MONTHYEARIR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 IR 07200031/20204012020-10-21021 October 2020 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report No. 07200031/2020401 IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 IR 07200031/20184012018-05-17017 May 2018 Inspection Report 07200031/2018401, on May 17, 2018, Yankee Atomic Electric Company - ISFSI Security Inspection Report 07200031/2018401 - (Cover Letter Only) IR 05000029/20160012016-05-18018 May 2016 IR 07200031-16-001 and 05000029-16-001 on 4/20/16, Yankee Atomic Electric Company, Rowe, Ma Site IR 07200031/20140012014-05-0606 May 2014 IR 07200031-14-001, on 04/14-15/14, Independent Spent Fuel Storage Installation, Yankee Atomic Electric Company, Rowe, Ma Site ML1036300432010-12-28028 December 2010 IR 07200031-10-001, on 11/30/10, Yankee Atomic Electric Company, Rowe, Ma (Transmittal Letter) IR 07200031/20100012010-12-28028 December 2010 IR 07200031-10-001, on 11/30/10, Yankee Atomic Electric Company, Rowe, Ma IR 05000029/20060012007-07-0202 July 2007 Combined IR 05000029-06-001 and 05000029-07-001, in 2006-2007, Yankee Atomic Electric Company, Rowe, Massachusetts ML0717007532007-03-16016 March 2007 Yankee Nuclear Power Station, Site Closure Project, Phase IV Final Inspection Report IR 05000029/20050022006-06-13013 June 2006 IR 05000029-05-002; on 08/01/2005 to 05/15/2006; Yankee Nuclear Power Station ML0615304212006-03-13013 March 2006 In-Process Inspection Survey Results for the Remaining Spent Fuel Pool and Northeastern Upper RCA Yard Excavations and Concrete Structures within the Excavations at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No 50-29; Rft IR 05000029/20050012005-10-18018 October 2005 IR 05000029-05-001, on 02/01/2005 - 08/31/2005, Yankee Atomic Electric Company, Rowe, Massachusetts ML0615303792005-10-12012 October 2005 In-Process Inspection Cursory Survey Results for the Primary Auxiliary Building Remaining Walls at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) IR 05000029/20040022005-02-23023 February 2005 Report for Analysis of a Concrete Sample from the Yankee Nuclear Power Station, Rowe, Massachusetts (Inspection No. 50-029/2004-002) (Rfta No. 05-001) ML0513600812005-02-16016 February 2005 Confirmatory Survey Results for Class 3 Open Land Areas Outside the RCA, Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 04-007) IR 05000029/20040012004-09-20020 September 2004 IR 05000029-04-001, on 01/22/2004 - 08/05/2004, Yankee Atomic Electric Company IR 05000029/20030022004-02-12012 February 2004 IR 05000029-03-002, on 06/28/03 to 01/21/04, Yankee Atomic Electric Company, Rowe, Massachuetts ML0320401272003-06-24024 June 2003 Powerpoint Presentation at Yankee Rowe Connecticut Yankee Management Meeting with the NRC, June 23, 2003 IR 05000029/20020022003-01-27027 January 2003 IR 05000029-02-002, on 07/08/2002 - 01/03/2003, Yankee Atomic Electric Co., Rowe, Massachusetts. Decommissioning Activities IR 05000029/20020012002-08-12012 August 2002 IR 05000029-02-001, on 07/07/02, Yankee Atomic Electric Company, to Determine Whether the Decommissioning Activities Carried Out at Yankee Rowe Facility Were Conducted Safely and in Accordance with NRC Requirements IR 05000029/20010032002-03-20020 March 2002 IR 05000029/2001-003, Yankee Atomic Electric Company IR 05000029/19990021999-08-0404 August 1999 Insp Rept 50-029/99-02 on 990411-0714.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Safe Operation of Sf Pool,Radiological Controls,Organization & Mgt Controls & Auditing & C/As for Decommissioning Activities IR 05000029/19990011999-05-0505 May 1999 Insp Rept 50-029/99-01 on 990101-0411.No Violations Noted. Major Areas Inspected:Cold Weather Preparations for Spent Fuel Pool,Radiological Controls & self-assessment & Auditing & Corrective Actions for Decommissioning Activities IR 05000029/19980031998-10-0101 October 1998 Insp Rept 50-029/98-03 on 980601-0731.No Violations Noted. Major Areas Inspected:Decommissioning Activities,Including Mods to Spent Fuel Pool Bldg & Radiological Controls IR 05000029/19980011998-06-24024 June 1998 Insp Repts 