YANKEE ATOMIC ELECTRIC COMPANY 49 Yankee Road, Rowe, Massachusetts OJ 367 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 April 10, 2018 BYR 2018-010 10 CFR 50.4 and IO CFR 50.36a(a)(2)
Yankee Atomic Electric Company Yankee Nuclear Power Station Independent Spent Fuel Storage Installation NRC License No. DPR-3 (NRC Docket No.50-029)
Subject:
Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2017 10 CFR 50.36a(a)(2), Section 2.3.2 of Appendix C of the Yankee Atomic Electric Company (YAEC) Quality Assurance Program (QAP) for the Yankee Rowe Independent Spent Fuel Storage Installation (ISFSI), and Section 3.2 of the Yankee Nuclear Power Station ISFSI Off-Site Dose Calculation Manual (ODCM), require YAEC to submit an Annual Radioactive Effluent Release Report. Enclosure 1 provides this report for the period of January 1 through December 31, 2017.
Section 2.3.1 of Appendix C of the Y AEC QAP for the Yankee Rowe ISFSI and Section 3.1 of the Yankee Nuclear Power Station ISFSI ODCM require the submittal of an Annual Radiological Environmental Operating Report. Enclosure 2 provides the report for the period of January 1 through December 31, 2017.
Section 2.2.b) of Appendix C of the Y AEC Quality Assurance Program for the Yankee Rowe ISFSI requires that any changes to the ODCM to be submitted as part of or concurrent with the Annual Radioactive Effluent Release Report. No revisions to the Yankee Nuclear Power Station ISFST ODCM were issued during calendar year 2017.
If you have any questions regarding this submittal, please do not hesitate to contact me at (413) 424-5261 ext. 303.
Respectfully,
~£~
Brian Smith TSFST Manager
Yankee Atomic Electric Company BYR 2018-010/ Apri 1 10, 2018/Page 2
Enclosures:
- 1. Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January-December 2017.
- 2. Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January - December 2017 cc:
D. Lew, Acting NRC Region I Administrator R. Powell, Chief, Decommissioning Branch, NRC, Region I J. Nguyen, NRC Project Manager J. W. Priest, Director DPH, Radiation Control Program