagerINSPECTION PROCEDURES USED40801Self-Assessment, Auditing, and Corrective Action60855Operation of Independent Spent Fuel Storage Installation
71801Decommissioning Performance and Status Reviews
83750Occupational Radiation Exposure
83801Inspection of Final Status Surveys
86750Solid Radioactive Waste Management and Transportation of Radioactive MaterialsITEMS OPEN, CLOSED, AND DISCUSSEDOpened None Closed None Discussed NoneLIST OF ACRONYMS USEDCRCondition ReportsFSSFinal Status Survey
ISFSIIndependent Spent Fuel Storage Installation
ISSShift Supervisor
LTPLicense Termination Plan
NOLinside open land areas
OOLoutside open land areas
ORISEOak Ridge Institute for Science and Education
RPRadiation Protection
SUSurvey Unit
YAECYankee Atomic Electric Company