50-029/98-01 & 50-029/98-02 on 980101-0331.No Violations Noted.Major Areas Inspected:Mod to SFP Bldg, Radiological Controls & Decommissioning Activities IR 05000029/19970021997-09-23023 September 1997 Insp Rept 50-029/97-02 on 970401-0814.No Violations Noted. Major Areas Inspected:Licensee Activities Re Decommissioning IR 05000029/19970011997-05-16016 May 1997 Insp Rept 50-029/97-01 on 970301-31.No Violations Noted. Major Areas Inspected:Facility Operations IR 05000029/19960041997-01-24024 January 1997 Insp Rept 50-029/96-04 on 961119-21.No Violations Noted. Major Areas Inspected:Insp Verified by Observation, Documentation Review &/Or Discussions W/Responsible or Involved Plant Staff IR 05000029/19960031996-10-16016 October 1996 Insp Rept 50-029/96-03 on 960827-29.No Violations Noted. Major Areas Inspected:Operations,Rp Program,Including Operations,Staffing,Mgt & Licensee Experience in Identifying & Correcting Weaknesses Re Control of Radioactive Matls IR 05000029/19930071993-12-28028 December 1993 Insp Rept 50-029/93-07 on 930826-1118.Violation Noted. Major Areas Inspected:Posting of Radiological Areas & Other Controls,Organization & Staffing,Exposure ALARA Program & Radiological Info Available to Workers IR 05000029/19930081993-11-0909 November 1993 Insp Rept 50-029/93-08 on 931018-19.No Violations Noted. Major Areas Inspected:Mgt Support & Audits Protected Area Barriers,Detection & Assessment Aids Protected Area Access Control of Personnel,Alarm Stations & Communications IR 05000029/19930051993-08-18018 August 1993 Insp Rept 50-029/93-05 on 930510-0731.No Violations Noted. Major Areas Inspected:Operations,Maint Engineering & Plant Support,Including Radiological Controls,Security,Fire Protection & Housekeeping & Administration IR 05000029/19920111993-02-0505 February 1993 Insp Rept 50-029/92-11 on 921114-930201.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Control, Security,Engineering & Technical Support & Safety Assessment & Quality Verification IR 05000029/19920101992-11-23023 November 1992 Insp Rept 50-029/92-10 on 921104-06.One Open Items Noted. Major Areas Inspected:Contamination Monitoring of Guardhouse,Postings & Other Controls,Radiological Control of Work in Progress & Organization & Staffing IR 05000029/19900231990-12-0505 December 1990 Insp Rept 50-029/90-23 on 901105-09.No Violations Noted. Major Areas Inspected:Liquid & Gaseous Radioactive Effluent Controls & Radiological Environ Monitoring Programs IR 05000029/19900161990-11-0606 November 1990 Insp Rept 50-029/90-16 on 900821-1001.Violation Noted.Major Areas Inspected:Daytime & Backshifts in Areas of Plant Operations,Radiological Controls,Maint & Surveillance, Emergency Preparedness,Security IR 05000029/19900811990-09-28028 September 1990 Insp Rept 50-029/90-81 on 900709-20 & 0806-10.Weaknesses & Unresolved Item Noted.Major Areas Inspected:Maint Program IR 05000029/19900121990-09-24024 September 1990 Insp Rept 50-029/90-12 on 900619-0820.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Security,Engineering/Technical Support,Safety Assessment/Quality Verification & Repts IR 05000029/19900141990-09-0707 September 1990 Rev 1 to Notification of Significant Licensee Meeting 90-110 on 900921 in Region I Ofc Re Insp Rept 50-029/90-14 IR 05000029/19900131990-08-0303 August 1990 Insp Rept 50-029/90-13 on 900709-13.One Noncited Violation Noted.Major Areas Inspected:Implementation of Radiation Protection Program During Current Refueling Outage & Review of Training & Qualification of Contractor Technicians IR 05000029/19900111990-08-0101 August 1990 Insp Rept 50-029/90-11 on 900619-22.No Violations or Deviations Noted.Major Areas Inspected:Safety Injection Tank Design & Replacement Procedures Together W/Walkdown of Safety Injection Sys Pumps,Valves & Piping IR 05000029/19890801990-07-25025 July 1990 Ack Receipt of Re Violations Noted in Insp Rept 50-029/89-80 IR 05000029/19900061990-07-24024 July 1990 Exam Rept 50-029/90-06OL on 900619-21.Exam Results:All Three Candidates Passed Exams & Issued Licenses IR 05000029/19900091990-07-16016 July 1990 Insp Rept 50-029/90-09 on 900515-0618.No Violations Noted. Major Areas Inspected:Operational Safety,Plant Operations, Radiological Controls,Maint & Surveillance,Emergency Preparedness,Security & Engineering/Technical Support IR 05000029/19900051990-02-16016 February 1990 Physical Security Insp Rept 50-029/90-05 on 900207-09.No Violations Noted.Major Areas Inspected:Implementation of Safeguards Info & Personnel Access Control Programs at Corporate Ofc IR 05000029/19890141989-08-31031 August 1989 Forwards Insp Repts 50-029/89-14 & 50-271/89-10 on 890717-21.No Violations Noted IR 05000029/19890111989-08-28028 August 1989 Insp Rept 50-029/89-11 on 890626-0731.Unresolved Items Noted Re Plant Operations Review Committee Actions to Address Task Force Investigation Results of 890725 Loss of Emergency Bus.Areas Investigated:Security & LERs IR 05000029/19890131989-08-23023 August 1989 Physical Security Insp Rept 50-029/89-13 on 890724-28.No Violations Noted.Major Areas Inspected:Action on Findings of NRC Regulatory Effectiveness Review,Mgt Support,Security Program Plan,Audits & Protected & Vital Area Physical 2023-10-04
[Table view] Category:Letter
MONTHYEARML23298A0532024-04-11011 April 2024 Exemption FA Cover Letter ML24085A2192024-03-11011 March 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML24085A2222024-03-11011 March 2024 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML24047A0552024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML24057A0212024-01-12012 January 2024 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage IR 07200031/20234012023-10-0404 October 2023 Yankee Atomic Electric Company - Independent Spent Fuel Storage Security Inspection Report 07200031/2023401 ML23157A1012023-05-0404 May 2023 Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(2) for the Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML23130A1562023-04-24024 April 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2022 ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML23080A1112023-03-0606 March 2023 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22340A4752023-02-24024 February 2023 Closeout Letter to Yankee Atomic Electric Company Regarding 2018 and 2021 Updated DFPs for Yankee Nuclear Power Station ISFSI ML23041A1132023-01-0505 January 2023 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests, and Experiments ML23041A1122023-01-0505 January 2023 Independent Spent Fuel Storage Installation, 10 CFR 50.59 Changes, Tests, and Experiments Report ML22347A2802022-12-21021 December 2022 Yankee Atomic Electric Company - Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22237A0632022-08-0303 August 2022 Yankee Atomic Electric Company - Supplemental Information for the Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML22136A1562022-04-28028 April 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2021 ML22119A2112022-04-18018 April 2022 Independent Spent Fuel Storage Installation - Yankee Atomic Electric Company Adoption of NAC-MPC System, Amendment 8 Certificate of Compliance and Canister Registration ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22011A1292022-01-31031 January 2022 Yankee Atomic Electric Company- Independent Spent Fuel Storage Installation Security Inspection Plan ML22038A2062022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML22038A1982022-01-20020 January 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML22010A0122022-01-10010 January 2022 Yankee Atomic Electric Company - Three-Year Update to the Independent Spent Fuel Storage Installation Decommissioning Funding Plan IR 05000029/20210012021-10-29029 October 2021 Yankee Atomic Electric Company - NRC Independent Spent Fuel Storage Installation Inspection Report 07200031/2021001 and 0500029/2021001 ML21287A1012021-10-0404 October 2021 Yankee Atomic Electric Company - Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update to the Yankee Nuclear Power Station License Termination Plan ML21291A1602021-10-0404 October 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Biennial Update of the Yaec Quality Assurance Program ML21287A0362021-10-0404 October 2021 Biennial Update to the Yankee Nuclear Power Station Final Safety Analysis Report ML21189A0502021-06-0101 June 2021 Independent Spent Fuel Storage Installation, Formal Announcement of Change in ISFSI Manager ML21062A2472021-04-0707 April 2021 Close-out Letter - Yankee Rowe ISFSI DFP ML21105A7382021-03-0202 March 2021 Yankee Nuclear Power Station Independent Sperit Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21042A1452021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Property Insurance Coverage ML21042A9812021-01-27027 January 2021 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Nuclear Liability Insurance Coverage ML21028A0632021-01-26026 January 2021 M210211: Welcome Letter to W. Norton 05000029/LER-2021-001, Compensatory Measure Not Established for a Momentary I/O Board Communication Loss2021-01-12012 January 2021 Compensatory Measure Not Established for a Momentary I/O Board Communication Loss ML20167A3032020-07-10010 July 2020 Letter - Ynps Exemption 190502, Rev 0 ML20167A3022020-07-0202 July 2020 FRN - Ynps Exemption 190502, Rev 0 ML20162A1282020-06-23023 June 2020 Issuance of Temporary Exemption from 10 CFR Part 73, Appendix B, for Yankee Rowe ISFSI (COVID-19) ML20160A0402020-05-20020 May 2020 BYR 2020-014 - Yaec Letter BYR 2020-014 Temporary Exemption - Annual Physical Requirement ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20108F5362020-03-12012 March 2020 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML20054B6392020-02-0606 February 2020 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML20015A4942020-01-15015 January 2020 Yankee Atomic Power Company - Independent Spent Fuel Storage Installation Security Inspection Plan ML20013F6882019-12-17017 December 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in Isfsj Manager ML19295E1062019-10-0202 October 2019 Biennial Update of the Yankee Atomic Electric Company Quality Assurance Program (Rev. 39) for the Yankee Rowe ISFSI ML19165A0262019-06-0505 June 2019 Independent Spent Fuel Storage Installation - Formal Announcement of Change in ISFSI Manager ML19176A0752019-05-0202 May 2019 Independent Spent Fuel Storage Installation - Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML19121A4202019-04-23023 April 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report, Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2018 ML18354A7382018-12-10010 December 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Three-Year Update to the Decommissioning Funding Plan IR 05000029/20180012018-05-30030 May 2018 Yankee Atomic Electric Company, Rowe, Massachusetts Site - NRC Independent Spent Fuel Storage Installation Report Nos. 07200031/2018001 and 05000029/2018001 2024-04-11
[Table view] |
Text
i
- r I I RECEIVED 0 -1Eh I S T E RYicy 1 OAK RIDGE INSTITUTE FOR SCIENCE AND EDUCATION Mi-. John Hickman Division of Waste Management and Environmental Protection U.S. Nuclear Regulatory Commission Two White F h t North " L "-- .' ,~
Mail Stop: 7F27 11545 Rochde Plke Rockville, M D 20852-2738
SUBJECT:
IN-PROCESS INSPECTION SURVEY RESULTS FORTHE REMAINING SPENT FUEL POOL AND NORTHEASTERN UPPERRCAYARD EXCAVATIONS AND CONCRETE STRUCTURES WITHIN THE EXCAVATIONS AT THE YANKEE NUCLEAR POWER STATION, R O W ,
MASSACHUSETTS [DOCKET NO. 50-29; RFTANO. OS-0081
Dear Mi-. Hickman:
The Oak Ridge Institute for Science and Education (ORISE) performed in-process confirmatory inspection survey activities on the remaining Spent Fuel Pool (SFP) and Northeastern Upper RCA Yard excavations at the Yankee Nuclear Power Station in Rowe, Massachusetts during the period of December 6 and 7,2005. These survey activities were requested and approved by the U.S. Nuclear Regulatory Commission (NFKJ. At the request of the NRC site representative, ORISE also performed cwsorysurvey activities on the remaining concrete structures in these areas. Enclosed are the in-process surveyresults documenting these survey activities. The survey activities included gamma surface scans and soil sampling within the excavations and beta surface scans and direct measurements for total net beta activity on the remaining concrete surfaces.
If you have any questions or comments, please direct them to me at 865.576.0065 or J. Scott Kirk at 865.574.0685.
Wade C. Adam Health Physicist/Project Leader Survey Projects WCArar Enclosure C: T. McLaughlin, NRO'NMSS/"WFNT-7El8 E. Abelquist, ORISE E. Knox-Davin, NRO'NMSS/TWFN 8A23 S. Kirk, ORISE J. Kottan, NRC/Region I File/ 1672 Distribution approval a n d concurrence: Initials Technical Management Team Member \F-K Laboratory Manager RPC w t y Manager f2.T Voice: 865.576.0056 Fax: 865.241.3497 E-mad: AdamsW@ orau.gov
IN-PROCESS INSPECTION SURVEY RESULTS FOR THE REMAINING SPENT FUEL POOL AND NORTHEASTERN UPPER RCA YARD EXCAVATIONS AND CONCRETE STRUCTURES WITHIN THE EXCAVATIONS AT THE YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS INTRODUCTION The U.S. Nuclear Regulatoiy Commission (NRC) requested that the Oak Ridge Institute for Science and Education (ORISE) perform an in-process inspection survey of the remaining Spent Fuel Pool (SFP) and Northeastern Upper RCA Yard Excavations suivey units (SU) at the Yankee Nuclear Power Station (YNPS). While on site, the NRC site representative also requested that ORISE perform cursory survey activities on the remaining concrete structures (pedestals and walls) w i h these excavations. The in-process inspection surveys were performed during the period of December 6 and 7,2005.
PROCEDURES In-process inspection surveys were performed in accordance with a site-specific survey plan that was submitted to and approved by the NRC (ORISE 2005a). The site-specific survey plan follows tlie guidance provided in the ORISE Survey Procedures and Quality Assurance Manuals (ORISE 2004 and 2005b).
Remaininp Concrete Structures Beta surface scans were performed using Geiger-Muller (GM) pancake detectors coupled to ratemeter-scalers with audlble indicators. Surface scans were performed on up to 60% of the remaining concrete surfaces. Particular attention was given to cracks, joints, and scabbled areas in the evaluated structural surfaces where material may have accumulated. Direct measurements for total net beta activity were performed at ten locations on the concrete structures whch were available for in-process survey activities. At the discretion of the NRC site representative, smear samples were not deemed necessaiy. Figures 1 through 10 are digital photographs indicating the portions of the remaining pedestals and walls that were part of these survey activities. Locations where direct measurements were taken are indicated on these figures.
NOL-05-02 and NOL-01-04 Excavations Garnma surface scans were performed on up to 80% of accessible portions of the two SU soil excavations using sodium iodide (Nag scintillation detectors coupled to ratemeters with audible indicators. Soil samples were collected from three locations in NOL-05-02 and six locations in NOL-01-04. Figures 11 and 12 indlcate the soil excavation survey units that were part of these survey activities. Locations where soil samples were taken axe indicated on these figures.
SAMPLE ANALYSIS AND DATAINTERPRETATION Radiological data and sample media were returned to ORISEs laboratoiy in Oak Ridge, TN for analysis and interpretation. Radloassays were performed in accordance with tlie ORISE Laboratoiy Yankee Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection Survey Results
Procedwres Manual (ORISE 2005~).Soil sarnples were analyzed by gamma spectroscopy for the primary radionuclides-of-concern (ROC (i.e., CO-60 and Cs-137)]. However, spectla were also reviewed for additional gamma-emitting fission and activation products associated with the YNPS and other identifiable total absoiption peaks, Soil sample results were reported in units of picocuries per gram (pCi/g). Direct measurement data were converted to units of disintegrations per minute per 100 square centimeters (dpm/100 cm?.
FINDINGS AND RFSULTS Remaininp Concrete Structures Beta surface scans did not identify any areas of elevated activity on the remaining concrete suxctures. Total net beta activity measurements ranged from -600 to 900 dpm/l00 cm. A complete listing of the surface activity level results is presented in Table 1.
NOL-05-02 and NOL-01-04 Excavations Gamma surface scans identified four locations of elevated direct gamma rahation on the soil surfaces in SU NOL-01-04 and none in SU NOL-05-02. ORISE collected three soil samples from the SU NOL-05-02 and six soil samples from SU NOL-01-04. Three of the six samples from NOL-01-04 were from three of the four elevated h e c t gamma radlation locations identified during the gamma surfaces scans. ORISE requested that the three soil samples from the elevated l r e c t gamma radmion locations be analyzed by the on-site Yankee Atomic Electric Company (YAEC) radioanalytical laboratory and the results ranged from 12 to 309,000 pCi/g of CO-60and 78 to 1,200,000 pCi/g of Cs-137. Further investigations by the licensee and by the ORISE laboratoiy indicated that the eIevated gamma activity was attributable to discrete particles within the soil matrices of the samples. The ranges of radionuclide concentrations for the six soil samples collected by ORISE (without discrete particles in the samples) were 0.01 to 0.10 pCi/g for CO-60and 0.01 to 0.07 pCi/g for Cs-137. The radloactivity w i k the discrete particles for Samples 29,31 and 32 ranged from -2.7 x to 1.41 pCi for Co-60 and 7.5 x l o 4to 1.41 pCi for Cs-137. A complete listing of the soil sample and discrete particle results is presented in Table 2.
SUMMARY
Since this was an in-process confirmatoiy suivey, the licensee did not have fmal status sumey (FSS) data avadable for review. YNPS personnel provided prelirmnary direct measurement and soil sample results to ORISE while on site.
Beta surface scans dld not identify any areas of elevated beta activity on the remaining concrete structural surfaces within the excavations. Direct measurements were performed at ten locations and all results were well within the derived concentration guideline levels (DCGLs) for CO-60 and Cs-137 as provided in the License Termination Plan FTP (YAEC 2004)]. The h e c t measurement results were also w i k the gross beta activity DCGL as determined by YAEC personnel. Therefore, the results of the survey activities for the remaining concrete structural surfaces confamed that the radiological conditions were suitable for unrestricted use in accordance with cleanup criteiia cited in the licensees LTP.
Gainma surface scans identified four locations of eIevated direct gamma radiation within the NOL-01-04 soil excavation. ORISE personnel collected soil samples from three of the four locations and Yankee Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection Survey Results 2
had the samples analyzed bythe YAEC on-site laboratoryin the presence of ORISE personnel. The YAEC analytical results exceeded the site DCGL's for (3-60 and (3-137. The fourth location identified by ORISE was remediated by YAEC personnel; a discrete particle exceeding DCGL values was identified by YAEC. ORISE collected six additional samples from judgmentally- selected locations. Gamma spectroscopy results for the six samples indicated that the ROC'S were well below the DCGL's while the results for the three discrete particles indicated Co-60 and Cs- 137 activity at up to 1,400,000 pci, each.
The in-process confirmatorysurveys determined that detectable activity, in excess of the soil DCGLs, was present in four soil samples within the Northeastern Upper RCA Yard Excavation.
Therefore, the results of the survey activities for the soil excavations failed to confirm that the radiological conditions were suitable for unrestricted use in accordance with clean up criteria cited in the licensee's LTP.
Yankee Nuclear Power Station 3 1672\Repom\2006 13 In-Process Inspection SurveyResults
Figure 1:BRTO1-12 Facing North-Direct Measurement Location #1 Figure 2 NSY12-01 East Side of Pedestal-Direct
- Measurement Location 2 Yankce Nuclear Power Station 4 1672\Reports\2006-03-13 In-Process Inspection Sunfey Results
Figure 3: NSY12-01 South Side of Pedestal-Direct Measurement Location # 3 Figure 4 BRTO1-13 West Top of Block-Direct
- Measurement Location 4 Yankee Nuclear Power Station 5 lG72\Reports\2006-03-13 In-Process Inspection Survey Results
Figure 5: BRTO1-13 Top of Block-Direct Measurement Location #5 Figure 6: SVCO1-18 West Side-Direct Measurement Location #6 1672\Reports\2006-03-13 In-Process Inspection Suncy Rcsults Yankee Nuclear Power Station 6
Figure 7: SVCO1-18 West Side-Direct Measurement Location #7 Figure 8: SVCO1-18 South Side-Direct Measurement Location #8 Yankcc Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection SunTey Rcsults 7
Figure 9: SVCO1-18 South Side-Direct Measurement Location #9 Figure 10: SVCO1-18 South Side-Direct Measurement Location #10 Yankee Nuclear Power Station 8 1672\Reports\2006-03-13 In-lrocess Inspection Sun-ey Results
1672-008 (1) 21 R
MEASUREMENT/SAR/IPLING LOCATIONS N
\
- SURFACESOIL FEET 0 24 I
8 METERS FIGURE 11: Yankee Nuclear Power Station, Survey Unit NOL-05 Measurement and Sampling Locations Yankee Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection SurveyResdts 9
1672-007 (1) 34 I
MEASUREMENT/SAMPLING LOCATIONS N
\
- SURFACESOIL FEET n 24 I
8 METERS FIGURE 12: Yankee Nuclear Power Station, Survey Unit NOL-01 Measurement and Sampling Locations 1672\Repo1t~\2006-03-13 In-Process Inspection Survey Resdcs Yankee Nuclear Power Station 10
TABLE 1 SURFACE ACTIVITY LEVELS REMAINING CONCRETE STRUCTURES YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS Total Net Beta Activity Location" (dpd100 cm2) 1 -300 k l , l O O b 2 600 k 1,200 3 900 k 1,200 4 300 f 1,200 5 -600 k 1,000 6 -100 k 1,100 7 200 k 1,100 8 0
- 1,100 9 -600 2 1,000 10 -300 k 1,200 Yankee Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection Survey Results 11
TABLE 2 RADIONUCLIDE CONCENTRATIONS IN SOIL AND DISCRETE PARTICLE SAMPLES REMAINING SPENT FUEL POOL AND NORTHEASTERN UPPER RCA YARD EXCAVATIONS YANKEE NUCLEAR POWER STATION ROWE, MASSACHUSETTS co-60 cs-137 Soil Samples (pci/g)b 1672S0026 0.03 i: 0.04' 0.07 k 0.04 1672S0027 I 0.04 2 0.03 I 0.05 f 0.02 1672S0028 I 0.02 k 0.03 I 0.02 2 0.03 I
~
1672S0030 I 0.01 2 0.03 0.01 i: 0.02 1672S0033 I 0.10 & 0.06 I 0.06 & 0.03 1672S0034 I 0.03 f. 0.03 I 0.05 f 0.02 1
~~~ ~~
Discrete Particle Samplesd (pCi 1672S0029 0.56 i: 0.02 7.5 1 0 .i~: 9.7 1672S0031 -2.7 2.5 1.41 -t 0.14 1672S0032 I 1.41 f. 0.41 I 0.10 f. 0.01 aRefer to Figures 11 and 12.
bThe LTP DCGL values are 3.0 pCi/g for Cs-137 and 1.4 pCi/g for co-60.
CUncertainties represent the 95% confidence level, based on total propagated uncertainties dData are quahfied. Geometries have not been established for this type of sample.
Yankee Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection Survey Results 12
REFERENCES Oak Ridge Institute for Science and Education (ORISE). Survey Procedures Manual for the Environmental Survey and Site Assessment Program. Oak Ridge, Tennessee; September 2,2004.
Oak Ridge Institute for Science and Education. Proposed-In-Process Survey Plan for the Remaining Spent Fuel Pool and Northeastern Upper RCA Yard Excavations, Yankee Nuclear Power Station, Rowe, Massachusetts pocket No. 50-29; RFTA No. 05-0081. Oak Ridge, Tennessee; December 1,2005a.
Oak Ridge Institute for Science and Education. Quality Assurance Manual for the Environmental Survey and Site Assessment Program. Oak fidge, Tennessee; July 28,2005b.
Oak Ridge Institute for Science and Education. Laboratory Procedures Manual for the Environmental Survey and Site Assessment Program. Oak Ridge, Tennessee; June 20,2005~.
Yankee Atomic Electric Company (YAEC). Yankee Atomic Electric Company (YAEC) License Termination Plan &Ifor ) the Yankee Nuclear Power Station (YNPS). Revision 1. Rowe, Massachusetts; November 2004.
Yankcc Nuclear Power Station 1672\Reports\2006-03-13 In-Process Inspection Sunrcy Results 13